Bahawalnagar _City _ Report (WCDMA)

C-4 Region

Contents
Introduction
Geographical view and area profiling
DT KPI summary
DT Results
Bad Patch Analysis & Bottlenecks
Conclusion

Introduction

> Internal Only

Drive Test of Bahawalnagar City has been conducted.


Drive Testwas performed withTEMSequipment.
Each call was of180secduration with a15secgap between eachcall
Testing scenarios were as follows:
MS1 - Idle Mode
(WCDMA Locked)
MS2 - Dedicated Mode (Dual mode)
MS3 - Data
(WCDMA Locked)
Results has been shown in next slides.

ZTE Corporation. All rights reserved.

Geographical view & Area profiling

> Internal Only

oute has been followed for Bahawalnagar Drive test.


Google view

Area Profiling & Drive Route

9 sites has been installed in the Bahawalnagar city


Dual carrier with carrier 10562 (F1) & 10587 (F2) has been provided to Bahawalnagar city

ZTE Corporation. All rights reserved.

D .T KPIs
Summary
MAJOR KPIs
CS CDR %
CSSR (RRC+RAB)
%
SHO %
*Quality %
**Coverage %
***Throughput %
Throughput Avg.
(MB/s)

Confidential

PRE

POST

0%

0%

100%

100%

100%
89.98%
99.21%
92.23%

100%
96.45%
99.33%
97.69%

6.67 Mb/s

7.72 Mb/s

* Quality = No of samples (0 to -12) / Total Number of samples


** Coverage=No of samples (0 to -95) / Total Number of samples
*** Throughput= No of samples >2Mb/s) Total Number of samples
5

ZTE Corporation. All rights reserved

Drive test Results

Idle RSCP
Comparison

PR
E

PRE

Pos

Post
t

According to Results Post RSCP-Dedicated


improves to 0.12% with respect to Pre.

Pr
e

Po
st

IDLE RSCP

> Internal Only


> Internal
Only

IDLE RSCP

ZTE Corporation. All rights reserved.


ZTE
Corporation. All rights reserved.

AS EcNo
Comparison

PR
E

PRE

Pos

Post t

Bad patches of the EcNo has been removed.


According to Results Post EcNo-Dedicated
improves to 6.47% with respect to Pre.

Pre

Pos
t

Dedicated EcNo Graph

> Internal Only

ZTE Corporation. All rights reserved.

RLC DL Throughput
Comparison

PR
E

PRE

Pos

Post
t

According to Results Post DL throughput


improves to 5.46% with respect to Pre.

Pre

Pos
t

RLC/Trsp DL Throughput Graph

> Internal Only


> Internal
Only

ZTE Corporation. All rights reserved.


ZTE
Corporation. All rights reserved.

AS RSCP
Comparison

PR
E

PRE

Pos
Post
t

According to Results Post RSCP-Dedicated


improves to 0.13% with respect to Pre.

Pre

Pos
t

Dedicated RSCP Graph

> Internal Only


> Internal
Only

ZTE Corporation. All rights reserved.


ZTE
Corporation. All rights reserved.

IDLE EcNo Comparison

PRPRE
E

Pos

Post t

According to Results Post Idle-EcNO


improves to 8% with respect to Pre.

Pr
e

Po
st

CQI Comparison

PR PRE
E

Post

Pos
t

According to Results Post CQI improves to


7% with respect to range 24 to 30.

Pr
e

Po
st

64 QAM Comparison
According to Results Post 64 QAM improves
to 2% with respect to Pre in range between
75 to 100.

Pr
e

PR PRE
E

Pos

Postt

Po
st

16 QAM Comparison

PRPRE
E

Post Pos
t

According to Results Post 16 QAM improves


to 33% in 75 to 100 with respect to Pre.

Pr
e

Po
st

QPSK Comparison
According to Results Post QPSK reduced to
7.54% in range 75-100% with respect to
Pre.

Pr
e

PRE
PR
E

Pos

Postt

Po
st

IDLE SC Comparison
According to Results in post drive all sectors are covering their respective area
No coverage clash observed in post drive

Pr
e

Po
st

Serving System
Comparison

PR PRE
E

Pos
Post
t

According to Results of Post DT all IRAT


patches has been rectified

Pr
e

Po
st

Bad Patches Rectification

Bad EcNo Patch Comparison


All bad patches has been successfully removed
A little degradation is still observed near patch 2 due to large inter site Distance
For further improvement of patch 2 new site require

Pr
e

Po
st

Bad EcNo Patch (1)


Patch #
EcNo-1

Observations

Recommendations

Action Taken

Weak quality is observed on the patch

Bad Quality patch is observed near


Jinnah Physical Down tilting require to
enhance quality

Site 5984 is
downtilted

Pr
e

Po
st

Bad EcNo Patch (2)


Patch #
EcNo-2

Observations

Recommendations

Action Taken

Weak quality is observed on the patch

Bad Quality patch is observed near


Minchanabad road. It is due to null
formation of 7019

Site 7019 is redesign

Pr
e

Po
st

Bad EcNo Patch (3)


Patch #
EcNo-3

Observations

Recommendations

Action Taken

Weak quality is observed on the patch

Bad Quality patch is observed near


jhangeer garden .It is due to illogical
serving of 3602_2

Site 3602 is redesign

Pr
e

Po
st

Bad EcNo Patch (4)


Patch #

Observations

Recommendations

Action Taken

EcNo-4

Weak quality is observed on the patch

Illogical serving of 5685 is observed near


kabola road .

Site 5684 is
downtilted

Pr
e

Po
st

New Site Recommendation

New site
recommended to
improve coverage
in the area.

Weak Quality/Throughput is observed


near Minchanabad road
Inter site distance of site 7019 is
2.34Km.
Improvement has been made by
changing azimuth of 7019 but still
little degradation observed due to
large distance
This is not a dense populated area
New site is recommended in the

Conclusion

Confidential

Satisfactory Coverage & EcNo in the post drive


No accessibility and retainibility issue found, all call are connected
successfully
Improvement has been observed for DL throughput in post drive
Overall condition is satisfactory expect on patch 2 where new site
require for further improvement

29