Plant capacity and type (35 MW &
CPP)
Plant location : GUMMIDIPOONDI
Plant commissioned on (12.06.2013)
Plant O&M commenced on (MARCH
2013)
10/24/16
PLANT DETAILS
Sl.
No.
1
2
3
DESCRIPTION
NO. OF BOILER AVAILABLE IN EACH
TYPE
EACH BOILER MAKE
EACH BOILER CAPACITY
BLR MS PARAMETERS
5
6
7
TG MS PARAMETERS(If available)
WTP MAKE
10
RO-DM CAPACITY
11
12
10/24/16
DATA
1
GB ENGINEERING
150 TPH
PRE:95 Kg/Sq.cm /
TEMP:525 5 C
COAL
SIEMENS
35 MW
PRE:89 Kg/Sq.cm /
TEMP:520 C
DESCRIPTION
13
CHP MAKE
14
CHP CAPACITY
15
AHP MAKE
16
AHP CAPACITY
17
18
150 TPH
19
20
21
10/24/16
DATA
DG SET CAPACITY
MANKIND IS IN PURSUIT OF TRUTH,
LET US WORK TOWARDS THIS
625 KVA
4
100.0
80.0
60.0
40.0
20.0
0.0
APR'14 MAY'14 JUN'14 JUL'14 AUG'14 SEP'14 OCT'14 NOV'14 DEC'14 JAN'15 FEB'15 MAR'15
10/24/16
100.0
80.0
60.0
40.0
20.0
0.0
APR'14 MAY'14 JUN'14 JUL'14 AUG'14 SEP'14 OCT'14 NOV'14 DEC'14 JAN'15 FEB'15 MAR'15
10/24/16
AUXILIARY CONSUMPTION
(in %)
14
12
10
8
6
4
2
0
-2
-4
10/24/16
FUEL GCV
(bunker coal - as fired basis)
5000
4000
3000
2000
1000
APR'14 MAY'14 JUN'14 JUL'14 AUG'14 SEP'14 OCT'14 NOV'14 DEC'14 JAN'15 FEB'15 MAR'15
-1000
10/24/16
80
60
40
20
APR'14 MAY'14 JUN'14 JUL'14 AUG'14 SEP'14 OCT'14 NOV'14 DEC'14 JAN'15 FEB'15 MAR'15
-20
10/24/16
10
2500
2000
1500
1000
500
APR'14 MAY'14 JUN'14 JUL'14 AUG'14 SEP'14 OCT'14 NOV'14 DEC'14 JAN'15 FEB'15 MAR'15
10/24/16
11
APR'14 MAY'14 JUN'14 JUL'14 AUG'14 SEP'14 OCT'14 NOV'14 DEC'14 JAN'15 FEB'15 MAR'15
10/24/16
12
NO. OF TRIPS/OUTAGES
MONT
H
APR14
(1 Trip)
TRIP DESCRIPTION
DURAT
ION
1. BOILER &
TURBINE GOT TRIP.
1.5 hrs
UAT transformer
synchronising time
tie incomer tripped.
1. BOILER &
TURBINE GOT TRIP.
MAY14
(5
Trips)
JUNE1
10/24/16
4 (6
Trips)
2 hrs
REMEDIAL
ACTION TOOK
2. BOILER &
TURBINE GOT TRIP.
1.30 hrs
3. BOILER &
TURBINE GOT TRIP.
3.35 hrs
RTD CHECKED
4. BOILER &
TURBINE GOT TRIP.
18.30 hrs
CARD REPLACED
5. BOILER &
TURBINE GOT TRIP.
2.45 hrs
UPS-1&2 SYNCHRONISED
UPS-2 CHECKED
01.10 hrs
INFORMED TO EB
1. BOILER &
TURBINE GOT TRIP.
13
OPERATION CHALLENGES
SL.NO
CHALLENGES
WATER WALL
REAR SIDE
TUBE FAILURE & FEEDING HAS
ERROSION
STOPPED,
FAILURE TUBE
REPLACEMENT,
ERRODED
TUBES
BUTTERING
WORK DONE &
AIR FLOW TO
FURNACE HAS
CONTROLLED.
