Vous êtes sur la page 1sur 42

SINCERITY WILL POWER TECHNOLOGY

MAEDA CORPORATION
MAEDA VIETNAM Co., Ltd.

www.maedavietnam.com.vn
CONTENTS

1. OVERVIEW

1.1. MAEDA CORPORATION (MAEDA CORP)


1.2. MAEDA VIETNAM CO.,LTD. (MAEDA VIETNAM)

2. EVALUATION AND CONTROL OF SIGNIFICANT


HAZARDS FOR FOOD SAFETY

3. REASONS TO CHOOSE MAEDA VIETNAM

4. COMPETENCY OF MAEDA CORP AND MAEDA VIETNAM

4.1. FOOD FACTORY CONSTRUCTION BY MAEDA CORP


4.2. COMPLETED FACTORY PROJECTS

www.maedavietnam.com.vn
1.1. OVERVIEW OF MAEDA CORPORATION

Sincerity

As long as business is kept ongoing, a company has to profit


from it. Provided, however, that if it merely takes account of
making profit regardless of the circumstances, the business may
not last long. Only where a company conducts itself sincerely and
keeps a genuine report with its clients, will its business last and
develop. Sincerity is a pillar in carrying on business.

Willpower

Being at work which is challenging, one has to fight with his very
self. Without self-confidence, whereby one believes he shall in no
Sincerity Willpower Technology event lose to anyone else in terms of technology, price and
construction period, and without Willpower whereby one whips
himself into overcoming challenges, no one can proceed with
The company was established as a civil engineering firm in 1919 works.Willpower is a resource that nourishes morale that is
with the name Maeda Jimusho. indispensable to ones work as well as ones life.

Maeda Corporation was established in 1946.

Corporate Foundations Laid through Dam Construction in


the 1960s and 1970s Technology

From Dams to Urban Engineering: Participation in National Maeda is a firm that sells its Technology. It is Maedas
Projects in the 1980s constant desire to deliver a work product which, with just a glance
at its workmanship, can easily be identified as one completed by
Accumulating a Track Record of Success in Building Maeda. It is the Technology that competitors like to borrow
Construction and Overseas Projects in the 1990s from Maeda, rather than that which Maeda tends to borrow from
them, which gives Maeda an edge on them.
Maeda Displays its Technological Capabilities Overseas
and Aims for the No. 1 Environmental Management in the
2000s Corporate Motto, enacted in January 1968

www.maedavietnam.com.vn
1.1. OVERVIEW OF MAEDA CORPORATION
MAEDA CORPORATION OPERATES 13 OVERSEAS OFFICES

India Myamar China Hong kong

Turkey

U.S.A

Thai

Mexico

Sri Lanka
Cambodia Indonesia Vietnam Taiwan

www.maedavietnam.com.vn
1.1. OVERVIEW OF MAEDA
APPLYING SCIENCE AND TECHNOLOGY TO THE DEVELOPMENT OF WORLDWIDE PROJECTS

Thailand Asian Highway Network China Shenzhen Center Thailand Yokohama


(1965) Bac Ninh Province - Toyo Ba Ria Vung Tau Province Kyoei Ha Noi Mitsui Mining & Smelting (Under
Building (1997) Manufacturing PC (2006) Ink Compounds VN (2010) Steel (Under construction) construction)
Vinh Phuc Province Nippon Paint (Under
construction)
Hai Duong Province Toyo Denso VN (Phase 2)
(Under construction)
Hai Phong City Idemitsu Lube Oil VN (Under
construction)
Hai Phong City Yamashita Rubber (Preparing)

Ba Ria Vung Tau Province Air Water Inc


(Preparing)
Dong Nai Province Nisshin Seifun (Preparing)

Hung Yen Province - SOC


Guam Hyatt Regency VN (2012) Binh Duong Province P&G (2013)
India NTN (2006) Business composition
(1993) Ha Noi Rhythm Kyoshin (2013)
HCM Japanese School (2013)
Infrastructure
39.7%
Building
60.3%
Stock acquisition of COFICO company

2013 (2015)

Binh Thuan Province Damy Tie-up with COFICO company 2012


Hong Kong International
Dam (2000)
Airport Terminal1998
Maeda VN establishment 2007

