IPMS CHAINS
SAFETY
ENGINEERING
Note: Includes Process Safety, Fire Protection & Mechanical Integrity
Safety Engineering/
15 APR 2001
Safety Engineering/
15 APR 2001
DD-STP
CPM
CHAIN
100%
DD-CMP
General
Activity
DD-CMP
DD-STP
0%
IPMS
CHAIN
MILESTONES:
DD-STP
DD-CMP
100%
General
Activity
GENERAL ACTIVITIES:
Prepare Process Safety Scope of Work
Review & Input PFDs
Review & Input P&IDs
Review Facility Plot Plan
Review Major Equipment Specifications
Review Electrical Area Classification Drawings
Review Hazardous Area Drawings
Participate in P&ID Review Meetings
Safety Engineering/
15 APR 2001
DD-CSU
DD-SCP
20%
DD-SSU
DD-CSU
20%
Set up
Review
Duration 10d
MILESTONES:
DD-SSU
DD-CSU
DD-SCP
DD-CCP
DD-SWP
DD-CWP
DD-STP
DD-CTP
DD-SCP
DD-CWP
DD-CTP
20%
40%
Conduct
Review
Duration 10d
40%
Write/Distribute
Report
DD-CCP
DD-SWP
40%
Track Action
Items & Report
Status
DD-CWP
60%
Write/Distribute
Report
Duration 10d
Work Package Sub Types: SE2
DD-STP
20%
Conduct
Review
10%
IPMS
CHAIN
DD-SWP
20%
Set up
Review
CPM
CHAIN
DD-CCP
Safety Engineering/
DD-STP
DD-CTP
60%
100%
Track Action
Items & Report
Status
Duration 60d
This chain applies to:
Process Hazard Review
Design Hazard Review
Safety Integrity Level Determinations
15 APR 2001
100%
DD-STT
CPM
CHAIN
DD-ICM
DD-STT
DD-PRC
10%
IPMS
CHAIN
75%
DD-IST
75%
Prepare
100%
Duration_15d_
MILESTONES:
DD-STT
DD-PRC
DD-IST
DD-ICM
DD-ICM
Duration_5d__
Work Package Sub Types: SE2, SE3
Document Sub Types: SE22, SE23, SE30
Safety Engineering/
15 APR 2001
15 APR 2001
DD-CID
DD-SIC
80%
CPM
CHAIN
DD-TDC
DD-FDC
45%
5%
IPMS
CHAIN
Issue For
Construction
DD-STT
45%
Develop
IDC
Duration__20_
This chain applies to the following:
Electrical Area Classification Dwgs.
Fire Protection Equip. Location Plans
Safety Equip. Location Plans
Fire Detector Layout Dwgs.
Fire Detection Cause & Effect Matrix
Gas Detector Layout Dwgs.
Gas Detection Cause & Effect Matrix
Fire Hazardous Area Dwgs.
Escape Route Dwgs.
P&IDs IPL, IFD, IFC
MILESTONES
DD-STT
DD-TDC
DD-FDC
DD-CIA
DD-FCA
DD-CID
DD-SIC
DD-CIC
DD-CIC
20%
DD-CIA
60%
DD-FCA
DD-CID
60%
80%
Prepare
Client
Approval
Prep Issue
For Design
ICA
IFD
Duration__7_
Safety Engineering/
DD-CIC
80%
100%
Issue For
Construction
IFC
Duration_7__
Start Document
To Discipline Check
From Discipline Check
Issue For Client Approval
From Client Approval
Issue for Design
Start IFC Issue
Issue for Construction
DD-SIC
Duration_30_
15 APR 2001
100%
DD-STT
CPM
CHAIN
DD-ICM
DD-STT
DD-PRC
10%
IPMS
CHAIN
75%
DD-IST
DD-ICM
75%
Prepare
100%
Duration_15d_
Duration_5d__
Work Package Sub Types: SE8, SE9
Document Sub Types: SE81, SE82, SE83, SE84, SE85
SE86, SE87
Safety Engineering/
MILESTONES:
DD-STT
DD-PRC
DD-IST
DD-ICM
15 APR 2001
Chain P-TPK:
Procurement (Acquisition) Chain
Tags and Equipment
CPM
CHAIN
AW-INT
DD-STT
DD-RFQ
DD-RFQ
Issue
Eng.
