GLASGOW CALEDONIAN UNIVERSITY

Current Energy Performance of Buildings

High Level Options Appraisal


Results

Do Nothing
NPV ANALYSIS

DISCOUNT RATE

YEAR
DISCOUNT FACTOR

3.5%

2011

2012
1.00

2013
0.97

2014
0.93

2015
0.90

2016
0.87

2017
0.84

2018
0.81

2019
0.79

2020
0.76

2021
0.73

2022
0.71

2023
0.68

2024
0.66

2025
0.64

INITIAL INVESTMENT ()
Capital Cost of Items
Grants/Funding
Other external contributions

370,000 70,000

100,000

210,000

150,000

50,000

100,000

25,000

50,000

OPERATING COSTS ()

Gas costs

328,141 377,871

401,433

412,081

426,302

443,811

465,520

491,515

496,457

501,586

505,352

509,325

513,050

Other fuel costs (CCL)


Electricity costs for pumping

19,517

22,408

23,648

24,055

24,537

25,027

25,528

26,038

26,559

27,090

27,632

28,185

28,748

CRC costs
CHP maintenance costs

86,798

104,647

110,074

113,484

115,558

111,965

111,965

108,373

144,073

164,693

188,007

218,992

247,807

Boiler maintenance costs


Heat network maintenance
costs
Other maintenance costs

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

REVENUE ()

CHP Proposal
NPV ANALYSIS

DISCOUNT RATE

YEAR
DISCOUNT FACTOR

3.5%

2011

2012
1.00

2013
0.97

2014
0.93

2015
0.90

2016
0.87

2017
0.84

2018
0.81

2019
0.79

2020
0.76

2021
0.73

2022
0.71

2023
2024
0.68
0.66

2025
0.64

INITIAL INVESTMENT ()
Capital Cost of Items
Grants/Funding
Other external contributions

1,263,050 1,923,450 100,000

210,000

150,000

50,000

100,000

25,000 50,000

OPERATING COSTS ()

Gas costs
Other fuel costs (CCL)

680,357

740,851

774,135

796,253

823,732

857,565

899,512

949,741

959,291

969,201

976,480 984,155 991,353

Electricity costs for pumping

60,641

62,730

64,817

66,803

68,885

71,691

73,845

75,889

78,252

80,889

84,236

CRC costs

74,652

91,799

97,470

100,880

105,368

103,911

103,911

102,454

138,872

165,517

193,254 227,760 257,728

CHP maintenance costs

73,412

73,412

73,412

73,412

73,412

73,412

73,412

73,412

73,412

73,412

73,412

73,412 73,412

Boiler maintenance costs


Heat network maintenance
costs
Other maintenance costs

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000

30,000 30,000

5,000

5,000

5,000

5,000

5,000

5,000

5,000

5,000

5,000

5,000

5,000

5,000

5,000

REVENUE ()
Income (avoided cost) from

87,767 100,261

1,007,59 ##### #####

Selection of CHP
Yearly Demand Gas 14,753,581 KWh/Annum
Taken from Carbon Trust Reports/SKM Analysis
Maximum Peak Hourly Demand 04/02/10 6,681 KW
Minimum Hourly Demand Zero during August at
Night
Average hourly demand over year 500KW th
Maximum Operational Hours per year 8760 Hours
CHP Sizing Heat only 900 KW This represents
approximately 60 % of the required annual Heat
load with a load capability of 500 KW during
summer or low load conditions. A 30 % margin
has been included for future on site loads.
Yearly Demand Electrical 11,130,434 KWH

Design Programme