Civil building work entry 2004

2000 Obtained ISO14000

Start project Damy Dam 1997 Obtained ISO9000

Deming prize Heizei Wind power station (2010


Business composition 1989 Akebono Brake 2001

Building
38.2%
Infrastructure
61.8%

(1970)
Tokyo Bay Aqua-line1998
THE TOKYO
Fukuoka Dome1993)
TOWERS (2008)

Idabashi Redevelopment project


Takase Dam1979 Seikan tunnel1987 Nagano Olympic Stadium1998) Akashi Kaikyo Bridge1998 THE TOKYO TOWERS (2008 (During construction

Dam construction National project promotion Development of shift to civil building work, skyscraper PCProduction facility/ Overseas business development Participation environtmental / PPP

1900 1970 1980 1990 2000 2013 2015

www.maedavietnam.com.vn
1.1. OVERVIEW OF MAEDA CORPORATION
PHOTOS OF HIGH-RISE BUILDINGS IMPLEMENTED BY MAEDA CORPORATION
Gl o r io To wer
Yo k o h ama Mo t o mac h i
Location : Naka-ward,Yokohama-City,Kanagawa,Japan
Main use : Apartment
Architect : Maeda Corporation
General contractor : Maeda Corporation
Completion date : March 2005
Site area : 3,952.2
Building area : 2,339.0
Total floor area : 29,813.5
Number of floor : 22 floor above ground, 1 floor below ground
Structure : Reinforced concrete structure

M .M . To wer s
Location : Nishi-ward,Yokohama-City,Kanagawa,Japan
Main use : Apartment
Architect : Mitsubishiestate Co., Ltd.
General contractor : Maeda Corporation
Completion date : February 2003
Site area : 16,341.29
Building area : 7,957.55
Total floor area : 116,363.58
Number of floor : 30 floor above ground, 1 floor below ground
Structure : Reinforced concrete structure

Fa mi l l e Ts u k i s h i ma
G r a n d - S u i t e To w er
Location : Chuo-ward, Tokyo, Japan
Main use : Apartment
Architect : Maeda Corporation
General contractor : Maeda Corporation
Completion date : September 2002
Site area : 2,255.5
Building area : 1,127.5
Total floor area : 24,856.4
Number of floor : 30 floor above ground
Structure : Reinforced concrete structure

R o n a i S h in j u k u g y o en To w e r
Location : Shinjuku-ward, Tokyo, Japan
Main use : Apartment
Architect : Nikken Housing System CO.,LTD.
General contractor : Maeda Corporation
Completion date : January 2003
Site area : 1325.10
Building area : 659.00
Total floor area : 11862.60
Number of floor : 25 floor above ground, 2 floor below ground
Structure : Steel structure
Steel framed rainforced concrere structure

www.maedavietnam.com.vn
1.1. OVERVIEW OF MAEDA
PHOTOS OF URBAN REDEVELOPMENT WORKS IMPLEMENTED BY MAEDA CORPORATION
Mur omachi 1 chome ar ea
ur ban r edevel opment pr oj ect
Location : Kokurakita-ward,Kitakyusyu-city,Fukuoka,Japan
Main use : Office, Commercial institution, Studio, Theater
Architect : The Jarde Partnership, Nihonsekkei, Inc.
General contractor : Maeda Corporation
Completion date : March 2003
Site area : 21,948.2
Building area : 18,218.5
Total floor area : 162,161.2
Number of floor : 16 floor above ground, 2 floor below ground
Structure : Steel framed rainforced concrere structure

Wa k a ei w a t a s t a t i o n a r ea
u r b a n r ed ev el o p men t p r o j ec t
Location : Higashiosaka-city,Osaka,Japan
Main use : Apartment, Commercial institution
Architect : Kume sekkei Co., Ltd.
General contractor : Maeda Corporation
Completion date : July 2002
Site area : 10,993.8
Building area : 8,699.0
Total floor area : 61,055.6
Number of floor : 29 floor above ground, 1 floor below ground
Structure : Reinforced concrete structure

S h i n k o y a s u s t a t i o n ea s t a r ea
u r b a n r ed ev el o p men t p r o j ec t
Location : Kanagawa-ward,Yokohama-city,Kanagawa,Japan
Main use : Apartment, Office, Commercial institution
Architect : Azusa Sekkei Co., Ltd.
General contractor : Maeda Corporation
Completion date : March 2001
Site area : 23,852.7
Building area : 17,066.2
Total floor area : 123,382.8
Number of floor : 40 floor above ground, 2 floor below ground
Structure : Reinforced concrete structure

