Académique Documents
Professionnel Documents
Culture Documents
C-RAN progress
2
Challenges in Mobile Internet Era
Data Traffic
7 6.3 EB
Exabytes/Month 1 Exabyte = 1018 Byte
6
5
Gap
3.8 EB
4
3
2.2 EB
2 1.2 EB
1 0.24 EB
0.6 EB
0
2010 2011 2012 2013 2014 2015
2G 3G LTE
Construction Cost !
Inter-cell Interference !
4
Challenges in Mobile Internet Era
Other Support
Equipment,
3%
Major
Equipment,
51%
Air Conditioners,
46%
C-RAN progress
6
C-RAN: Road towards green radio access network
Virtual BS Pool
Centralized baseband pool
real time Cloud computing
Optical
Network
7
C-RANCentralized Baseband Pool
8
C-RANCollaborative Radio
interference
signal
9
C-RANReal-time Cloud Computing
App Service
TD-LTE
TD-LTE
TD-SCDMA
TD-SCDMA
GSM
GSM
10
C-RANClean System Target
50 29%
40
30
20 71%
10
0
Macro BS C-RAN saved
*Source: Base on China Mobile field trial surveys
11
Agenda
C-RAN progress
12
C-RAN Roadmap
We are here
Long Term:
Address the real-time C-RAN Research Virtual BTS on real-time Cloud Commercial
cloud challenge
Data traffic analysis product
BBU pool research development
Mid-Term:
Address the SDR and Multi-mode and Collaborative Radio Drive CoMP research
Collaborative Radio
and field trial, pre-
challenge
commercial product
Near Term:
Address the fiber Centralization Deployment Expend C-RAN
resource and
management challenge
to 2G/3G/4G
networks
13
Prototype Development
Multi-standard Large-scale
GPP prototype Baseband pool
14
C-RAN Field Trial
Jilin
GSM
Beijing
G/T/L (on going)
in China
Changsha
GSM
Zhaotong
GSM
Guangzhou
G/T/L (on going)
Dongguan
Zhuhai TD-SCDMA
TD-SCDMA
15
International Collaboration
16
Agenda
C-RAN progress
17
Collaboration with Agilent
System SDR
Measurement Research
18
C-RAN PoC Test (with GSM/TD-SCDMA/TD-LTE)
19
Summary