OF PD 1586
Agriculture, Foodand
related Industries
Animal products
processing (fish/meat
processing, canning, >200 MT
≥ 2,500 Annual production
slaughterhouses, etc) None but < ≤ 200 MT
MT rate
including other marine 2,500 MT
products, crabmeat
etc.)
Food preservation
For canning, refer to
(e.g., drying, freezing) Regardless of
None None None other (applicable)
and similar methods capacity
categories
aside from canning
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
EIS EIS PD (Part I only)
Checklist
Agriculture, Foodand
related Industries
Regardless of
Ice plant/processing None None None
capacity
Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D
A:ECP Remarks
IEE PD (Part I
EIS EIS
Checklist only)
Agriculture, Food and related Industries
> 1 ton/hr
or mill with
polishing
(regardless Hourly production
Rice/corn mill None None ≤ 1 ton/hr
of rate
production
rate if with
polishing)
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Livestock Animal
Industries
a) Livestock/piggery > 100 but <
≥ 5,000
Projects – (eg. None 5,000 ≤100 heads Stocking population
heads
pigs/goats) heads
≥ 1,000
< 1,000 ≤100 heads
b) Ostrich Farming None heads OR
heads AND ≤ 1 ha
≥ 1 ha
> 10,000
c)Livestock/poultry Projects ≥ 100,000 but ≤ 10,000
None Stocking population
– (eg.-birds) heads < 100,000 heads
heads
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Livestock Animal
Industries
AGRICULTURE INDUSTRY
>50
Agricultural plantation Aggregated by
≥ 500 hectares
(e.g. orchards, including None ≤50 hectares municipality – based
hectares but < 500
rubber plantation) on contracting party
hectares
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
AGRICULTURE
INDUSTRY
>200 MT
Animal feed mill None ≥ 2,500 MT but < 2,500 ≤ 200 MT Annual production rate
MT
Fishery Projects – Dikes for/and Fishpond Development Projects shall refer to natural or
Dikes For/And artificial water impoundment involving dike construction and harvesting
FishpondDevt Projects the same as marketable size and quantities.
Fishery/Aquaculture Projects
≥ 5 hectares > 1 hectare
using fresh or brackish water ≤ 1 ha OR Based on project area
≥25 hectares but <25 but < 5
including pearl farm and similar seaweed farming (e.g., title, lease contract)
hectares hectares
activities
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D
A:ECP Remarks
IEE PD (Part I
EIS EIS
Checklist only)
Commercial, [Business
centers with residential
units (mixed use), malls,
supermarkets, public > 1 hectare Total/gross floor area
markets] ≥ 5.0 but including parking,
None ≤ 1 hectare
• Fast food/Restaurant hectare <5.0 open space and other
Projects hectares areas
• Commercial
Establishments (i.e.
Showrooms
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Non-Ferrous
Metal Industries > 200 MT
>10,000
but Annual production
> 30,000 MT MT but < < 200 MT
<10,000 rate
30,000 MT
Iron & Steel Mills MT
≥ 10,000 MT
> 200 MT but <
Smelting Plant ≥ 15,000 MT but < 15,000 ≤ 200 MT annually Annual production rate
10,000 MT
MT
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Petroleum and Petrochemical Industries (This category includes hydrocarbon products
such as LNG/CNG, etc.)
Petrochemical or ≥ 10,000 > 200 MT
≤ 200 MT
petroleum-based ≥ 30,000 MT MT but < but <
annually
Annual production rate
projects 30,000 MT 10,000 MT
Recycling of oil and
≥ 5 MT but > 1 MT but
other petroleum-based ≥ 10 MT ≤ 1 MT Daily production rate
< 10 MT <5 MT
chemicals
LPG/LNG/CNG/similar
None ≥ 10 MT < 10 MT None Total storage capacity
product storage and refilling
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Petroleum and Petrochemical Industries (This category includes hydrocarbon products
such as LNG/CNG, etc.)