S h i n s u g i t a s t a t i o n a r ea
u r b a n r ed ev el o p men t p r o j ec t
Location : Isogo-ward,Yokohama-city,Kanagawa,Japan
Main use : Apartment, Commercial institution
Architect : Matsudahirata, Sigma Joint venture
General contractor : Maeda Corporation
Completion date : October 2004
Site area : 10,623.0
Building area : 9,151.1
Total floor area : 60,970.7
Number of floor : 30 floor above ground, 1 floor below ground
Structure : Reinforced concrete structure

Ta k es h i b a w h a r f
u r b a n r ed ev el o p men t p r o j ec t
Location : Minato-ward, Tokyo, Japan
Main use : Hotel, Commercial institution
Architect : Nihonsekkei, Inc.
General contractor : Maeda Corporation
Completion date : July 1995
Site area : 45,894.10
Building area : 14,460.00
Total floor area : 53,919.40
Number of floor : 25 floor above ground, 3 floor below ground
Structure : Steel structure
Steel framed rainforced concrere structure

www.maedavietnam.com.vn
1.2. OVERVIEW OF MAEDA VIETNAM CO.,LTD.
PHOTOS OF JAPAN ODA PROJECT ARE EXECUTING BY MAEDA CORPORATION AND MAEDA VIETNAM IN VIETNAM
A MY DAM-HM THUN-BNH PHC (2000 Tan Son Nhat AirportHCM, 2007

SUBWAY LINE 1 (TP HCM 2015~2019) Location Ho Chi Minh City, South
Main products International Airport Terminal
Owner SOUTHERN AIRPORT AUTHORITY
Design Japanese airport consultant
Contractor KashimaTaiseiObayashiMaeda JV
Terms of work 42 months07/200412/2007
Total floor 92,920 m2
area

8 www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
FINACIAL CAPABILITY OF MAEDA AND MAEDA VIETNAM

MAEDA CORP FINANCIAL CAPABILITY MAEDA VIETNAM FINANCIAL CAPABILITY


CONSOLIDATED FINANCIAL CRITERIA CONSOLIDATED FINANCIAL CRITERIA
MAEDA CORP CONSOLIDATED SUBSIDIARIES MAEDA VIT NAM
Years ended March 31 Years 2015 Years ended March 31 Years 2015
USD USD
2015 2015
Net sales 3,373,363,000 Net sales 27,732,056
Total assets 3,563,535,000 Total assets 8,576,365
Total shareholders' equity 1,051,377,000 Total shareholders' equity 618,695
Total liabilities 1,468,270,000 Total liabilities 7,957,671

$4,000,000
$30,000,000
3,563,535 27,732,056
$3,500,000 3,373,363

$25,000,000
$3,000,000

$2,500,000 $20,000,000

$2,000,000
$15,000,000
1,468,270
$1,500,000
1,051,377
$10,000,000 8,576,365
$1,000,000 7,957,671

$500,000 $5,000,000

$0 618,695
Tng Doanh Tng ti sn Tng vn ch Tng n phi $0
Unit: 1,000 USD thu s hu tr Tng Doanh Tng ti sn Tng vn ch Tng n phi
thu s hu tr

9 www.maedavietnam.com.vn
1.2. OVERVIEW OF MAEDA VIETNAM CO.,LTD.

Maeda Corporation Hanoi Rep., office

Local CoporationMaeda Vietnam Co., Ltd Ha Noi Office

Local CoporationMaeda Vietnam Co., Ltd Da Nang Office

Local Coporation Maeda Vietnam Co., Ltd Head office

Establishment: 07 December 2007


Number of Employees: 119 (FOREIGNER: 12 Staff; VIETNAMESE: 107 Staff)
Scope: TECHNICAL ADVICE, DESIGN, CONSTRUCTION, AND SUPERVISION

www.maedavietnam.com.vn
1.2. OVERVIEW OF MAEDA VIETNAM CO.,LTD.
MAEDA VIETNAM IS A DESIGN BUILD GENERAL CONTRACTOR

MAEDA Vietnam is officially licensed business in the areas of consulting, design construction.
Please contact us, you will be provided with best solutions and services.

