Project Post-Mortem
REAPLITE INDUSTRY SDN BHD
Prepared by : Muhammad Faiz B.
Shaf
Content
1
INTRODUCTION EC BROWNSTONE
PROJECT ANALYSIS
MISTAKES OCCURED
CORRECT PRACTICES
IMPROVED PRACTICES
Objective of Post-Mortem
To identify the practices that we did
correctly, so that we can practice the same
manner/technics again in similar situations.
To identify the practices that had been done
differently, so that we can refne our
techniques in the future.
To identify the practices that we did wrong,
and to suggest alternative approaches or
safety measures that we should employ
when we face a similar problem again in
future.
INTRODUCTION EC BROWNSTONE
What is EC
Using DfMA Method
PVC component
Shear wall system
Storey
10 & 12
Unit
Modules
4436
638
Description
INTRODUCTION EC BROWNSTONE
INTRODUCTION EC BROWNSTONE
PROJECT ANALYSIS
Structural Organization
Production Factor
Production Record
Delivery Record
PROJECT ANALYSIS
Structural Organization
PROJECT ANALYSIS
Production Factor
Line 4 (Mahmud); 7
Line 7 (Azhari); 17
Line 6 (Khalid); 16
Line 5 (Samsuri); 26
PROJECT ANALYSIS
Production Factor
0
6
14
8
21
Line 4
16
38
48
23
Line 5
Production
Line 6
Repair
Delivery
Line 7
PROJECT ANALYSIS
Production Record
200
150
100
65
50 51
88
75
72
112
97
88
209
209
195
170
158
165
204
196
153
164
155
138
129
113
111
107
62
48
119
89
60
53
51
18
0 0
174
Line 4
Line 5
22
82
58
19
0
Line 6
Line 7
13
0
PROJECT ANALYSIS
Production Record
Line 5 ; 11
10
Line 7 (Azhari); 10
8
6
4
2
0
Line 4 ; 5
PROJECT ANALYSIS
Delivery Record
206
200
202
176
150
120
110
96
100
50
159
144
131
155
153
152
130
206
176
158
152
156
127
126
113
89
48
42
40
35
32
35
16
0 0
Line 4
Line 5
8391
81
119
95
87
76
42
38
21
0
Line 6
Line 7
MISTAKES OCCURED
SUMMARY ISSUE
SITE ISSUE
NCR ISSUE
QUALITY ISSUE
MISTAKES OCCURED
NCR ISSUE
Chart Title
5
TOTAL
REJECTED
MODULES
58
1
2
3
3
4
4
6
12
18
0
10
12
14
16
18
20
MISTAKES OCCURED
SITE ISSUE
No. of issue
Hook broken; 5
Wall bulging; 15 Line 4 (Mahmud); 27
Line 7 (Azhari); 17
Line 5 (Samsuri); 10
Line 6 (Khalid); 30
TOTAL
PROBLEM
MODULES
114
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
Modules crack
Lifting procedure incorrect
Not proper leveling during storage
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SITE ISSUE
Surface bulging
Mould not close properly
MISTAKES OCCURED
SITE ISSUE
Missing reinforcement
Incorrect mesh used.
MISTAKES OCCURED
SITE ISSUE
MISTAKES OCCURED
SUMMARY ISSUE
Missing
Corrugated
Opening
pipe
Window
Crack
Bulging
Wall
HoneyComb
Bulging
Out
of
Dimension
Poor
Finishing
Major
Chip-Off
MISTAKES OCCURED
NCR ISSUE
Major Honeycomb
Not proper vibrate
Concrete issue
MISTAKES OCCURED
NCR ISSUE
Major Honeycomb
Not proper vibrate
Concrete issue
MISTAKES OCCURED
NCR ISSUE
MISTAKES OCCURED
NCR ISSUE
Cracks
Not proper lifting
Not proper stacking/storage
MISTAKES OCCURED
NCR ISSUE
Concrete Spalling/Chipped-off
Not handling properly
MISTAKES OCCURED
NCR ISSUE
MISTAKES OCCURED
NCR ISSUE
MISTAKES OCCURED
NCR ISSUE
MISTAKES OCCURED
NCR ISSUE
Window Bulging
Not fixed frame stoppers properly
WRONG PRACTICES
NCR ISSUE
NCR Modules
WRONG PRACTICES
QUALITY ISSUE
Moulds Cleaniness
Not clean properly after casting
WRONG PRACTICES
QUALITY ISSUE
WRONG PRACTICES
QUALITY ISSUE
WRONG PRACTICES
QUALITY ISSUE
WRONG PRACTICES
QUALITY ISSUE
WRONG PRACTICES
QUALITY ISSUE
WRONG PRACTICES
QUALITY ISSUE
CORRECT PRACTICES
HOUSE KEEPING
CORRECT PRACTICES
CORRECT PRACTICES
MOULD CLEANESS
CASTING
SEPARATE
INTO FEW
TEAMS
REBAR
SET-UP
Arrange items
to ensure
efficient work
flows
Productivity
FOLLOW
REBAR
SCHEDULE
MESH
CORRECT
SIZE &
LAPPING
USING
DEMOULDING
DEMOULD EARLY
MORNING
FOLLOW CUBE
STRENGTH
Eliminate
waste & time
saving
SYSTEMATIC
Maintains and
review
standards
Objective achievement
To identify the things we did right,
so that we can remember to use
again in similar situations
5S SYSTEM
5S is a habit and
is continually
Sustain
improved
A place for
everything and
everything is in
its place
Standardiz
e
Cleaning and
identification
methods are
consistently
applied
Set in
Order
Shine
The area is
cleaned as the
work is performed
Some 5S Examples
Before 5S
After 5S - Cleaned,
organized and drawers
labeled (less time and
frustration hunting)
5S Examples - Shine
THANK YOU