November, 2010
DEPARTMENT OF PROJECT
DEVELOPMENT
On Going Projects
Construction Progress
Details
DEPARTMENT OF
PROJECT
DEVELOPMENT
Unique Group
at Level 9
UNIQUE HEIGHTS
UNIQUE HEIGHTS
UNIQUE HEIGHTS
Superstructure Work
Finishing Works
Drawing, Design and
various work order
Sanitary and Plumbing
Work
Electromechanical work
Project Construction
Work Planning for Coming
Month
Risk/ Threat for
Construction Work Progress
Facing Legal Issue (If
Borak
Real Estate (Pvt.) Ltd .
any)
UNIQUE SUNFLOWER
12, Islampur, Kumartoli, Dhaka.
Residential Building.
Last Months Construction Work
Progress Detail History
Superstructure Work
Finishing Works
Drawing, Design and various work
order
Sanitary and Plumbing Work
Electromechanical work
Project Construction Work Planning
for Coming Month
Risk/ Threat for Construction Work
Progress
Facing Legal Issue (If any)
WESTIN ANNEX
Gulshan 2, Dhaka
Intelligent Office Building 5 Basement 30 Storied Building Exclusive
Shopping & Office Spaces Located @ VIP Zone including Central Air
Condition.
PRESENT STATUS OF
UPCOMING PROJECT
UNIQUE 51/B
WESTIN 2
Gulshn 2, Gulshan,, Dhaka
Parking cum Commercial Building at Diplomatic Zone with 100% Fire Protection System
30 Storied Building including 600 Car Parking 6 Basements, Tower & Machine Parking
Exclusive Shopping & Office Spaces & 5 Star Service Apartments
UNIQUE SPRINKLE
Plot # 3 & 5, Road # 10/A, Sector # 9, Uttara, Dhaka.
Luxurious Residential Building.
Present Status of This Project
Power of attorney already accepted
by RAJUK.
Fullest architectural drawing has
been complete.
Clearance of RAJUK for the
unification of adjacent two lands
already submitted.
Sub soil investigation/ Soil test has
been completed.
Structural drawing and design work
will start very soon.
This projects full phase construction
work will start very soon.
Borak Real Estate (Pvt.) Ltd .
UNIQUE MINERVA.
Plot # 02, Road # 59, Gulshan -2, Dhaka
for
for
for
for
INTRODUCTION OF PROJECT
50%
50% (480
(480 acres)
acres) will
will be
be used
used for
for
both
construction
of
Apartment
both construction of Apartment
Building
Building and
and Plots.
Plots.
Nos. Flats
Construction
Costing/Unit
57 Nos. Building.
9576 Nos.
22.03 Lakh.
1200 Sft
43 Nos. Building.
7224 Nos.
26.43 Lakh.
1450 Sft
43 Nos. Building.
Building Type
1000 Sft
7224 Nos.
31.94 Lakh.
Selling Process.
Considering 10% as service charge
for selling and for recovery of cost,
50% of the total cost is considered
to be recovered in 4 Years by 16
(Sixteen) installments. After that
next 50% in monthly installments
for a period of 16 Years.
Note: Recovery Period including 20
Years.
3.00 Katha
Nos. of Plots.
5.00 Katha
10.00 Katha
2.08 Lakh/Katha.
Selling Process
Considering 10% as service
charge for selling and for
recovery of cost, 50% of the
total cost is considered to be
recovered in 4 Years by 16
(Sixteen) installments. After that
next 50% in monthly
installments for a period of 16
Years.
Note: Recovery Period including
20 Years.
Total
Total Land/
Land/ Project
Project Area
Area =
= 960
960 acres.
acres.
163705.50 Lac
TK.
197651.61 Lac
TK.
12060.00 Lac
TK.
Selling process.
Governments
Selling Process.
Developers
Selling Process.
Company
Present Selling
Process.