Consulting companies established in We provide the most appropriate


Vietnam in tutorials, surveys, industrial solutions for businesses interested in
options CONSTRUCTION construction factories, office buildings in
WORKS Vietnam

CONSULTING
Renovation and expansion
of structures with highest
EXTERNAL level of modern design
WORKS

We are always ready to serve both the


construction and
installation of new equipment and the
maintenance of buildings
CONSTRUCTION REMODELING
WORKS

Provide demolition services


of existing structures and
Implement appropriate
solutions for the new
construction projects

REPAIR/UPGRADE
DESIGN WORKS
We are able to provide
the most appropriate solution
for ay upgrades or necessary
repairs as requested by client.
MAEDA industry staff from Japanese design &
building firm are experts in structural design, MAINTANANCE
architectural design for the electric motor, fitted for WORKS We will provide the best maintenance
the work. services, also including the maintenance
We also implement the construction solutions for the of
prevention of errors in the basic design. electrical equipment, machinery.

www.maedavietnam.com.vn
1.2. OVERVIEW OF MAEDA VIETNAM CO.,LTD.
MAEDA VIT NAMS ORGANIZATION CHART

www.maedavietnam.com.vn
1.2. OVERVIEW OF MAEDA VIETNAM CO.,LTD.
MAEDA VIETNAM BUSINESS LISENCE FOR DESIGN & CONSTRUCTION

1- Technical, Design, Construction


Consultant, Civil construction, industrial
and transportation supervision.
2- Installation for Mechanical equipment
system, Electrical system, Water supply &
Sewage system.
3- Project management Consultant

13 www.maedavietnam.com.vn
1.2. OVERVIEW OF MAEDA VIETNAM CO.,LTD.
PHOTOS OF CONSTRUCTION WORKS IMPLEMENTED BY MAEDA VIETNAM

FACTORY FLOOR PAINT FINISHING TILE WORK

STONE WORK PVC SHEET FINISHING CARPET FINISHING

INTERIOR DESIGN SAUNA & STEAM ROOM DECORATION

www.maedavietnam.com.vn
1.2. OVERVIEW OF MAEDA VIETNAM CO.,LTD.
PHOTOS OF CONSTRUCTION WORKS IMPLEMENTED BY MAEDA VIETNAM
OFFICE INTERIOR DESIGN INTERNAL DECORATION

OUTDOOR SWIMMING POOL DESIGN FACTORYS CANTEEN DESIGN

EXTERIOR LANDSCAPING DESIGN & DECORATION

www.maedavietnam.com.vn
2. EVALUATION AND CONTROL OF SIGNIFICANT HAZARDS FOR FOOD SAFETY

COMMON HAZARDS TO FOOD AND BEVERAGE PROCESSING

www.maedavietnam.com.vn
2. EVALUATION AND CONTROL OF SIGNIFICANT HAZARDS FOR FOOD SAFETY

APPLICATION OF GMP, SSOP, HACCP IS RECOMMENDED

HACCP
Hazard analysis and critical
control points

Good manufacturing practice


OTHER SUPPORTING
Operating Procedure
Sanitation Standard

PROGRAM
SSOP

GMP
PREREQUISITE

17 www.maedavietnam.com.vn
2. EVALUATION AND CONTROL OF SIGNIFICANT HAZARDS FOR FOOD SAFETY

SOME EXAMPLES OF WHEN GMP, SSOP, HACCP ARE IGNORED

THE WAY MICE Leakage & lubrication


CAN GET INTO grease can infect to
products

Between floor and skirting Dirt from gypsum board


is dirty and floor cracking may infect to factory

18 www.maedavietnam.com.vn
2. EVALUATION AND CONTROL OF SIGNIFICANT HAZARDS FOR FOOD SAFETY

THE SOLUTIONS FOR PRODUCTS QUALITY ASSURANCE

OUR EXPERIENCE IN DESIGN FOR ENTRANCE AND HALLWAYS OF FOODS PROCESSING TO AVOID THE INSECTS

www.maedavietnam.com.vn
2. EVALUATION AND CONTROL OF SIGNIFICANT HAZARDS FOR FOOD SAFETY

THE SOLUTIONS FOR PRODUCTS QUALITY ASSURANCE

OUR PROPOSAL FOR FOODS & DRINKS PROCESSING SHIPPING AREA

NORMAL DESIGN OUR DESIGN PROPOSAL

www.maedavietnam.com.vn
2. EVALUATION AND CONTROL OF SIGNIFICANT HAZARDS FOR FOOD SAFETY

