Objectives
Provide vertical and horizontal
communication infrastructure
Achieve e-Governance commitment
Bring governance closure to public
Provide efficient service delivery system
Strengthen disaster management
capacity

Implementing Agency (RSWAN


Operator)
Consortium of
Bharti Aitel Ltd., Jaipur - Lead
Bidder
Bharti Airtel Services Ltd.
Trimax IT Infrastructure & Services Ltd.

Three layer Hierarchical StructureVertical Segment


Three layer hierarchical architecture

RajSWAN Architecture - Vertical


Segment
281 Points of Presence (PoPs)
State Headquarter at State Data
Centre,
Jaipur
33 District Headquarters at
Collectorates/
Zilla Parishads
247 Block Headquarters at
Panchayat

Horizontal Segment

RajSWAN Architecture - Horizontal


Segment

Connecting 3381 offices across the


state
Offices of 18 departments to DHQ
except Jaipur
Offices of 11 departments with
BHQ PoP
33 collectorate offices with DHQ
4 GoR offices at New Delhi to SHQ
RajCOMP Info Services Ltd.

Horizontal Segment- District Level


Offices
Vidyut

Vitran
Nigam Limited
(VVNL)
Agriculture
Department
PHED
PWD
Irrigation
Co-Operative
Department
Industries
Education
Forest

Ground

Water
Development (GWD)
Commercial Tax
Department (CTD)
Registration and
Stamps
Medical and Health
Social Welfare
Transport
Tourism
District Collectorate
Office (Over OFC)

Horizontal Segment- Block Level


Offices
Sub

Divisional
Magistrate (SDM)
Block
Development
Officer (BDO)
Police Circle Office
PHED
PWD

Irrigation
Education
Vidyut Vitran Nigam
Limited (VVNL)
Forest
Agriculture
Department
Commercial Tax
Department
Tehsil Head Quarter
Office

Action at District level


Nodal

Officers to be appointed at
district and block levels
District level nodal officer minimum
rank of ADM/CEO
Block level nodal officer Block
Development Officer or equivalent
Guidelines

intimated to district collectors


latest vide letter No. 4.3(137)/ RajCOMP/
Tech/ 2007/ 162 dated May 6, 2011

PoP Site Requirements


Civil

work and furniture

Room size minimum of min 10*10


sq. ft.
Provision for Diesel Generator.
Height of finished room - minimum
9.00 ft.
Proper electrification and lighting
One storage almirah with locking
system

PoP Site Requirements


Civil

work and furniture


(Contd)
Provision for 2 seats with tables and
chairs
Proper room renovation
Provision for installation of split/
window AC
Room should be lockable and should
have Single door entry.
Wall mounted Cabinet Racks
Wall fitted Gas based Fire
extinguishers

PoP Site RequirementsContd...


Electrical

work and electrical


equipments

Separate Single phase Power


Connection with sub-meter for 10KW
power consumption.
Specified power requirements
Power Points
Electrical distribution box
Earth Pit (for all the basic electrical
connections)

PoP Site RequirementsContd

PoP Site RequirementsContd

Fund Allocation for Site


preparation

RajCOMP Info Services Ltd.

Webpage

Details and updates available at the


RISL website
www.rajcomp.net/

RajCOMP Info Services Ltd.

Status of Site preparation


and
Appointment
of
Nodal
S. District
Nodal
No. of
PoP
UC
No. Officers
Officer
PoPs
Status
Receiv
appointed to be
ed
Distr Bloc establi Compl Under Yet to
ict
k shed
eted Constr
be
Leve leve
uction Start
l
l
ed

1
2
3
4
5

Ajmer
Alwar
Banswara
Baran
Barmer

9
15
9
8
9

Bharatpur
Bhilwara
Bikaner
Bundi
Chittorgar
h
11 Churu

10
12
8
6
12

6
7
8
9
10

9
6
4
1
4
8
Tehsils
8
All PoPs established on Tehsil
Level since 2008
-

S.
No.

17

Nodal Officer No. of


appointed
PoPs to
be
establish
ed 8
Hanumangar

h
Jaipur
14

18

Jaisalmer

19

Jalore

20

Jhalawar

21

Jhunjhunu

22

16

District

PoP Status

UC
Receiv
ed

Jodhpur

11

23

Karauli

24

Kota

Nagaur

12

26

Pali

11

27

Pratapgarh

28

Rajsamand

29

30

Sawai
madhopur
Sikar

25

31

Sirohi

32

Tonk

Udaipur

33

12

Vous aimerez peut-être aussi