Guidelines and Known Limitations
Before dispatching Antenna and Diplexer - Refer Specification on the attached excel sheet.
Refer attached excel sheet for planned/required Antenna Height Changes
While swapping 2port Antenna with 4 Port Antenna ensure only narrow band antenna is removed.
Scenarios can be changed after consulting planning team if not feasible to implement the proposed solution
due to space constraints on tower.
Combining 3 technologies on single antenna port is not done to mitigate optimization risks/challenges
Where ever possible 2G High-Gain antenna is not swapped or removed.
Existing Scenario of Sites Scenario 1: 2G+3G (3923 cells) Planned Scenario of Sites
A B C
Diplexer
A E/// 2G
(# 0 cells)
2G+3G
Diplexer
B
Nokia 2G
(#cells114)
Existing Scenario of Sites Scenario 3(651 cells) Planned Scenario of Sites
A SRAN/CRFS
(415)
(SRAN)
2G+FD
B Non
SRAN/CRFS
or
E/// 2G(236)
Existing Scenario of Sites Scenario 4 (339cells) CRFS Planned Scenario of Sites
CRFS
(CRFS)
2G+FD
TD+FD
TD+3G
Diplexer Diplexer
339cells
74 cells
TD+FD
TD+FD
TD+3G
Diplexer Diplexer
Diplexer
Existing Scenario of Sites Scenario 6: 2G+3G (281 cells) Planned Scenario of Sites
319 cells
E/// 2G
B 466 cells
3G
Existing Scenario of Sites Scenario 7: 2G+3G (5 cells) Planned Scenario of Sites
5 cells
Existing Scenario of Sites Scenario 8: 2G+3G+FD+TD (238+291cells) Planned Scenario of Sites
A B
(CRFS)
2G+FD
253 cells 291 Cells
Existing Scenario of Sites Scenario 9: 2G+3G+FD+TD (308 cells) Planned Scenario of Sites
TD+3G
Diplexer
Existing Scenario of Sites Scenario 10: 2G+3G+FD+TD (360 cells) Planned Scenario of Sites
(CRFS)
FD+2G
Existing Scenario of Sites Scenario 11: 2G+3G+FD(907 cells) Planned Scenario of Sites
907 cells
2G
Existing Scenario of Sites Scenario 12: 2G+3G+FD(90 cells) Planned Scenario of Sites
A B
2G
(CRFS)
2G+FD
2G
36 cells 54 cells
Existing Scenario of Sites Scenario 13: 2G+3G+FD+TD(cells)
A B C Planned Scenario of Sites
D
FD
3G
2G
(CRFS)
2G 3G
2G+FD
2G 3G
TD TD FD
!0 Cases 6 Port
Antenna to be
Brought Down
271 cells
793 cells 317 cells 95 cells
Existing Scenario of Sites Scenario 14: 2G+3G+FD+TD (17 cells) Planned Scenario of Sites
A
B
(CRFS)
2G+FD
14 cells 3 cells
Existing Scenario of Sites Scenario 15: 2G+3G+FD+TD (2 cells) Planned Scenario of Sites
2 cells
Existing Scenario of Sites Scenario 16: 2G+3G (281 cells) Planned Scenario of Sites
36 cells
E/// 2G
Existing Scenario of Sites Scenario 17: 2G+3G+FD(1371 cells) Planned Scenario of Sites
A C
B
(SRAN)
FDD
FD+2G
FDD
6 cells
FD 2G
Existing Scenario of Sites Scenario 19: 2G+3G+FD+TD (484 cells) Planned Scenario of Sites
484 cells
(SRAN)
2G+FD
TD+3G
Diplexer
Existing Scenario of Sites Scenario 20 (135 cells) Without CRFS Planned Scenario of Sites
135 cells
TD+FD
TD+3G
Diplexer
Diplexer