Académique Documents
Professionnel Documents
Culture Documents
Agenda
1. Carrier BMS
2. BEC & Design for Energy Audit
3. BMS Health Check Service
4. Energy Management Energy Report
5. Carrier BMS Demo
Carrier BMS
Introduction
HVAC System
Fire Services System
Plumbing & Drainage System
Electrical System
Lighting System
UTC OVERVIEW
ISO 9001
UL
CE
BACNet Testing
Laboratory (BTL)
AHR Expo
Innovation Award
Network Structure
Multi-System Integration
Product Strengths
5. Software license no need to renew and full set of engineering tools and
software for initiation, engineering, configuration and programming
Multiple zones in a
single view
Dynamic color indicators
represent comfort
Available temperature
values and zone names
Animated symbols
Alarm Management
Graphical
Hierarchical
Group flexibility
3 types
Normal, holiday and override
Schedules are viewed by clicking on
the tree
Effective and priority schedules are
color coded
View current week or rewind/fast
forward
Flexibility Trend Function
Automatic, no special
setup required
View operation and
troubleshoot your
system
Equipment has
comprehensive enabled
trends
Additional points can be
enabled with a simple
click
Modifiable sample
intervals or select
change of state
Create Comparison
Trends
Build-in Energy Report Function
Energy
+ + =
27
4. COOLING WATER PUMP VFD CONTRO
L
Features
How much
1. VFD Technology flow rate could
Variable flow of cooling water is necessary be reduced?
for typical over-sized chiller plant system, which
will save energy for chiller plant system.
We could
tell you!
2. Adaptive Control Optimal cooling
This technology uses adaptive control Cooling water flow
water control
strategy and unique fine tuning to accurately pump
adjust the cooling water flow to an optimum Chille Cooling Tower
condition, ensuring the reduction of power r
consumption of cooling pump while
guaranteeing proper working conditions for
chillers.
5. CHILLED WATER TEMP. RESET
Options
Full operation
on
21 September
2012
Building Energy Efficiency
Ordinance
Please note that Chapter 610 Buildings Energy Efficiency Ordinance (BEEO)
was enacted in September 2012.
Pumps
24%
Chillers
70%
Problem 2
Measurements on:
water flow
temperature
Power rating
others.
BMS Health Check Service
Chiller Plant Health Check - Instrument
Flow meter
Temperature sensor
Accuracy +/- 1%
Accuracy +/- 0.03^C
Pressure sensor
Accuracy +/- 1%
Data Logger
Real time data collection
Prognostic
Monitoring
Calculate cooling
capacity, chiller COP &
system COP;
Calculate energy
consumption of chiller,
chiller plant system,
AHU, Air-conditioning
system in last hour, this
hour, yesterday, today,
last month, this month,
last year & this year.
Calculate energy
efficiency of chiller
plant system and Air-
conditioning system in
last hour, this hour,
yesterday, today, last
month, this month, last
year & this year.
Data AnalysisPrognostic
Report
Monitoring Daily system performance trends
(example)
Data Analysis
BMS Health Check Service
Chiller C.O.P.
Target
BMS Health Check Service
System Optimization
BMS Health Check Service
Report + Proposal
Full operation
on
21 September
2012
Metering
Type
Water metering with sub-metering
Process water
Gray water
Cooling tower make-up
97
96
95
94
93
92
91
90
89
88
87
86
85
98 163
156
149
135
128
121
142
Mobile Phone
Monitoring
Energy STAR Portfolio Manager
Automatic profiling for buildings
Meter reconciliation
Actual costs & meter readings by utility Cos
Exploring PDAs that use Adobe Flash
Report
Sample Compare current operating conditions
with past performance
Implement Building Tune-ups
- Check equipment functional
operation
- Check operating
setpoints/schedules
- Refine control logic programming
Implement new energy savings control
strategies
Energy Report
Report
ThereSample
are different charts can be chosen in
the report. (Bar Chart)
Report
Sample
Different kinds of EUI can be select in the report. (e.g.
kWh/area. kWh/person, kWh/occ hour..etc)
Report
Sample
Report
Sample
Carrier BMS Demo
Line Demo
Case Study
Hong Kong
Centralized Server Retrofit Project of Carrier Building
Renowned
Management System (BMS) for a renowned university campus
in Hong Kong
University
This is one of the most most prestigious university in Hong Kong. Its main campus consists of
thirty five buildings including academic building, lecture theatre, amenities centre, student hall and
laboratory.
Location:
Hong Kong
Campus
Carrier was selected to be the BMS sub-contractor for a four buildings retrofit project, including
two academic and laboratory buildings, one amenities centre and one composite buildings, all
share the same server at the estate office over the intranet of the university.
Project Type:
University Campus with Multi-buildings
including theatres and laboratories
Building Age:
17~20 years
Building Type:
Physics & Chemistry Twin Concrete & block
Installation Engineer:
Carrier Hong Kong Limited
Case Study
Energy Saving in Lecture Theatre (Access Card System
Integration)
The Carrier BMS system has integrated with the theatre access card system in the four lecture
theatres of the buildings. This allows the system to pre-cool the lecture theatre before lecture time
and adjust temperature setpoint according to actual access situation.
Users can also adjust the pre-cool time according to different seasons and override the access card
system signal to turn on air handling unit manually. Graphic Interface for Lecture Theatre Air
Handling Unit
Web-Service and Location Privilege
Carrier web-base server can provide remote monitoring and control over the internet. The university
estate office has provided a fix IP address for the BMS server so that user can access the system
anywhere with internet connection.
Since the server is shared by four buildings and each is with different maintenance team. Carrier Carrier Control System
BMS system is able to just illustrate particular building to the corresponding team while the
management can have a whole picture of the campus.
Welcome