1. HOW IS THE NUMBER OF CELLS DETERMINED IN
CASE OF CONCRETE BOX GIRDER BRIDGES?
At the point when the depth of a box girder bridge
surpasses 1/6th or 1/5th of the bridge width then the design
prescribed is that of a solitary cell box girder bridge. In any
case, on the off chance that the depth of the bridge is
lower than 1/sixth of the bridge width than a twin-cell or at
times multiple cells is the favored choice.

Saytooloud/Interview-Tips
One ought to likewise take note of that even in the
instances of more extensive bridges where their depths are
similarly low the quantity of cells ought to be minimized. This
is because there is detectable very little change in the
transverse load distribution when the number of cells of the
box girder is higher than at least three.

Saytooloud/Interview-Tips
2. IN WHICH YEAR WAS THE KEYSTONE POWER
PLANT IN INDIANA COUNTY CONSTRUCTED?
Commercial operation of unit 1 began in the year 1967.

Saytooloud/Interview-Tips
3. WHAT ARE THE APPLICATIONS OF THE MODULUS
OF ELASTICITY?
Modulus of elasticity is identified with the flexibility of the
material. The modulus of elasticity value is truly vital if
there should arise an occurrence of deflection of various
materials utilized as a part of building construction.

Saytooloud/Interview-Tips
4. EXPLAIN THE DIFFERENCE BETWEEN ROUTINE
MAINTENANCE AND MAJOR MAINTENANCE IN
CASE OF SCHOOL FACILITIES?
Routine maintenance is taking care of the minor repairs
of the school campus. Major maintenance could be
total reconstruction or renovation of the school.

Saytooloud/Interview-Tips
5. WHY IS PUMPING NOT USED IN CASE OF
CONCRETING WORKS?
Amid the pumping operation, the pump applied
pressure must conquer any friction between the
pumping pipes and the concrete, likewise the weight of
the concrete and the pressure head when the concrete
is put over the pumps. Since just water is pumped able,
all the pressure produced is by the water that exists in
the concrete. The real issue because of pumping is
segregation impacts and bleeding.

Saytooloud/Interview-Tips
With a specific end goal to redress and decrease these
impacts, for the most part, the extent of the cement is
increased keeping in mind the end goal to build the
cohesion, which prompts the lessening of segregation
and bleeding.
Additionally, if an appropriate selection of the total
evaluating can vastly enhance the concrete pump
capacity.
We will see more of these in the upcoming parts. Check
out this space for basic interview questions.