Académique Documents
Professionnel Documents
Culture Documents
220kV Tabert
Substation
110kV Clahane
Substation
Variable
CCGT
High Efficiency
Cogeneration
Transmission Network
Lower Impact
Higher Impact
Power Losses
Heat Market
Required
Not Required
Fuel consumption
-33%
+33%
CO2 Emission
-67%
+67%
Water Consumption
-30%
+30%
630
1200
Grid Code contains general conditions and rules for general application.
The specification and conditions for each application are adjust
individually.
Those information are included in Grid Connection Offer & Agreement
between developer and Transmission Operator TSO.
Client (Requires connection) and TSO must implement Grid Code
specification
during each stages of the project, for project above 10MW
TSO may disconnected or terminated the Grid Connection Agreement
if the Grid Code is not implemented by client.
The Implementation of the Grid Code may have significant impact on the
cost of the Grid Connection
ESB Networks Electrical Safety Rules must be implemented
Variable
Cost
210000000
2 bay 110kV/220kV
Substation
4420000
220kV OHL
710000/km (12km)
110kV OHL
320000/km (15km)
2150000/km
Total Cost
227740000