Construction Production
1 Pre-commissioning,
2 Start up and 3 Post commissioning
Equipment Inspection,
Commissioning and Performance
Equipment Operational testing
Tests Ing. Luis E. Penuela V.
Progressive mechanical completion and
concurrent commissioning creates challenges:
Coordination and planning
Safety and risk
Isolation
Testing
Integration into operating plant
Mechanical Completion
and Integrity checking
Pre-commissioning &
Operational Testing
Performance and
Acceptance testing
Post Commissioning
Inspection
Mechanical Completion
and Integrity checking Pressure testing
Cleaning and Flushing
Pre-commissioning &
Operational Testing Machinery checkout
Start Up & Initial
Operation
Performance and
Acceptance testing
Post Commissioning
Mechanical Completion
and Integrity checking
Steam and other utilities
Pre-commissioning &
Operational Testing
introduced;
Dry running trials;
Start Up & Initial
Operation Hot running trials;
Purge, Air evacuation and
Performance and
Acceptance testing
inertization of circuits;
Safe-fluid dynamic testing;
Post Commissioning
Solvent dynamic testing;
Process fluid tests.
Ing. Luis E. Penuela V.
Preparation and planning
Mechanical Completion
and Integrity checking
Pre-commissioning &
Operational Testing
Mechanical Completion
and Integrity checking
Pre-commissioning &
Operational Testing
Mechanical Completion
and Integrity checking
Pre-commissioning &
Operational Testing
Startup Time^^
Time = 8(0.15 -0.01-0.01+ 0.15+1*0.1)
= 8 * 0.38 = 3 Months