APPLY GMP & HACCP IN CONSTRUCTION

NORMAL APPLY GMP & HACCP

CAN WASH AND CLEAN


ROUND ANGLE
WALL

WALL
ROUND ANGLE

WALL WALL FLOOR


CEILING

WALL

WALL
PANEL CEILING

SUSPENDED
CEILING PANEL ROUND ANGLE

WALL LEDGE
DOOR

MAKE 45
WALL

WALL

21 www.maedavietnam.com.vn
2. EVALUATION AND CONTROL OF SIGNIFICANT HAZARDS FOR FOOD SAFETY

THE SOLUTIONS FOR PRODUCTS QUALITY ASSURANCE

PANEL TYPE PARTITION


Prefabricated Panel
Shorten Construction Period (2 4 weeks)
Easy Handling
Flexibility of Room Layout (Demountable)
Easy Maintenance

www.maedavietnam.com.vn
3. HAZARDS ANALYZATION
THE SOLUTIONS FOR PRODUCTS QUALITY ASSURANCE

HANGING SYSTEM FOR CLEAN ROOM CEILING AND DUCTING


DUCTING FOR
SECONDARY FRAME
VENTILATION & A/C
FOR SUPPORT
DUCTING & HANGING
CEILING PANEL

CEILING PANEL FOR


CLEANROOM
EASY FOR
MAINTENANCE BECAUSE
PEOPLE CAN WALK ON
CEILING

WHAT IS THE 1.SUPPORT CEILING TO PREVENT DEFORMATION.


2.SUPPORT VENTILATION SYSTEM DUCTING.
BENEFIT OF 3.LARGER SPACE AVAILABLE FOR MAINTENANCE FROM UPPER SIDE
OUR HANGING 4.NO NEED TO REMOVE THE CEILING AS T-BAR SYSTEM.
SUPPORT 5.MAINTENANCE STAFF COULD WALK ON THE CEILING PANEL FOR
PROPOSAL? MAINTENANCE OF DUCTING, ELECTRIC SYSTEM.
6. NEED FOR ELEVATED CATWALK FOR MAINTANANCE IS ELIMINATED

www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
BRING HEARTED AND PROFESSIONAL SERVICES TO CLIENT/ CUSTOMER

INFORMATION TO CLIENT FOR OBTAIN THE PERMIT :


SELECT THE LOCATION
- ENVIROMENT
- FIRE FIGHTING
BASIC DESIGN FOR BUILDING - URBAN PLANNING
SUPPORT & MEETING IN JAPAN & - CONSTRUCTION PERMIT
M-E WORK - AS BUILT PERMIT

JAPANESE STAFF & VIETNAMESE STAFF COMUNICATION WITH DESIGN FOR CONSTRUCTION & SHOP DRAWING
CLIENT IN JAPANESE & ENGLISH DURING WORK

EXECUTION & MANAGEMENT OF CONSTRUCTION AT SITE


AWARD FROM CLIENT

OBTAIN THE FINAL INSPECTION CERTIFICATE BY GOVERMENT

PROCEDURE AS LEGAL FOR AS-BUILT WITH GOVERMENT

ARCHIVE DOCUMENT AND DATA BASE


AVAILABLE & READY ANYTIME

MAINTERNANCE SERVICE PRRIODIC AFTER HANDOVER

www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
THE STRICT PROCEDURE OF MANAGEMENT, DESIGN CONTROL & EXECUTING

RESEARCH THE AVAILABLE


MATERIAL

MAEDA TOKYO HEAD DESIGN / SPECIFICATION ENGINEERING EQUIVELENT WITH STANDARD


OFFICE DESIGN & MATERIAL
SECTION

MATERIAL CERTICATE ISSUED BY AUTHORITY

SUPPLIER /SUBCONTRACTOR SELECTION

FABRICATION FOR STRUCTURE / ARCHITECT MATERIAL

SITE & LABORATORY TESTING BY ISSUE THE RESULT OF


3RD PARTY TESTING

SITE INSPECTION FOR CONSTRUCTION BY QC STAFF

APPROVAL BY CLIENT

FINAL BUILDING INSPECTION BY CONST.


