deck
Lighti Paveme
ng nt
SUPER
STRUCTUR
E
Drainag
e Parapet
system s
Bridge Deck
main component
to provide support to local vertical loads which are
highway traffic and pedestrians
method used for pre-stressing is Post-tensioned
girder system
50kg cement: 22.7 L of
The duct is positioned and water: 227 gms grout
tied to the reinforcing cage duct is then grouted. additive,
at 1.00m spacing.
water cement ratio = 0.45.
Prestressing is done in
when = 45 N/mm2 by BBR
CONA compact boned
system
Pavement
Treatment of existing road
Notes:
The surface of excavated should not exceeding 50mm.
The tack coat which are applied to existing pavement surface before receiving further bituminous
surfacing or overplay should conform to SUB-SECTION 4.3.2 of the standard specification for road
works (JKR/SPJ/2008-S4).
The material excavated as a result of breaking up of the existing pavement surface which is to be used
in the construction of new pavement shall be broken into pieces such that the dimension of the largest
side of each piece shall not exceed 50mm.
The excavated material which is not to be used in the construction of new pavement shall be disposed
to the satisfaction of the S.O
All existing pavement surfaces exposed in the course of cutting and/or forming keys shall receive tack
coat in according with SUB-SECTION 4.3.2 of the standard specification for road work (JKR/SPJ/2008-S4)
prior to receiving further bituminous surfacing.
Parapet
traffic barriers (vehicle parapet)
pedestrian barriers (pedestrian parapet).
material used to construct the parapet are aluminium,
steel and concrete.
In the flyover railway in Padang Besar the concrete
parapets is used.
high level R.C. parapet
thrie beam to F-shape concrete barrier
drain
street to the road side drain