Sub soil investigation, All drawing design testing & environmental clearance, Underground water reservoir including
Centrifugal pump & sub-mircible pump installing, RCC boundary, Septic tank, Sock well, Sewerages line, Lift
installation, 100KVA 429 nos generator, Fire management, Gas line, intercom, CCTV, Telephone line, Plantation,
Training Evaluation & monitoring, Allowance, Inspection vehicle, Office furniture and Instrument, Survey and soil
investigation, Manpower, Project Monitoring, Price escalation and Contingency. Total L/S costing for Above all
works.
4000
4000 Various
Various Sizes
Sizes plot
plot &
& 143
143 Nos.
Nos.
15
15 Storied
Storied Buildings
Buildings ownership
ownership
ratio.
ratio.
4000
4000 Various
Various Sizes
Sizes plot
plot &
& 143
143 Nos.
Nos.
15
15 Storied
Storied Buildings
Buildings ownership
ownership
ratio.
ratio.
42552000000 TK (Proposed
Selling price for 3 Katha)
2295000000 TK (Proposed
selling price for 5 Katha)
4590000000 TK (Proposed
Selling price for 10 Katha)
TOTAL AMOUNT: 49437, 000000 TK.
TOTAL
TOTAL PROJECT
PROJECT IMPLEMENTATION
IMPLEMENTATION CONSTING
CONSTING =
=
437898.35
Lac
TK
+
225698.61=
663596.96
Lac
437898.35 Lac TK + 225698.61= 663596.96 Lac
TAKA.
TAKA.
FROM
FROM THIS
THIS AMOUNT
AMOUNT GOVERNMENTS
GOVERNMENTS INVESTMENT
INVESTMENT
@
40%
=
265438.784
Lac
TK.
@ 40% = 265438.784 Lac TK.
FROM
FROM THIS
THIS AMOUNT
AMOUNT DEVELOPERS
DEVELOPERS
INVESTMENT
@
60%
INVESTMENT @ 60% =
= 398158.176
398158.176 Lac
Lac TK
TK
4000
4000 Various
Various Sizes
Sizes plot
plot &
& 143
143 Nos.
Nos.
15
15 Storied
Storied Buildings
Buildings ownership
ownership
ratio.
ratio.
ORGINAL
ORGINAL PROFIT
PROFIT AFTER
AFTER TOTAL
TOTAL SELLING
SELLING
SELLING
SELLING VALUE=
VALUE= 1269799.20
1269799.20 Lac
Lac TK.
TK.
CONSTRUCTION
CONSTRUCTION AND
AND
DEVELOPMENT
VALUE
@
60%
INVESTMENT
DEVELOPMENT VALUE @ 60% INVESTMENT
FROM
FROM TOTAL
TOTAL PROJECT
PROJECT VALUE
VALUE (663596.96
(663596.96 Lac
Lac
TK)
=398158.176
LacTK
TK) =398158.176 LacTK
Total
Total Approximately
Approximately Profit=
Profit= 871641.03
871641.03
Lac
TK.
Lac TK.
Click To Start
What is Workflow in
SAP ERP Software
Consultant Selection: According to our Module scopes (FICO, SD, MM, RE, PS,
BASIS, ABAP, WORK FLOW, MOBILE INTERFACING), we have been selecting
consultants by interview sessions from around 60-70 consultants. All of them are
experienced on implementing end-to-end projects and 10-12 consultants would
be selected for our implementation.
Recruitment: As per honorable Managing Directors instruction, Key Users
recruitment for different modules of SAP is under progress for smooth operation
of SAP ERP Implementation. An initial interview of around 75 candidates for Key
Users has already been done and final selection is going on. Three (03) IS team
member have already been recruited for support from technical aspect.
Project Implementation Completion: Project completion of SAP implementation
is forecasted to Go-Live within 3 3.5 months from the starting of
implementation. Depending upon the finalization of the Implementer, Key Users
and others; project Kick-Off could be started at the end of November.