HANDOVER
DEPT OF GORVEMENT

www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
INSIDE THEMAL SIMULATION ( CASE-1: USING GLASSWOOL INSULATION MATERIAL)

ACTUAL SILULATION IMAGE:


SUZUKI IMPLEMENTED BY MAEDA
10/2013

LEVEL: =5.5m

SILULATION CONDITON:
-OUTDOOR TEMPERATURE: 35.1oC
-INSULATION : GLASS WOOD DENSITY
12KG/M3

LEVEL: H=1.5m

SECTIION:

26 www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
INSIDE THEMAL SIMULATION ( CASE-2: USING AIRBUBLE INSULATION MATERIAL) PROPOSAL FOR CLEANING

ACTUAL SILULATION IMAGE:


SUZUKI IMPLEMENTED BY MAEDA 10/2013

LEVEL: =5.5m

SILULATION CONDITON:
-OUTDOOR TEMPERATURE: 35.1oC
-INSULATION: AIR INSULATION SHEET

LEVEL: H=1.5m

MT CT:

27 www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
PERIODICAL MAINTENANCE TESTING PROCEDURE


CLIENT


MAINTENANCE CONTRACT
MAEDA
VIETNAM

REPAIRING SOLUTION PROPOSAL


PERIODICAL TESTING


QUOTATION


TESTING REPORT

REPAIRING


INPUT DATA BASE

www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
KEY POINT AND PRINCIPLE OF SAFETY POLICY

10 POINTS OF SAFETY
1. GOOD ARRANGEMENT OF HOT WORK
PROCESSES USING FLAME AND OTHER HEAT
SOURCE.
EQUIPMENT
OPERATION 2. CORDON OFF HAZARDOUS AREAS INVOLVING
EXPLOSIVE HANDLING AND BLASTING AREAS.
3. ALL OPENINGS AND HOLES MUST BE COVERED
PROPERLY TO ELIMINATE RISK OF FALLING.
4. WHEN LIFTING OPERATION ARE IN PROGRESS,
ALL WORKERS MUST BE PROHIBITED FROM
ENTERING THE AREAS BENEATH THE LOAD.
5. ENSURE THE LIFTING APPLIANCES, LIFTING
GEARS, SCAFFOLDINGS, FALSE WORK AND
WORKING PLAFORMS ARE IN GOOD SAFETY
FALL CONDITION.
PREVENTION OF
PERSONNEL AND 6.NEVER ENTER THE WORKING AREA WHILE THE
MATERIAL MACHINERY IN OPERATION WITHOUT SAFETY
PROVISION AND PERMISSION.
7. ENSURE THAT THE SAFETY OF SLOPE WORKS
AND EARTH WORK ARE MAINTAINED PROPERLY
TO PREVENT FALLING ROCK AND FLOODING.
8. ENSURE THE DETECTION OF TOXIC GASES AND
OXYGEN DEFICIENCIES IS CARRIED OUT TO
PROTECT WORKERS ENGAGED IN CONFINED
SPACE WORK.
FIRE
PREVENTION 9. PROVISION OF FULL PERSONAL SAFETY
PROTECTION EQUIPMENT TO WORKERS AND
VISITORS.
10.ENSURE THAT THE DAILY INSTRUCTIONS ARE
THOROUGHLY UNDERSTOOD BY ALL WORKERS

29 www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
WEEKLY - MONTHLY SAFETY WORK CYCLE
MONTHLY SAFETY MONTHLY CYCLE ACCIDENT
PROCESS
PREVENTION
DISCUSSION
COUNCIL

WEEKLY SAFETY WEEKLY CYCLE SAFETY PATROL


PROCESS ( PERIODICAL
DISCUSION INSPECTION)

SAFETY &
SAFETY AND DAILY SAFETY HEALTH
HEALTH WORK CYCLE GENERAL
EDUCATION
MEETING
( MONTHLY SAFE
DAY)

CONTRACTOR WEEKLY WEEKLY


FOREMAN MEETING OVERALL SITE OVERALL
( SAFETY PATROL) CLEAN-UP INSPECTION

CONTRACTOR REGULAR
FOREMAN INSPECTION
MEETING (MONTHLY
( MONTHLY ANNUAL)

30 www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
SAFETY APPLIED FOR OVERALL SITE

