Group E: Faris Al Amer, Josiah Johnson, Nasrin Sadeghi & Zeishan Muhammad
More
sustainabl
e
Minimal
restrictions
Minimum
reduction in
floor heights
Steel
Cellular
Beams
No carbon
footprint
Construction
Sequence
Web
openings
for
services
25% to 30%
weight
savings
Foundations
Excavation, forming and placement of the concrete
foundations. Forming and placement of the ground floor
slabs.
Steel
Erection
The erection of the steel building frame, including
primary
& secondary beam members, columns, bracings &
temporary steel for construction.
Forming Floors, Roof & Masonry
Installing slabs. Forming, placing & finishing the concrete roof of the structure. The interior & exterior masonry of the
building, including the elevator & utility cores.
& of
Cladding
Placement of lightweight concrete fill andRoofing
installation
roof drains. Brickwork cladding on the structure's
exterior.
Windows & Closures
Building Finishes
The detailed work of completing the interior of the building. Insulation, drywall, paint, elevators, plumbing,
electrical, carpeting, furniture, and so on.
Structural Framing
12
m
8m
8m
8m
12
m
10
m
6m
12
m
10
m
6m
12
m
10
m
6m
6m
6m
12
m
6m
6m
12
m
5m
Basement Construction
Foundation
Foundation is located
within gravel which has a
high bearing capacity. Pad
foundations will be used.
Main advantages include:
Little excavation is
required
Suitable for tight site
Basement
Retaining Wall
areas
Economical
Advantages of secant piles:
Phase 1
Phase 2
Phase 3
Drilling
Withdrawal &
Concreting
Steel
Cage
Installation
Construction:
Primary Piles
Secondary Piles
Site Constraints
Materials Delivery:
Materials Storage:
Sustainability
Clock Tower