OASIS AUTOCITY
OASIS AUTOCITY
INTRODUCTION
OASIS AUTOCITY
PROJECT DESCRIPTION
CADANGAN UNTUK MEMBANGUNKAN BLOK KOMERSIAL YANG MENGANDUNGI:
FASA 1: 6 BLOK BANGUNAN KOMERSIL 7 TINGKAT BESERTA 1 ARAS SUB-BESMEN DAN 1 ARAS TEMPAT-TEMPAT LETAK KERETA BAWAH TANAH
FASA 2: BLOK BANGUNAN PEJABAT 12 TINGKAT
DI ATAS LOT PT.12 DAN PT.13 JALAN PJU 1A/7 MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
UNTUK TETUAN SIME DARBY BRUNSFIELD DAMANSARA SDN. BHD.
PROJECT DIRECTOR
NG TICK CHIEW
SAFETY OFFICER
P&M ASSISTANCE QS SYUHADA SHAKIRN
MANAGER NGU SING WEI M&E ENGINEER
THONG WENG HONG *VIJI MARIAH
*MAVIRNESH
SITE SUPERVISOR *NASRUL ISMAN SAFETY SUPERVISOR
*CHOONG WEE KOK *FIRDAUS FITRI
*MOHD FADZLY *MOHD ZIKRY
OASIS AUTOCITY
SITE LOGISTICS
& TOWER CRANE
LOCATION
OASIS AUTOCITY
GUARD
HOUSE
TOWER
CRANE
TOWER
CRANE TOWER
CRANE
WORKER REST
AREA
BIN AREA
RUBBISH
TOWER
CRANE
TOWER TOWER
CRANE CRANE
60m
60m
70m
OASIS AUTOCITY
MASTER IMPLEMENTATION
PLAN
(MIP)
OASIS AUTOCITY
DATE OF COMMENCEMENT:
28th FEBRUARY 2014
DATE OF COMPLETION:
30th MAY 2016
CONTRACTUAL DURATION :
27 MONTHS
OASIS AUTOCITY
OASIS AUTOCITY
OASIS AUTOCITY
OASIS AUTOCITY
OASIS AUTOCITY
OASIS AUTOCITY
SUMMARY OF WORK
START DATE FINISH DATE DURATION
COMPLETION : 33 MONTHS
OASIS AUTOCITY
CONSTRUCTION
METHODOLOGY
OASIS AUTOCITY
1. To prepare road base for access during site mobilization, to Site Office
Cabins and to provide parking space for Site staff and storage place for
materials.
2. Piling works need to start and piling points for tower crane foundation
need to complete before the commencement of pile cap works.
10. All reinforcement bars to use cut & bend bars, BRC mesh cut to size.
11. To prepare shop drawings for typical unit walls and slab to incorporate with
the architectural finishes and M&E services. Mock up unit to provide to
confirm the final schedule of finishes and the standard of workmanship
required
OASIS AUTOCITY
12. M&E shop drawings, cordination and routing of M&E services at walls,
soffit of slab and ceiling level to prepare and to approve before
commencement of works.
13. To produce the external infra works and services coordination drawings
and sequence of works for planning purpose.
OASIS AUTOCITY
CONSTRUCTION
SEQUENCE
OASIS AUTOCITY
FORMWORK QUANTITY (BLOCK 1 & BLOCK 6)
SUMMARY OF FORMWORK PER LEVEL
BLOCK 1 (TOWER) BLOCK 6 (TOWER)
BLOCK
BEAM / COLUMN SLAB BEAM / COLUMN SLAB
LEVEL AREA AREA AREA AREA
(2 ) (2 ) (2 ) (2 )
LEVEL 1 3681.44 2853.28 2274.63 970.02
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
OASIS AUTOCITY
VIRTUAL
CONSTRUCTION