SAFETY TRAINING BEFORE WORKING


MORNING EXERCISE SAFETY TALKING SITE CHECKING

DAILY SAFETY MEETING SAFETY PATROL RISK DETECTION MEETING AFTER SAFETY PATROL

SUBCONTRACTORS REWARDED 600.000 HOURS SAFE WORK


SITE CLEANING WEEKLY SAFETY MEETING WEEKLY PERFORM GOOD SAFETY CEREMONY

31 www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
SAFETY APPLIED FOR OVERALL SITE

SCAFFOLDING BASED ON SHOP-DRAWING


WITH PROTECTION NET INSTALLATION

SCAFFOLDING SHOP-DRAWING BEFORE IMPLEMENT

SAFETY NET INSTALLTION

32 www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
THE PROFESSIONAL ENGINEERS AND ARCHITECTS

LISENCE FOR STRUCTURE & ARCHITECT DESIGN LISENCE FOR M&E WORK DESIGN

LISENCE FOR CIVIL WORK SUPERVISOR LISENCE FOR M &E WORK SUPERVISOR

www.maedavietnam.com.vn
3. THE BENEFITS WHEN SELECTING MAEDA VN
WE GET CERTIFICATE OF QUALITY MANAGEMENT SYSTEM ISO 9001:2008

34 www.maedavietnam.com.vn
4.PHOTOS OF FOOD AND BEVERAGE FACTORY IMPLEMENTED BY MAEDA & MVC

4.1 THE FOOD FACTORY PROJECTS COMPLETED


Din tch/Area
CONST PERIOD
FUNCTIONAL (m2) Height
PJ CODE PJ NAME OWNER TOTAL INVESTMENT LEVEL Location
Commencement Completion Land Construction

Hokkaido New Factory Sapporo Breweries JSC. Plant and sea food Hokkaido
1007164000

1987/Apr.02 1989/Aug.31
13,551,296,000 318,368.0 3,264,202 12.00

Miyagi
Ichinokura Factory Expansion Ichinokura JSC. Plant and sea food
1013528000

1999/Jul.02 1999/Oct.30
90,205.2 1,467 3 (13m) Prefecture
220,500,000

Miyagi
New Shinzo Factory Ichinokura JSC. Plant and sea food
1019278000

1992/Sep.12 1993/Jul.31
3,242.1 10,371 4.00 Prefecture
1,751,000,000

Hyogo
Inuizo Factory Miura Koumuten JSC Plant and sea foodn
1079563000

1995/Jun.12 1995/Oct.31
14,146.5 1,606.5 3 (16.1m) Prefecture
215,002,200

Ibaraki
Ibaraki Factory Asahi Breweries Factory Plant and sea foodn
1108049000

1989/Apr.14 1990/Dec.25
32,583.5 5.00 Prefecture
10,694,740,293

Niigata
Miso factory and Operation buidling Yamazaki Brewing Co., Ltd. Plant and sea foodn
1139094000

2005/Jun.15 2005/Nov.15
8,970.4 3,847.7 3 (17.75m) Prefecture
492,975,000

Toyama
Expansion Factory Tombow Beverage Co. Ltd NPlant and sea foodn
1152835000

2006/Oct.27 2007/May.31
7,493.9 954.2 3 (12.2m) Prefecture
255,150,000

Niigata
Warehouse expansion Yamazaki Brewing Co., Ltd. Plant and sea food
1215827000

2013/May.14 2013/Nov.30
8,970.4 1,242.8 3 (11.71m) Prefecture
195,300,000

New Kurikura Honjo Factory Saitama


NAC CO.,LTD Plant and sea food
1213905000 2013/May.13 2014/Oct.31 27,973.8 14,518.3 2 (25.78m) Prefecture
4,719,750,000

Renovation and expansion Nippon Saitama


Community Kawagoe Milk MEGMILK SNOW BRAND Co Ltd Plant and sea foodn
1184039000

2010/Apr.01 2011/Apr.30
Prefecture
150,150,000

Toyama
Mineral Water Factory Nisshin Industry Co, Ltd. Plant and sea foodn
1055613000

1993/Nov.01 1994/Feb.20
1,910.0 2,262.8 2 (9.20m) Prefecture
180,250,000

www.maedavietnam.com.vn
4. PHOTOS OF FOOD AND BEVERAGE FACTORY IMPLEMENTED BY MAEDA & MVC

