Do Nothing
NPV ANALYSIS
DISCOUNT RATE
YEAR
DISCOUNT FACTOR
3.5%
2011
2012
1.00
2013
0.97
2014
0.93
2015
0.90
2016
0.87
2017
0.84
2018
0.81
2019
0.79
2020
0.76
2021
0.73
2022
0.71
2023
0.68
2024
0.66
2025
0.64
INITIAL INVESTMENT ()
Capital Cost of Items
Grants/Funding
Other external contributions
370,000 70,000
100,000
210,000
150,000
50,000
100,000
25,000
50,000
OPERATING COSTS ()
Gas costs
328,141 377,871
401,433
412,081
426,302
443,811
465,520
491,515
496,457
501,586
505,352
509,325
513,050
19,517
22,408
23,648
24,055
24,537
25,027
25,528
26,038
26,559
27,090
27,632
28,185
28,748
CRC costs
CHP maintenance costs
86,798
104,647
110,074
113,484
115,558
111,965
111,965
108,373
144,073
164,693
188,007
218,992
247,807
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
REVENUE ()
CHP Proposal
NPV ANALYSIS
DISCOUNT RATE
YEAR
DISCOUNT FACTOR
3.5%
2011
2012
1.00
2013
0.97
2014
0.93
2015
0.90
2016
0.87
2017
0.84
2018
0.81
2019
0.79
2020
0.76
2021
0.73
2022
0.71
2023
2024
0.68
0.66
2025
0.64
INITIAL INVESTMENT ()
Capital Cost of Items
Grants/Funding
Other external contributions
210,000
150,000
50,000
100,000
25,000 50,000
OPERATING COSTS ()
Gas costs
Other fuel costs (CCL)
680,357
740,851
774,135
796,253
823,732
857,565
899,512
949,741
959,291
969,201
60,641
62,730
64,817
66,803
68,885
71,691
73,845
75,889
78,252
80,889
84,236
CRC costs
74,652
91,799
97,470
100,880
105,368
103,911
103,911
102,454
138,872
165,517
73,412
73,412
73,412
73,412
73,412
73,412
73,412
73,412
73,412
73,412
73,412
73,412 73,412
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000 30,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
REVENUE ()
Income (avoided cost) from
87,767 100,261
Selection of CHP
Yearly Demand Gas 14,753,581 KWh/Annum
Taken from Carbon Trust Reports/SKM Analysis
Maximum Peak Hourly Demand 04/02/10 6,681 KW
Minimum Hourly Demand Zero during August at
Night
Average hourly demand over year 500KW th
Maximum Operational Hours per year 8760 Hours
CHP Sizing Heat only 900 KW This represents
approximately 60 % of the required annual Heat
load with a load capability of 500 KW during
summer or low load conditions. A 30 % margin
has been included for future on site loads.
Yearly Demand Electrical 11,130,434 KWH
Design Programme