Académique Documents
Professionnel Documents
Culture Documents
WELDING SHOP
PROJECT TITLE
DEFECT REDUCTION
IN
ROBO WELDING
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
INTRODUCTION
TEAM NAME:
LEADER NAME:
Team A
Mr. V.B Tripathi (Sr. Manager Production)
SUB LEADER:
COORDINATOR:
PROJECT TITLE:
AREA:
DATE:
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
TEAM STRUCTURE
V.B TRIPATHI
(TEAM LEADER)
GAURAV GOAL
(SUB LEADER)
SUMEET SAINI
(COORDINATOR)
TEAM A
TEJVIR
15/11/16
SUMIT
ANIL B.
MAHENDRA
TEAM B
AKHIL
BOBY
RAGHVENDRA
ANURAG
TANMAY
ARIF KHAN
MAHESH YADAV
SUNIL DUTT
MAHENDRA
PARDESHI
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
PROBLEM DESCRIPTION
1. What is the Problem?
Defects in welded parts cause low production and affect quality.
2. Where is the problem?
Welding Shop
3. How much is the problem?
100% parts are defected.
4. Boundaries of the Problem?
Welding area and Welding rework area.
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
SIPOC
(SUPPLIER, INPUT, PROCESS,
OUTPUT & CUSTOMER)
Specific Process flow chart with SIPOC.
5. Suppliers
GRINDING
SECTION,
STORE
15/11/16
4. Inputs
1. Process
2. Outputs
3. Customers
WELDING
WELDED
PARTS
PLATING SHOP
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
DATA COLLECTION
Data has collected from 5 different lots ( 20 pieces from each lot).
Sample size: 100 Welded assemblies of pin and tab.
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
PARETO ANALYSIS
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
IMPROVEMENT
This is very difficult to solve this problem by changing the process
parameters.
Spatfree-113 gel is use to get rid of this problem.
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
1
0
IMPROVEMENT
Before
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
After
1
1
CONTROL
Work Instructions are modified to
standardize the process.
15/11/16
G R I P W E L F AS T E N E R S P R I VATE L I M I T E D
1
2
CONCLUSION
Pareto chart state that spatters are the major defect.
This is observed that the root cause of defect is high current and
voltage but low voltage and current can cause low penetration defect.
This is also observed that its not possible to apply gel on small parts.
100% defect (Spatter) has been removed by this technique.