Storage of petroleum,
>20 kL but
petrochemical or related ≥ 20,000 Total storage
None < 20,000 ≤20 kL
products (including kL capacity
kL
blending)
Refilling station >20 kL but
≥ 20,000 Total storage
projects/gasoline station None < 20,000 ≤20 kL
kL capacity
projects kL
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
≥ 10,000 MT
Metallic Mineral or ore > 200 MT but ≤ 200 MT Annual processing rate
≥ 70,000 MT but
processing < 10,000 MT annually (based on inputs)
< 70,000 MT
Regardless of Regardless of
production production
capacity if capacity if
involving the involving the
Precious/Noble Metal Refining Does not use
None use of ≥ 1.0 use of < 1.0
(including jewelry-making) chemicals
MT per year of MT per year of
substances substances
included in the included in the
PCL and CCO PCL and CCO
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
EIS EIS PD (Part I only)
Checklist
Non-metallic mineral
processing plants like
cement, other cement
products, clinker, limestone, ≥ 10,000 > 200 MT
≤ 200 MT
ceramic industries, ≥ 50,000 MT MT but < but < Annual production rate
annually
manufacture of glass and 50,000 MT 10,000 MT
Glass products,
Manufacture and
processing of calcium
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size parameters
Projects/Description Category /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
EIS EIS PD (Part I only)
Checklist
Those that
are mobile or
Batching and crushing Regardless
to be
plant; sand & gravel None None of size or
operated for
washing capacity
less than 1
year
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D
A:ECP Remarks
IEE
EIS EIS PD (Part I only)
Checklist
Annual volume of trees to
Community Based Forest
be cut for equal to or
Resources Utilization
more than 5,000 m3 -
(CBFRU); Integrated Forest
processing shall be done
Management Agreement
≥ 5,000 m3 at the EMB Regional
(IFMA) projects; Timber >100 m3 but
≥ 10,000 m3 but ≤ 100 m3 Office , however,
License Agreement (TLA); <5,000 m3
<10,000 m3 approval will be at EMB
Private land timber utilization
Central Office as per
(PLTU); Other Forestry
Memorandum from the
Projects; Forestry project co-
Secretary dated
managed with DENR;
December 13, 2006
Equivalent products per year
for more than 4,000 m3 -
> 4,000 m3 processing shall be done at the
>100 m3 but EMB Regional Office , however,
Wood Processing Projects ≥ 10,000 m3 but ≤ 100 m3 approval will be at EMB Central
≤ 4,000 m3
<10,000 m3 Office as per Memorandum from
the Secretary dated December
13, 2006
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size parameters
Projects/Description Category /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
EIS EIS PD (Part I only)
Checklist
>5
hectares
DAMS (including those but <
for irrigation, flood ≥ 25 25hectar
≤5 Reservoir
control, water hectares es OR
hectares flooded/inundated area
source and OR >5 None
AND ≤ 5 or/and water storage
hydropower ≥ 20 million million
million m3 capacity
projects)including m3 m3 but
run-of-river type < 20
million
m3
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC)
(may secure CNC)
≥ 1,000
Irrigation projects > 300 but <
None hectares ≤ 300 hectares Service area
(distribution system only) 1,000 hectares
(service area)
With water
source (e.g.
infiltration
gallery, etc.)
