Vous êtes sur la page 1sur 4

Project Plan

 Name of the Project


 Date started and Date ended Marble maze
 Objective
 Tools and equipment
 Materials PROBLEM
 Sketch Your challenge is to design and construct a marble
 Procedure maze using only the materials you were asked to
 Division of work bring and the other tools and materials that your
 Instruction of the game teacher will provide.

DESIGN
Marble maze
Complexity of the design 30% Your marble maze may be constructed from
Stability of the structure 35% any size of the carton and cardboard that you
Neatness of assembly 35% have available. You need to make sure that the
structure is stable and is neatly assembled.
Group Process
Group planning and organization
of task 30 points
Progress of the project 30 points
Individual participation 40 points
Project Plan
Construction & Tips
Marble maze
 Name of the Project Consider the following when working in the classroom and
 Date started and Date ended constructing your maze:
 Objective
• A good set of plans is half the battle. Trust your ideas and work
 Tools and equipment with them without deviating too far from your original plan.
 Materials • Practice good habits in the classroom: abide by safety rules,
 Sketch maintain self control, do neat work and practice good
 Procedure housekeeping.
• Any questions asked to the teacher will result in an additional
requirement to your maze. Clarify questions with your group
Marble maze and/or other groups first.
Complexity of the design 30% • Excessively uncooperative or unproductive group members will
Stability of the structure 35% be excused from the group and expected to complete the project
Neatness of assembly 35% independently.
• You have more materials available to you that are listed in the
Group Process materials list.
Group planning and organization • Tape the box top flaps closed to give your maze stability.
of task 30 points • Avoid the use of excess glue or tape. Cut, do not tear, tape
before applying.
Progress of the project 30 points
• Test your maze after the addition of each element or event.
Individual participation 40 points • Extra points are possible for complicated movements for the
maze.

Science Technology Engineering Mathematics


Project Plan
Marble maze
 Name of the Project
Criteria Proficient Needs Warning
 Date started and Date ended
Improvement
 Objective 38 points and
 Tools and equipment 45-50 points 39-44 points below
 Materials Complexity The maze is well- The maze had The maze was very
constructed. It is some dead ends easy to find the
 Sketch of the design challenging but still was not way through all
 Procedure 30% because there is that challenging. levels. The maze
only one solution to The maze had was not thought
win the game.T he some creative out well. The maze
Marble maze maze was done aspects, but did not work
creatively and was could've used more properly.
Complexity of the design 30% fun to play. details.
Stability of the structure 35% Structure was able Structure was able Structure was
Stability of
Neatness of assembly 35% to stand without to stand for a unable to stand
the structure assistance. Good period of time with independently. Did
35% use of materials. assistance. Limited not maximize use
Group Process use of materials. of materials.
Group planning and organization
of task 30 points Neatness of It looked like a It looked like a The maze worked
Progress of the project 30 points maze and was able maze and was able but had many
assembly to go from start to to go from start to confusing steps
Individual participation 40 points 35% finish without finish with few and was not
problems problems. appealing to the
eye.
Project Plan
Group Process
 Name of the Project Criteria Proficient Needs Warning
 Date started and Date ended Improvement
 Objective 100% 80% 60%
 Tools and equipment Group The team worked The team worked Team did not
well together to well most of the collaborate or
 Materials planning and achieve their time, with only a communicate well.
 Sketch organization objective. Each few occurrences of Some members
member communication would work
 Procedure of task contributed in breakdown or independently,
30 points valuable way to the failure to without regard to
project. There is a collaborate when objectives or
Marble maze high level of mutual appropriate. priorities. A lack of
Complexity of the design 30% respect and Members were respect and regard
Stability of the structure 35% collaboration. mostly respectful of was frequently
each other. noted.
Neatness of assembly 35%
Progress of The structure is The structure is a The structure is
close to completion little behind the way behind the
Group Process the project as planned. scheduled scheduled
Group planning and organization 30 points Significant completion but completion. There
changes on the somehow shows is a minimal to
of task 30 points structure are progress in the almost no progress
Progress of the project 30 points evident. structure. of the structure.
Individual participation 40 points Active participation Participation in Participation in the
Individual
in the group work. group was group was limited
participation Hands are not idle. inconsistent and/or and often off topic.
40 points Task oriented. Not sometimes off Little to no ideas
easily distracted. topic, but still were contributed to

Vous aimerez peut-être aussi