Learning Objectives
After completing this unit, the user will be able to undertstand
Capital Projects Overview
Capital Projects Flow
Capital projects are used to collect construction-inprocess (CIP) costs for an asset
OASIS Training
Project
costs
Oracle Projects
Assets
OASIS Training
Post invoice
CIP/FA
Oracle GL
Define
Assets
Assign
Assets
Collect
Costs
Specify
In Service
Date
Generate
Asset
Lines
Interface Assets
to Oracle Assets
OASIS Training
Capitalisation Controls
Capital
Capitalisable
Capitalisable
Non-Capitalisable
Non-Capitalisable
OASIS Training
Task Level
Transaction Level
(Expenditure Item)
OASIS Training
You could still change the Capitalizable flag after item is costed
OASIS Training
Grouping of Expenditures
into Asset Lines
OASIS Training
OASIS Training
Grouping Levels
Project Level Grouping
Project
Servers = 20,000
Top Task 1
Task 1.1
Top Task 2
Task 1.2
Task 2.1
Task 2.2
Servers = 10,000
Task 2.2.1
Grouping Level
Servers = 10,000
OASIS Training
Task 2.2.2
Grouping Levels
Top Task Level Grouping
Project
Servers = 10,000
Top Task 1
Task 1.1
Top Task 2
Task 1.2
Task 2.1
Servers = 10,000
Task 2.2
Servers = 10,000
Task 2.2.1
Grouping Level
Servers = 10,000
OASIS Training
Task 2.2.2
Grouping Levels
Lowest Task Level Grouping
Project
Top Task 1
Task 1.1
Top Task 2
Task 1.2
Task 2.1
Task 2.2
Servers = 10,000
Task 2.2.1
Grouping Level
Servers = 10,000
OASIS Training
Task 2.2.2
Grouping Levels
Multiple Levels Grouping
Project
Servers = 10,000
Top Task 2
Top Task 1
Task 1.1
Task 1.2
Task 2.1
Task 2.2
Servers = 10,000
Task 2.2.1
Grouping Level
Servers = 10,000
OASIS Training
Task 2.2.2
Capital project types can use only one CIP grouping method
per project type
Capital - Type
Summarises expenditure items by *expenditure type
Grouping Methods
Expenditure Category
Items in the same Expenditure Category capitalise to the same Asset Category
Item
Expenditure
Type
Expenditure
Category
Asset Category
Major.Minor
12 Doors
Doors and
Windows
Construction
Facilities.Buildings
5 Windows
Doors and
Windows
Construction
Facilities.Buildings
Slab
Concrete
Construction
Facilities.Buildings
Electrical
Wiring
Electrical
Mechanical &
Electrical
Facilities.Building
Improvements
Air Unit
HVAC
Mechanical &
Electrical
Facilities.Building
Improvements
OASIS Training
Grouping Methods
Expenditure Types
Expenditure
Type
Expenditure
Category
Asset Category
Major.Minor
Optiplex 366
Desktop
PC Equipment
Computer Equipment.
Desktops
Latitude 266
Notebook
PC Equipment
Computer Equipment.
Notebooks
Routers
Network
Routers
Machinery &
Equipment
PBX
Telecom
PBX
Machinery &
Equipment
OASIS Training
Learning Objectives
After completing this unit, the user will be able to understand
Capital Projects Overivew
Capital Projects Flow
Define
Assets
Assign
Assets
Collect
Costs
Specify
In Service
Date
Generate
Asset
Lines
Interface Assets
to Oracle Assets
OASIS Training
Defining Assets
OASIS Training
Defining Assets
Defining Assets
1. Highlight
Assets option
2. Click on details
button
OASIS Training
Select
Asset
Category
from
LOV
Defining Assets
Enter Asset Name
Text Description
Select Location
Leave blank
It will be assigned by user
when loaded into FA
Enter
estimated
In Service
date
Define
Assets
Assign
Assets
Collect
Costs
Specify
In Service
Date
Generate
Asset
Lines
Interface Assets
to Oracle Assets
OASIS Training
Asset Assignments
Asset Assignment
Controls expenditure items that will be summarised when
asset lines are generated
Project-Level Asset
Capitalisable expenditure items summarised for project by
grouping method (expenditure category or expenditure type)
Task-Level Asset
Capitalisable expenditure items summarised just for that task
by grouping method ( expenditure category or expenditure
type)
OASIS Training
Task-Level Assignments
2. Click Detail
OASIS Training
Task-Level Assignments
1. Select Task
2. Click Options
OASIS Training
Asset Assignments
Specify the
grouping
level
Assign
Assets
here
OASIS Training
OASIS Training
Learning Objectives
After completing this unit, the user will be able to understand
Capital Projects Overivew
Capital Projects Flow
Can narrow projects you see using fields in the find window
for a particular project manager or project accountant
for a particular organisation
for a particular classification category and code
OASIS Training
Search for
a single
project by
number or
name...
