Académique Documents
Professionnel Documents
Culture Documents
parameters
Prepared By:
RAJESH KUMAR
Focus areas
LTE High Capacity Focus Areas
1. Control Channel Dimensioning
PUCCH Resources
PDCCH Resources
2. UL Noise Rise
3. PRB Utilization / Cell Throughput Capacity
4. MP Load
RRC Connection Setup Intensity
Due to UE releases by Inactivity
Due to UE releases by RLC Supervision
Incoming Handover Intensity
Hardware expansion
5. Connected Users License
Recommended setting
Current setting (noOfPucchSrUsers =
(noOfPucchSrUsers = noOfPucchCqiUsers = 640)
noOfPucchCqiUsers = 320) nPUCCH,SR = [640/10 * 10/10] = 64
nPUCCH,SR = [320/10 * 10/10] = 32 nRB,Format1 = [(64+44)/36] = 3
nRB,Format1 = [(32+44)/36] = 3 nRB,Format2 = [640/(4*80) * 10/10] = 2
nRB,Format2 = [320/(4*80) * 10/10] = 1 nRB,PUCCH = 3 + 2 = 5 (even 6, <
nRB,PUCCH = 3 + 1 = 4 max RB pair per DU)
pmPucchSrCqiResCongCqi
The number of times a PUCCH allocation
request for CQI resource(s) could not be
granted
pmPucchSrCqiResCongSr
The number of times a PUCCH allocation
request for SR resource(s) could not be
granted
Pdcch resources
adaptive pdcch (1/2)
PDCCH is used for
UL/DL scheduling assignments, e.g. PUSCH/PDSCH resource
indication, transport format indication, HARQ info and
PUCCH/PUSCH PC commands
Number of OFDM symbols available for PDCCH in a sub-
frame is CFI. Max OFDM symbols, limited by pdcchCfiMode,
is not exceeded
Recommended setting:
Bandwidth =< 10MHz : CFI_AUTO_MAXIMUM_3 (current setting), to
handle peaks of PDCCH load
Bandwidth > 10MHz : CFI_AUTO_MAXIMUM_2, since higher number of
Pdcch resources
observability
pmPdcchCceUtil
PDF of % of CCEs utilized compared with total CCEs available (at the maximum CFI
permitted by pdcchCfiMode) each subframe, considering bandwidth and antenna
configuration.
pmPdcchCfiUtil
PDF of number of subframes each CFI value was assigned
Focus areas
LTE High Capacity Focus Areas
1. Control Channel Dimensioning
PUCCH Resources
PDCCH Resources
2. UL Noise Rise
3. PRB Utilization / Cell Throughput Capacity
4. MP Load
RRC Connection Setup Intensity
Due to UE releases by Inactivity
Due to UE releases by RLC Supervision
Incoming Handover Intensity
Hardware expansion
5. Connected Users License
pmSinrPuschDistr
Distribution of the SINR values calculated for PUSCH
pmRadioRecInterferencePwr
The measured Noise and Interference Power on PUSCH, according to 36.214 of the
SINR values calculated for PUSCH
pmRadioRecInterferencePwrPucch
The measured Noise and Interference Power on PUCCH, according to 36.214
pmRadioTbsPwrRestricted
The number of Transport Blocks on MAC level scheduled in uplink where the UE
was considered to be power limited.
pmRadioTbsPwrUnrestricted
The number of Transport Blocks on MAC level scheduled in uplink where the UE
was NOT considered to be power limited.
