Vous êtes sur la page 1sur 25

ORLANDO URRIBARRI

1977
1972

MSc Petroleum Engineering,


University of Zulia, Venezuela.
Petroleum Engineer,
University of Zulia, Venezuela.
BACKGROUND

Workover and Drilling Engineer (TEXACO offshore oil fields in Lake of


Maracaibo, Venezuela) 1972-1975.
Production Engineer of Steam Drive Projects (Shell Venezuela and
Shell Holland) 1977-1985.
Production Technologist (PDVSA) 1985-2002.
Worldwide Production Technology Consultant/Instructor (NExT) 2003
present (USA, UK, Nigeria, Vietnam, Indonesia, Malaysia, Oman, Colombia,
Ecuador, Mexico).

E-mail: orlandour@opicaconsultores.com
Copyright 2007,

, All rights reserved

Introduction

Role of Production Engineering in Field Development

Copyright 2007,

, All rights reserved

ASSET
Every resource that add value to the organization.
PHYSICAL ASSETS

FINANCIAL ASSETS

Reservoirs
Wells
Facilities
Hardware
Materials
Naturals

INTELLECTUAL ASSETS

Structural
Capital

Practices
Models
Methodologies

Human
Capital

Talent
Skills
Knowledge
Communities

Copyright 2007,

, All rights reserved

Relational Alliances
Capital
Agreements

Capital
Equity
Stocks
Cash

ASSET MANAGEMENT
Set of procedures that enables management to be accountable for the
administration of the asset lifecycle:

Maximizing shareholder value added


Applying best practices in technology,
operations, trading and finance
Considering environment, health, legal
and relations aspects
Giving total accountability for CAPEX
and OPEX

Copyright 2007,

, All rights reserved

ASSET MANAGEMENT STRATEGY

PHILLIPS

C: Centralized
D: Decentralized
Copyright 2007,

, All rights reserved

TOTAL
FINA
ELF

Responsabilities and
decision making at asset level

MAYOR CONTROL

MXIMA DELEGACIN

MNIMA DELEGACIN

INTELECTUAL ASSET CONTROL

Responsabilities and
decision making at a corporative level

MENOR CONTROL

Exxon-Mobil

C
D
PHYSICAL ASSETS CONTROL

ASSET MANAGEMENT STRATEGY

C: Centralized
D: Decentralized
Copyright 2007,

, All rights reserved

Responsabilities and
decision making at asset level

MAYOR CONTROL

MXIMA DELEGACIN

MNIMA DELEGACIN

INTELECTUAL ASSET CONTROL

Responsabilities and
decision making at a corporative level

PHILLIPS

MENOR CONTROL
TOTAL
FINA
ELF

Exxon-Mobil

C
D
PHYSICAL ASSETS CONTROL

ASSET MANAGEMENT STRATEGY

, All rights reserved

MAYOR CONTROL

MXIMA DELEGACIN

C: Centralized
D: Decentralized
Copyright 2007,

Responsabilities and
decision making at asset level

PHILLIPS

MNIMA DELEGACIN

INTELECTUAL ASSET CONTROL

Responsabilities and
decision making at a corporative level

TOTAL
FINA
ELF

Exxon-Mobil

MENOR CONTROL

C
D
PHYSICAL ASSETS CONTROL

Asset Management
A Team Approach
Reservoir
Engineering
Environmental

Production

and Safety

Engineering

Engineering
Drilling
Land, Legal, and

Asset

Financial

Management

Services

Team

Production
Operations

Geosciences
Petrophysics
Geology
Geophysics
others

Engineering

Design and

Facilities
Operation and
Maintenance
Engineering

Construction
Engineering
Copyright 2007,

, All rights reserved

ASSET LIFE CYCLE


CAPEX
Design and construction of
wells and infrastructure.

OPEX

Subsurface-Surface
Integral Productivity Optimization

PRODUCTION
BPD

LIFE CYCLE

DISCOVERY

Copyright 2007,

, All rights reserved

DEVELOPMENT

EXPLOITATION

ABANDONMENT

Petroleum Engineering Cathegories

Drilling Engineer

Production Engineer

Reservoir Engineer

Copyright 2007,

, All rights reserved

10

Drilling Engineer

Drill a useable wellbore through the objective formation at the


location intended

Often functions like a General Contractor, managing many


sub-contractors to accomplish tasks

Deeper cheaper

Copyright 2007,

, All rights reserved

11

Production Engineer

Responsible for producing the maximum amount of oil and/or


gas from the reservoir in cost effective manner (value
maximization)

Usually focused on individual wells or groups of wells

Often coordinates between other asset team members

Copyright 2007,

, All rights reserved

12

Production Operations
Artificial lift

Gas and fluid separation

Storage

Gas meter Gas


pipeline
Gas
Oil
ptf

Water

VALUE MATERIALIZATION

pwf
pe
p
Copyright 2007,

, All rights reserved

13

ROLE OF PRODUCTION OR PRODUCTIVITY ENGINEER


DURING THE ASSET LIFECYCLE
CAPEX
Design and construction of
wells and infrastructure.