or by organisation
Define
Assets
Assign
Assets
Collect
Costs
Specify
In Service
Date
Generate
Asset
Lines
Interface Assets
to Oracle Assets
OASIS Training
Once project assets have been interfaced, Oracle Asset will add
additional information and then the assets are imported into
Oracle Assets using the Mass Additions process
OASIS Training
Define
Assets
Assign
Assets
Collect
Costs
Specify
In Service
Date
Generate
Asset
Lines
Interface Assets
to Oracle Assets
OASIS Training
After assets are placed in service, the user can create, prepare
and send asset lines to Oracle Assets to become fixed assets
OASIS Training
Select
the
project
you want
to
generate
Enter the PA
Through Date
Click OK
OASIS Training
OASIS Training
Defined Asset
Asset Cost
OASIS Training
Define
Assets
Assign
Assets
Collect
Costs
Specify
In Service
Date
Generate
Asset
Lines
Interface Assets
to Oracle Assets
OASIS Training
OASIS Training
OASIS Training
OASIS Training
Additional Information
Click Asset Line Details
OASIS Training
OASIS Training
Define
Assets
Assign
Assets
Collect
Costs
Specify
In Service
Date
Generate
Asset
Lines
Interface Assets
to Oracle Assets
OASIS Training
OASIS Training
Interface Asset
process
OASIS Training
Interfaced Asset
OASIS Training
OASIS Training
OASIS Training
OASIS Training
Learning Objectives
After completing this unit, the user will be able to understand
Capital Projects Overivew
Capital Projects Flow
OASIS Training
After asset lines are created, the following adjustments are made in the
Asset Lines window
Mandatory
Assign an asset to all unassigned asset lines
Unassigned asset lines will only occur if there are multiple
assets assigned to a grouping level
Change the UNASSIGNED asset name to a valid asset
name
Optional
Split an asset line into multiple lines and assign the line to
different assets
Change the asset assigned to a line
Change the line description
OASIS Training
OASIS Training
Task 1
Charges:
Desktop $1000
Notebook $2000
Asset 1
Task 2
Charges:
Desktop
OASIS Training
$1000
Asset
Description
(Expenditure Category)
Amount
PC Equipment
$4000
Asset
Description
(Expenditure Type)
Amount
Desktop
$2000
Notebook
$2000
OASIS Training
Asset 2
Task 1
Charges:
Desktop $1000
Notebook $2000
Task 2
Charges:
Desktop
OASIS Training
$1000
Asset
Description
(Expenditure Category)
Amount
PC Equipment
$3000
PC Equipment
$1000
Asset
Description
(Expenditure Type)
Amount
Desktop
$1000
Notebook
$2000
Desktop
$1000
OASIS Training
Task 1
Task 2
Charges:
Desktop $1000
Notebook $2000
OASIS Training
Charges:
Desktop
$1000
Asset
Description
(Expenditure Category)
Amount
Unassigned
PC Equipment
$3000
Asset
Description
(Expenditure Type)
Amount
Unassigned
Desktop
$1000
Unassigned
Notebook
$2000
OASIS Training
OASIS Training
OASIS Training
OASIS Training
Asset assigned
OASIS Training
OASIS Training
OASIS Training
OASIS Training
Learning Objectives
After completing this unit, the user will be able to understand
Capital Projects Overivew
Capital Projects Flow
OASIS Training
Post-capitalisation Adjustments
OASIS Training
Reversing Capitalisation
If an asset was placed in service in error and the asset was interfaced
to Oracle Assets
Capitalisation can be reversed in Oracle Projects
Reversing lines will be sent to Oracle Assets
To reverse capitalisation
Ensure the Amortise Adjustment check box is unchecked for the
asset
From the Capital Projects - Assets window:
Click on the Reverse button and save
A check will appear in the reverse check box
To un-reverse, click on the Reverse button again
The check will be removed from the reverse check box
Reversing lines cannot be sent to Oracle Assets until the original
mass addition line is posted in Oracle Assets
OASIS Training
Reversing Capitalisation
1. Click here to reverse
OASIS Training
Reversing Capitalisation
OASIS Training
Reversing Capitalisation
Reverse line
OASIS Training
Reversing Capitalisation
Reversed back to CIP
OASIS Training
Reversing Capitalisation
Note that the Actual
Date In Service has
been removed
Cost = ZERO
OASIS Training
Reversing Capitalisation
in Oracle Assets
Adjustment line in FA
OASIS Training
Re-capitalising a Reverse
Capitalised Asset
OASIS Training
OASIS Training
Reverse an Asset
OASIS Training
Summary
OASIS Training
OASIS Training