Focus areas
LTE High Capacity Focus Areas
1. Control Channel Dimensioning
PUCCH Resources
PDCCH Resources
2. UL Noise Rise
3. PRB Utilization / Cell Throughput Capacity
4. MP Load
RRC Connection Setup Intensity
Due to UE releases by Inactivity
Due to UE releases by RLC Supervision
Incoming Handover Intensity
Hardware expansion
5. Connected Users License
Summary of High Capacity Parameter Settings
Prb utilization / cell throughput capacity
schedulingalgorithm
Current setting
schedulingAlgorithm = 3
(PROPORTIONAL_FAIR_MEDIUM),
propose to change to following
at high load
4 (PROPORTIONAL_FAIR_LOW) or
5 (MAXIMUM_C_OVER_I)
Higher Cell Throughput
Higher TTI utilization
Higher PRB utilization
System Fairness Cell Throughput For PFL or Max C/I, user at
cell edge may have low
throughput, as scheduler
has higher weightage for RF
condition
Performance comparison
between different schedulers
Best cell throughput (from
lowest to highest)
RR < ER < PFH < PFM < PFL <
MCI
System fairness (from lowest to
highest)
Prb utilization / cell throughput capacity
observability
Average Cell Throughput UL = pmUeThpVolUl/
(pmSchedActivityCellUl/1000)
Average Cell Throughput DL = pmPdcpVolDlDrb/
(pmSchedActivityCellDl/1000)
pmPrbUtilUl
A distribution that shows the uplink Physical Resource Block (PRB) pair
utilization (total number of used PRB pairs by available PRB pairs) on the
Physical Uplink Shared Channel (PUSCH)
pmPrbUtilDl
A distribution that shows the downlink Physical Resource Block (PRB)
pair utilization (total number of used PRB pairs by available PRB pairs)
on the Physical Downlink Shared Channel (PDSCH)
Number of UEs stay in RRC_Connected state will be larger, thus lowering the
number of available Connected Users License for new users
Mp load
1.2 RRC Connection setup intensity
(due to UE releases by rLC Supervision) cont
#8 RLC Failure
Mp load
2. incoming handovers intensity
Current setting for handover is
ReportConfigEUtraBestCell::a3offset = 3dB
ReportConfigEUtraBestCell:: hysteresisA3 = 1dB
ReportConfigEUtraBestCell:: timeToTriggerA3 = 40ms
pmPagS1Received
This counter counts the number of received S1AP paging messages in the RBS.
pmPagS1Discarded
The number of discarded S1AP paging messages not routed to any cell due to high load (MP
Load Control).
pmRrcConnEstabFailHighLoad
The total number of failed RRC connection establishments due to high load (MP Load Control).
pmRrcConnEstabFailOverload
The total number of failed RRC connection establishments due to overload (Procedure Latency
Supervision).
pmHoPrepRejInHighLoad
The number of Handover Preparation Failure messages sent by the target eNodeB due to high
load (MP Load Ccontrol).
pmHoPrepRejInOverload
The number of Handover Preparation Failure messages sent by the target eNodeB due to
overload (Procedure Latency Supervision).
Focus areas
LTE High Capacity Focus Areas
1. Control Channel Dimensioning
PUCCH Resources
PDCCH Resources
2. UL Noise Rise
3. PRB Utilization / Cell Throughput Capacity
4. MP Load
RRC Connection Setup Intensity
Due to UE releases by Inactivity
Due to UE releases by RLC Supervision
Incoming Handover Intensity
Hardware expansion
Connected users license
Current Connected Users License is 800 per DUL
Connected Users license should be topped-up for high traffic sites on demand
basis
Increase Connected Users License
DUL Rrc Conn may have impact on signaling load
user
DUL21 1500
DUL31 2500
DUL41 3000
Connected Users
License check is
part of RRC Setup
procedure
Connected users
observability
pmRrcConnEstabFailLic
The total number of failed RRC
Connection Establishments due to lack of
connected users license
Focus areas
LTE High Capacity Focus Areas
1. Control Channel Dimensioning
PUCCH Resources
PDCCH Resources
2. UL Noise Rise
3. PRB Utilization / Cell Throughput Capacity
4. MP Load
RRC Connection Setup Intensity
Due to UE releases by Inactivity
Due to UE releases by RLC Supervision
Incoming Handover Intensity
Hardware expansion
5. Connected Users License
Summary of High Capacity Parameter Settings
Parameter
Summary of high cap parameters
Current Recommended Objective
SRB/DRB::dlMaxRetxThreshold 8/8 8/8 (no change) Max # RLC re-Tx in UL/DL (control signaling
SRB/DRB::ulMaxRetxThreshold 8/8 8/8 (no change) load). Recommended setting is already set
SRB/DRB::tPollRetransmitDl 45ms/50ms 80ms/80ms Increase poll timer for RLC re-Tx (if no status
SRB/DRB::tPollRetransmitUl 45ms/50ms 80ms/80ms report received) to avoid RLC failures,
reduce signaling load
T310 / T311 20 / 1 20 / 1 (no change) Recommended setting is already set, for
RLC supervision
N310 / N311 2s / 3s 2s / 3s (no change) Recommended setting is already set, for
RLC supervision
a3Offset 30 (3dB) 50 (5dB) (low priority) Reduce signaling load. Will review feasibility
to use alternative approach on UE Level
Oscillating Handover Minimization feature
THNAK YOU