IN KICK OFF
ZONE 1 MTR
LENGTH TUBE
THICKNESS
FOUND LESS.
BED ASH
NEW BELLOW
COOLER NOT IN ORDER WAS
SERVICE.
PLACED.
MANKIND IS IN PURSUIT OF TRUTH,
CONVEYING
SS
LET US WORK TOWARDS THIS
10/24/16
ACTION TOOK
PRESENT
STATUS
14
15
REPORTS SYSTEM
Write various kinds of report you generate such
as daily, weekly, monthly, etc
1) WE ARE GENERATING DAILY, MONTHLY, SHUT
DOWN & ANNUAL REPORTS.
2) IN THIS REPORTS WE ARE MAINTAINING
PLANT PERFORMANCE
(BOILER,TURBINE),PLF,EFFICIENCY,HEAT
RATE(PLANT,TURBINE)PM,VIBRATION READINGS
FOR ALL EQUP, WATER QUALITY REPORTS, CHP
REPORTS, MECHANICAL, ELECTRICAL,
INSTRUMETATION REPORTS.
10/24/16
16
NEW IMPLEMENTATIONS/SYSTEMS
ADAPTED IN THE YEAR
1)
10/24/16
17
OFIOPERATION
ACTION TOOK
AUTO
COMBUSTION
TO BE TAKEN.
LOGIC TO BE
CHECK
START UP
BURNER
LOGICS TO BE
SIMPLIFIED.
EMRV TAKEN IN
TO SERVICE.
WHILE EB
FAILURE PLANT
COMES TO
HOME LOAD
WHILE EB
FAILURE TO
10/24/16
PRESENT
STATUS
18
19
20
SAFETY AT WORK
MONTH
INCIDENTS
REMEDIAL ACTION
TAKEN
NIL
10/24/16
21
10/24/16
MONTH
TOPIC/S
GIVEN BY
NO.OF
PARTICIPA
NTS
JAN15
Work permit
system,
Conveyor
belt safety
T.Saravanan
,
A.Kumar
53
FEB15
Safety
measures
near
rotating
parts,
Cleanliness,
Emergency
planning
T.Saravanan
48
MAR15
CPR, Safety
Belt
T.Saravanan
75
APR15
Fire fighting
training,
73
10/24/16
MONTH
TOPIC/S
GIVEN BY
NO.OF
PARTICIPA
NTS
MAY15
First aid,
Hot, Height
work permit
T.Saravanan
89
JUN15
Fire Fighting
pumps,
Emergency
planningSiren
use,EOT
Crane
operation
T.Saravanan
92
JUL15
Structure
use for first
aid , 5S
T.Saravanan
79
AUG15
Safety
Rules, Fire
T.Saravanan
122
10/24/16
MONTH
TOPIC/S
GIVEN BY
NO.OF
PARTICIPA
NTS
SEP15
Coal yard,
conveyor
safety
T.Saravanan
67
OCT15
Close call,
Case
Studies
T.Saravanan
, A.Kumar
43
NOV15
CHP Safety
Inter Logs,
Personal
Safety
T.Saravanan
65
DEC15
Shutdown
jobs-Unsafe
act
T.Saravanan
, A.Kumar
24
ORG.
CHART
ACTUAL
SHORT
EXCESS
OPERATION
INCHARGE
NILL
NILL
SHIFT
INCHARGE
NILL
NILL
DCS
OPERATOR
BOILER
FIELD
OPERATOR
NILL
TURBINE
FIELD
OPERATOR
NILL
NILL
CHP/AHP
OPERATOR
NILL
NILL
10/24/16
25
26
OFI-TEAM
TRAINING
CLASS TO BE
CONDUCTED.
SEMINAR CLASS
TO BE
CONDUCTED.
INTER
RELATIONSHIP
& DISCUSSION
DEVELOPMENT
WITH OTHER
SITE TECH
PERSON
10/24/16
ACTION TOOK
PRESENT
STATUS
27
OUR REQUIREMENTS
1)
10/24/16
28
QUESTIONS?
10/24/16
29
THANK YOU
10/24/16
30