ELECTRICAL MOTOR DRIVE DETAILS

MAINTENANCE
ROUTINE CHECK Ups:
Noting down load current and winding
temperature.
Noting down SF6 CB Gas pressure
LLF CHECKS
Once in a month ( detail )

PM
Once in three months. ( detail )

LUBRICATION
Once in three months.
LLF PROCEDURES
A. FEELING THE MOTOR BODY TEMP. BY HAND

A. FEELING THE TERMINAL BOX TEMP. WITH HAND

A. FEELING THE CABLE TEMP. WITH HAND

A. FEELING THE DE BEARING TEMP. WITH HAND

A. FEELING THE BEARING CONDITION WITH SCREW DRIVER

A. FEELING THE VIBRATION WITH HAND

A. FEELING THE AIR FLOW PHYSICALLY

A. ANY OTHER ABNORMALITY

A. RUNNING CURRENT (WHEN AMMETER IS AVAILABLE AND MOTOR IS


RUNNING)

A. CONDITION OF POLYTHENE COVERING ON THE TB

A. CONDITION OF DOUBLE EARTHING OF MOTOR


PM FOR H.T
MOTOR
CHECK SHEET FOR H.T MOTOR PREVENTIVE
MAINTENANCE
1) After getting necessary clearances rack out the
breaker.
2) After ensuring that the motor and all cables
positively
are isolated, discharge the motor and power
cables.
3) Inspect for e following and if any abnormality
noticed,
th record the
is exact location and
made. Based on Plant-in-charges instructions, take
observation
corrective / preventive actions:
a) Any discoloration of Lugs / Cable cores / terminal
studs in the motor main terminal box.
b) Any discoloration / damage / crack in the terminal
bushings of main terminal box / Star point
box
terminal
c) Any
. moisture / water in main / star point / sp. heater
/ RTD
d) Any
TB. discoloration of lug / cable core in the
panel
breaker
e) A
. y damage to the cooling fan / any deposits on the
fan
n
blades.
f IR values of the Cable / Motor winding.
g
) Any moisture / water entry into the Motor body
) (after opening inspection
h Condition
cover). of the grease nipples.
i) Condition of LCS and the PB contact
j) Condition
elements. of the Power / Auxiliary contac ts of the
) breaker
a Cleanliness
. of the Breaker / Breaker compartment.
4
) As part of PM, ensure the following:
a
) Double earthing of the
b
) Clean
motor.cooling air inlet mesh.
c
) Clean motor surface.
d
) Proper and free closing of all doors (both LCS and
) Breaker).
e Proper earthing of
f) Free
LCS. and correct operation of push buttons /
) Selector switches both on LCS and Breaker
g Proper
panel. racking IN / OUT of breaker trolley.
h
) Proper operation of breaker position limit
i) Proper
switches.tightness of all control terminations
) (including CTs) in the breaker compartment,
LCS. IMC,
j Healthiness of space heater
k
) Free movement of shutter and moving parts of the
circuit.
) Breaker, if required by lubricating.
l IR Value of motor / Cable is not less n 5 M
) tha Ohms