Académique Documents
Professionnel Documents
Culture Documents
on
Manufacturing Process of Tower Parts
BRIEF PROCESS HAPPENED IN PLANT
INTRODUCTION
INNOGRATION 1967
PLANT CAPACITY-42000tn
1000KV TESTING TOWER
DEPARTMENTS: PROJECT AND PLANNING
QA
YARDS
PRE-PRODUCTION
STORES
SAFETY
COMMERCIAL
MATERIAL
LOGISTICS
PRODUCTION
FABRICATION
GALVANISATION
PE
DEPARTMENT
MARKETING
AWARD OF
CONTRACT
WO & BAR
CHART(L2)
CENTRAL
PLANNING
WO
LOA/ WO
MEETING
(ALLOCATION OF
PROJECT)
PRS
RELEASE OF
DRAWING
D&D
BOM
SKETCH
DRAWING
CONTINUE
PREPRODUCTI
ON
BOM
SKETCH
DRAWING
PROTO
SKETCH &
BOM
PREPRATIO
MONTHLY
PRS
PROTOTYP
E TESTING
PRS
FINAL
BOM &
SKETCHES
PROJECT/SI
TE
PR
S
CONTINUE
C
C
PRS/LOA/L2/BOM
PLANNING
IPP/IDP/MRP/
SCHEDULING
(MIR/RS/PO)
MRP INDENTS
RECEIPT OF STEEL BY
RAW MATERIAL
RELEASE FOR
PRODUCTION
D
MATERIAL
PROCUREMENT
CONTINUE
D
MIR/RS/IPP/IDP
PRODUCTION
QC IN
PROCESS
FABRICATION
RS
IPP/IDP
GALVANISATION
QUALITY
CLIENT
INSPECTION OF FG
QC IN
PROCESS
MICC & IR
CONTINUE
PROJECT
DEPARTME
NT
BUNDLING PLAN
PACKING LIST
FINISH
YARD
LOGISTI
CS
SHIPPING
DISPATCH
COMPLETION
CERTIFICATE
(PACKING LIST)
BUNDLING
/PACKAGING
DISPATCH OF
MATERIAL
SHIPPING
ACCOUNT
DEPARTMENT
(BILLING)
PLANNING OUTPUTS
Outputs
Department
All Departments
All Departments
MRP
Materials Department------Vendors
Shop Scheduling
To Scheduling
Dispatch Plannig
L2 Schedule
Delivery Requirement
Load
Proto
Steel and BNA time
Inspection
Delivery cycle (90
days)
PRODUCTION
Shop Floor
Raw Yard
Fabrication
Inspection
Galvanizing
Finish Yard
CNC: STAMPING
PUNCHING
CROPING
6 CNC
4 WITH CAPACITY 4500 HOLES AND 7 MT
2 WITH CAP 3500 HOLES AND 6 MT
NOTCHING:
F CUT
C CUT
B CUT
POCKET CUT
CORNER CUT
CAP: 7MT 1500
BENDING
Close Bend
Inside Flange
Heel Bend
Outside Flange
Peek
Jogal Bend
Tamper Bend
DRILLING
HEEL CUTTING
WELDING
SKETCH
MIR
ROUT SHEET
M/C LOADING PLAN
RUN TIME DASHBORD
DAILY PRODUCTION REPORT
OVERALL EQUIPMENT EFFICIENCY(OEE)
AVALABILITY*PERFORMANCE*QUALITY
INSPECTION REPORT
MIS
WIP
GALVANIZING
LOADING
DEGREASING
PICKLING
RAISING
FLUXING
DRYING OVEN
HOT ZINC DIPPING
QUENCHING
PASIVATION
QA
GALVANIZING..
LOADING
DEGREASING
To remove oil, dust, paint and grease from surface of material
Alkaline solution is used along with degreasant which form emulsion
PICKLING
To remove impurities(rust, inorganic contaminants, stains etc)
3 TANKS ARE AVALAIBLE OF different acidic strength
Iron concentration(<160gm/ltr)
hydrogen embrittlement
RAINSING
Should not be acidic ph>3
To remove acid from surface of steel
FLUXING
To avoid oxidation of steel
Mixture of Zncl2 and NH4cl
Formation of zinc ammonium chloride film(Zn2(NH4)2Cl4)
Dipping the fluxed material in molten zinc produces HCL and other toxic gases
DRYING OVEN
LPG GAS AND HSD IS USED AS FUEL
TEMP-70-150 C
To avoid spurting temp difference is minimised
QUENCHING
Cold water
PASIVATION
Dichromate solution is used
To avoid direct contact of zinc to atmosphere
Reduces reactivity
QA
Quality Assurance
QA AT DIFFERENT STAGE
Inventory
Fabrication
At
At Shop
Shop Raw
Raw Yard
Yard
Checking
Checking the
the quality
quality of
of steel
steel and
and BNA
BNA
Root
Root Sheet
Sheet
Before
Before heading
heading to
to galvanizing
galvanizing inspection
inspection yard
yard
Piece
Piece wise
wise checking
checking wrt
wrt to
to root
root sheet
sheet
Green
Green Paint
Paint
White
White Rust
Rust
Black
Black Spot
Spot
Alco
Alco Meter
Meter Test
Test
Temperature
Temperature
Check
Galvanizing Chemical andCheck
Chemical and ph
ph value
value
Bundling
Bundling
Finish Yard
IT Department
Planning
Materials
Finish Yard
Raw Yard
Logistics
Tower accessories
Conductor
Earth wire
Damper
Hanger
Insulators
Arcing horn
Bird guard
Types of Tower
HORIZONTAL
Single Circuit
(Types: A, B ,C ,D)
Used for high KV transmission lines
Difficult to design & manufacture
Features:
Legs
Waist
K-Frame
Boom
Cross-arms
Earth wire peak
VERTICAL
Double circuit
(DA,DB,DC,DD)
Multi Circuit
( MA,MB,MC,MD)
Used for lower KV Transmission
Easy to design & manufacture as
compare to Horizontal towers
Features :
Legs
Body
Cross-arms
Earth wire peak
Store
Thank You!!!!!!