4.2. NISSHIN FOODS PROJECT 2013-02_NEW-FAC (PH1)

Area
CONST PERIOD
(m2)
Warehouse
CH U T FUNCTIONAL TOTAL INVESTMENT
Capacity/ Year
Height
PJ NAME OWNER Commencem Completio LEVEL Constructio (m)
Land Area(m2) Height (m)
ent n n

Packing food products


VietNam Nisshin VietNam Nisshin 2014/Aug.
VNS 2013/Oct.29 (sauces, curries, soups 32,417 780 8.15
Seifun New factory Seifun Co.,LTD 31 289,999,990,992 8,000 year 5,510 10.50
and similar products)
(Phase 1)

www.maedavietnam.com.vn
4. PHOTOS OF FOOD AND BEVERAGE FACTORY IMPLEMENTED BY MAEDA & MVC

4.3. SUNTORY PEPSICO BC NINH FACTORY


CONST PERIOD STRUCTURE
FUNCTIONAL TOTAL INVESTMENT
Capacity/ Year Height
PJ NAME OWNER LEVEL Land Area (m2)
Commencement Completion (m) Area(m2) Height (m)

Expansion of finished
SPVB BN2 Suntory Pepsico VietNam 2014/Dec.19 2015/Apr.26 Beverage company 650 Year) 122,863 2,112 12
goods warehouse of Bac 1,479,000,000,000
Beverage
Ninh Plant

www.maedavietnam.com.vn
4. PHOTOS OF FOOD AND BEVERAGE FACTORY IMPLEMENTED BY MAEDA & MVC

4.4. SUNTORY PEPSICO CN TH PROJECT


Area
CONST PERIOD
(m2)
STRUCTURE
FUNCTIONAL TOTAL INVESTMENT
Capacity/ Year
Height
PJ NAME OWNER LEVEL (m)
Commencement Completion Land Construction Area(m2) Height (m)

CanTho Phase 2 Suntory Pepsico VietNam Beverage and Mineral water


SPVB CT 2015/Feb.24 2015/Aug.24 231.8 Year) 69,379 7,668 6,062.45 15.5
expansion Beverage Manufacture 3,147,964,942,792

www.maedavietnam.com.vn
4. PHOTOS OF FOOD AND BEVERAGE FACTORY IMPLEMENTED BY MAEDA & MVC

4.5. SUNTORY PEPSICO NNG FACTORY


Area
CONST PERIOD
(m2)
STRUCTURE
FUNCTIONAL TOTAL INVESTMENT
Capacity/ Year
Height
PJ NAME OWNER LEVEL (m) Din tch Chiu cao
Commencement Completion Land Construction
Area(m2) Height (m)

SPVB central project Suntory Pepsico BEVERAGE


SPVB DNG1 2016/Jan.18 2017/Feb.18 1.180.480.000.000 300 Year 141,804 49,448 16.60 2,696 13.5
(CGF) VietNam Beverage MANUFACTORING

www.maedavietnam.com.vn
4. PHOTOS OF FOOD AND BEVERAGE FACTORY IMPLEMENTED BY MAEDA & MVC

4.6. SUNTORY PEPSICO NNG PROJECT

FACILITIES AREA
RAW
RAW PREP.
MATERIA

CIP
MATERIALU- AREA
L U-2
1
LAB

FILLING AREA

OFFICE
PRODUCTION LINE

FINISHED GOODS WAREHOUSE

LOADING BAY

40 www.maedavietnam.com.vn
4. PHOTOS OF FOOD AND BEVERAGE FACTORY IMPLEMENTED BY MAEDA & MVC

4.7. SUNTORY PEPSICO NNG PROJECT

FACILITY AREA ENTER


RAW RAW

WASHIN
G AREA
PREPARING MATERIAL
MATERIAL AREA STORAGE
STORAGE N.2
No.1
LAB

KHU CHIT

OFFICE
PRODUCTION LINE

FINISHED GOODS WAREHOUSE

LOADING BAY
EXIT

41 www.maedavietnam.com.vn
SINCERITY WILL POWER TECHNOLOGY

WE WISH TO COOPERATE WITH


YOU IN NEAR FUTURE

MAEDA CORPORATION
MAEDA VIETNAM Co., Ltd.

www.maedavietnam.com.vn

Vous aimerez peut-être aussi