Scope
FQ-ISS
FQ-ISS
Issue
Inquiry
10%
FQ-REC
Evaluate Bids /
Make
Recommendation
0%
30%
FQ-REC
AW-ISS
AWINT
Issue
Interim
Award
(NOC)
15%
0%
Transport
& Deliver
PP-REL
PP-DES
Assemble
& Issue
ERW
5d
(5-20d)
DD-RFQ
10%
RF-ISS
10%
Prep &
Issue
RFQW
2d
RF-ISS
10%
FQ-ISS
10%
Prep &
Issue
RFQ
2d
FQ-BID
FQ-ISS
10%
10%
FQ-BID
FQ-TEC
10%
40%
Supplier
Prep
Bids
20d
Technical
Evaluation
10d
(10-20d)
PP-PHY
Issue
Formal
Award
Fab &
Ship
DD-STT
0%
DD-RFQ
10%
AW-ISS
FQ-TEC
FQ-REC
AW40%
40%
INT
FQ-REC
AW-INT
DD-REQ
40%
40%
40%
55%
Issue
Issue
Eval Bids
Interim
ERW for
& Issue
Award
Purchase
Recomend
(NOC) 2d
10d
2d
(10-15d)
PP-DES
MM-RAS
DD-REQ
55%
RQ-ISS
55%
Issue
REQ for
Purch
7d
PP-REL
100%
PP-DES
100%
RQ-ISS
55%
AW-ISS
55%
Issue
Forma
l
Award7d
PP-DES
100%
MM-RAS
100%
MILESTONES:
DD-STT
Start Document
RQ-ISS
Req Issued to Purchase
DD-RFQ
Issue ERW, RFS, or MTO
AW-ISS
Award Issue External
RF-ISS
Issue RFQW
DD-ISC
Supplier Prep Initial Data
Transport
Fab &
FQ-ISS
RFQ (Inquiry) Issued
PP-PHY
Receive Initial Supplier Data
& Deliver
Ship
FQ-BID
Bids Return
DD-FSC
Supplier Prep Final Data
60d
10d
FQ-TEC
Engineering Tech Review Complete
PP-CRT
Receive Final Supplier Data
AW-INT
Issue Interim Award
PP-REL
Fab & Ship
FQ-REC
Recommend Issue
PP-DES
Materials Shipped
Work Package Sub Types: SE8
DD-REQ
Update Reqmts for Purchase
MM-RAS
Receipt At Jobsite
Document Sub Types: SE88
NOTES:
1. Percentages shown are for Engineering Progress Only.
2. Dotted boxes represent non-Engineering responsibilities only.
3. International projects may require Consolidation yard milestone.
4. Activity content & durations must be reviewed and modified to fit each projects requirements.
Safety Engineering/
PP-CRT
DD-ISC
55%
PP-PHY
75%
AW-ISS
55%
DD-ISC
55%
Supplier
Prep/
Submit
Initial Data
Review
Initial
Supplier
Data
10d
(10-60d) 30d
PP-PHY
75%
DD-FSC
75%
Supplier
Prep/
Submit
Final Data
(10-30d)
IPMS
CHAIN
20d
Review
Final
Supplier
Data 10d
15 APR 2001
DD-FSC
75%
PP-CRT
100%
100%
DD-CMP
Prepare
Document
CPM CHAIN
DD-CMP
DD-STP
0%
Prepare
Document
IPMS CHAIN
MILESTONES:
DD-STP
DD-CMP
100%
Safety Engineering/
15 APR 2001
15 APR 2001
DD-STP
100%
DD-CMP
Prepare
Document
CPM CHAIN
DD-CMP
DD-STP
0%
Prepare
Document
IPMS CHAIN
MILESTONES:
DD-STP
DD-CMP
100%
Safety Engineering/
15 APR 2001
100%
DD-STT
CPM
CHAIN
DD-ICM
DD-STT
DD-PRC
10%
IPMS
CHAIN
75%
DD-IST
75%
Prepare
100%
Duration_15d_
MILESTONES:
DD-STT
DD-PRC
DD-IST
DD-ICM
DD-ICM
Duration_5d__
Work Package Sub Types: SE4
Document Sub Types: SE46
Safety Engineering/
15 APR 2001