Subsurface-Surface
Integral Productivity Optimization

OPEX

LIFE CYCLE

PRODUCTION
BPD

PRODUCTION ENGINEERING ACTIVITIES


Design & complete wells
e.g. what rates? size of
tubing? single or dual,
perforated or open hole,
vertical or horizontal
DISCOVERY

Copyright 2007,

, All rights reserved

DEVELOPMENT

Monitor wells performance, e.g. pressure build up


analysis, production trends, production impediments
Improve productivity e.g. artificial lift, sand control,
stimulation
Generate recommendations to maintain wells e.g.
Wireline/slickline work, Coiled tubing activities,
workovers
EXPLOITATION

ABANDONMENT

Reservoir Engineer

Optimize depletion plan and economics (Value Creation)

Develops reservoir models to forecast well and reservoir


performance

Performs reserves estimates and audits for financial


accounting

Copyright 2007,

, All rights reserved

15

Technology Integration based on Reservoir

Prediction

Description

Geophysics
Petrophysics

Geology
Reservoir

Drilling

Performance
Optimization

Copyright 2007,

, All rights reserved

Computing
Engineering

Characterization

16

Reservoirs

Subsurface rocks are generally saturated with fluids (usually


water)

Fluids occupy pores, voids and cracks

Forces (gravity, geologic stresses) can cause fluids to move


when a pressure differential exists

Hydrocarbon reservoirs are discrete volumes of rock that


contain fluid compounds of hydrogen, carbon and oxygen.

Copyright 2007,

, All rights reserved

17

ASSET LIFE CYCLE


EXPLORATION PROCESS
PRODUCTION

EXPLORATION
BASIN ANALYSIS

1 - 3 YEARS
PROSPECTION
3 5 YEARS

REGIONAL GEOLOGY
GRAVIMETRY
MAGNETROMETRY
GEOLOGY OF SURFACE

DELINEATION
3 - 5 YEARS

DEVELOPMENT
DETAILED
SEISMIC
PROSPECT
DEFINITION

DRILLING

DEVELOPMENT
PLAN
COMMERCIAL

PRODUCTIVITY

DECISION GATE
Copyright 2007,

, All rights reserved

A Subsurface Reservoir

BLR

FALLA
ICOTEA

PILAR NORTE
LA CUA

C-1

AT
ICO

B-9

C-4
C-5

MT GU
J/C AS
OL AR
ON E

R
PILAR SU

C-1

C-2
C-3
C-4
C-5
MT GUA
J/ C S A
OL RE
G
ON
MT UAS
J/C AR
OL E
ON

C-4
C-5
MT
J/C
GU
OL
AS
ON
AR
E

C-6
C-7
E
GUASAR
LON
MTJ/CO
NT
BASEME

Copyright 2007,

, All rights reserved

19

ASSET
Asset Planning
and Control

DirectiveLevel
Level
Directive
ASSET
ASSET

VALUE IDENTIFICATION
Reservoir Modeling
and Planning

StrategicLevel
Level
Strategic
RESERVOIR
RESERVOIR
VERTICAL INTEGRATION

VALUE CREATION

TacticLevel
Level
Tactic
PRODUCTIVITY
PRODUCTIVITY

INTEGRATED PRODUCTIVITY TEAM


Integrated Productivity
VALUE MAXIMIZATION

2S Operations &
Maintenance

OperationsLevel
Level
Operations
2SFIELD
FIELDOPERATION
OPERATION
2S

GEOLOGY
Copyright 2007,

RES. ENG.

, All rights reserved

VALUE MATERIALIZATION
HORIZONTAL INTEGRATION
SURF. FACIL.
WELL COMP.

AUTOMATION

RELIABILITY
REL

HSE
20

Objectives for this Course


Overview of Field Development Processes with an emphasis on
reservoir and down hole technology, complemented by facilities,
operations and environmental review.

Copyright 2007,

, All rights reserved

21

Production Engineering & Operations


(a 5-days course)

The Reservoir (2 days)

The Well (1 day)

The Operations (2 days)

Copyright 2007,

, All rights reserved

22

The Reservoir

Introduction

Geology and Production

Rock Properties

Fluid Properties

Reservoir Production Processes

Formation Damage

Well Testing

Nodal Analysis

Inflow Performance

Outflow Performance

Copyright 2007,

, All rights reserved

23

The Well

Casing String and Suspension

Tubing Selection

Tubing Connections

Packers

Wellhead & X-mas tree

Completion Equipment

Safety Valves

Running Completions

Copyright 2007,

, All rights reserved

24

The Operations

Perforations

Acidizing Candidate Selection

Artificial Lift

Matrix Treatments

Multilaterals

Slickline

Sand Control

Coiled Tubing

Vent Screen

Production Logging

Screenless

Fracturing

Production Facilities

Copyright 2007,

, All rights reserved

25

Vous aimerez peut-être aussi