and water Levels III Level II / Level I
Water supply projects (without
dam)
None treatment (Distribution Water refilling
facilities system only) station
including
desalination,
reverse
osmosis (RO
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Total power generating
capacity
≥ 10 MW but > 1 MW but For projects with
< 50 MW OR <10 MW weir/dam/other
≤ 1 MW
Hydropower facilities ≥ 50 MW with tunneling AND impounding facility, refer
without tunneling
(regardless without to dam as additional
of capacity) tunneling criteria for multi-
component project
screening
Other Thermal Power Plants ≥ 10 MW but > 1 MW but Total power generating
≥ 30 MW ≤ 1 MW
(eg. coal, diesel, bunker, etc.) <30 MW <10 MW capacity
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
≥ 10 MW
> 1 MW but Total power generating
Power Barges ≥ 50 MW but <50 ≤ 1 MW
<10 MW capacity
MW
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
PROVINCIA
ALL TYPES
L ROAD and
NATIONAL OF ROADS:
OTHER
ROAD: > 2 km but
TYPES OF
≥ 20.0 km, < 20.0 km,
ROADS:
(length with no (length with
≥ 20.0 km,
Roads, new construction critical slope) no critical ≤2 km
(length with
OR slope) OR
no critical
≥ 10.0 km > 2 km but
slope) OR
(length with < 10.0 km
≥ 10.0 km
critical slope) (length with
(length with
critical slope)
critical slope)
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
> 50% increase
> 50% increase in capacity (or
in capacity (or in terms of
in terms of length/width)
length/width) AND ≤ 50% increase in
AND > 2 km but capacity (or in
Roads, widening, rehabilitation ≥ 20.0 km, < 20.0 km, terms of
None (length with no (length with no length/width) but ≤
and/or improvement
critical slope) critical slope) 2 km increase in
OR OR length
≥ 10.0 km > 2 km but <
(length with 10.0 km
critical slope) (length with
critical slope)
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
>50% ≤ 50%
≥ 50% increase in increase in
Bridges and viaducts increase in capacity (or capacity (or in
(including elevated roads), capacity (or in in terms of terms of
None
rehabilitation and/or terms of length/width) length/width)
improvement length/width) but <total but ≤ 2 km
OR ≥ 10 km length of 10 increase in
km length
All
All overpass
Pedestrian passages None None underpass
projects
projects
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Primary, Clinics
(out-patient,
Secondary, health centers, dental
Institutional and other
Tertiary clinics) including rural
structures with laboratory None None
hospitals or health units; X-ray
facilities clinic, diagnostic
Medical laboratory, assay
Facilities laboratory
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
(Commercial TSD
Sanitary Landfill for industrial
None Multi-users Single-user None facilities are considered
and other wastes
as “multi-user”)
Categories 2
to 4 Disposal Category 1
wastes handling per day
Sanitary landfill for domestic Facilities OR Disposal
None None (Categories based on
wastes only Category 1 Facility <15
DAO 2006-10)
with capacity tons
≥ 15 tons
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
PD (Part I
EIS EIS Checklis
only)
t
≥ 10.0 MT
Annual treatment/processing
Hazardous waste treatment, OR projects with < 10.0 MT
capacity
recycling, and/or disposal facilities radioactive (without
None None (for conversion of volume to
(for recycling of lead, see details in materials radioactive
mass: use 1 kg/L as the
Heavy Industries) (regardless of materials)
factor)
amount/quantity)
Other Projects that are considered Not covered:
• Telecommunication Projects (broadcasting towers,
monopole/guyed towers, three and four-legged self-
supporting towers and other similar structures)
Permitting Requirements:
Permitting Requirements:
1. Geo-tagged photo of proposed project site
2. Maps of impact/affected areas (showing at least 1 km from
the project boundaries
3. Certification from LGU proving the compatibility of
proposed project with existing land use
4. Site Development Plan/Vicinity Map signed by registered
professionals
5. Project /Plan Layout signed by registered professionals
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)
Permitting Requirements:
6. Schematic Diagram of WTF (if applicable)
7. Schematic Diagram of APCF (if applicable)
8. Organizational Chart in charge of environmental concern
9. Proof of authority over project site (land title, dead of sale,
lease contract, Memorandum of Agreement, etc.)
10. Duly accomplished Project Environmental Monitoring and
Audit Prioritization Scheme (PEMAPS) questionnaire
11. Payment of P 5,055.00
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)
Requirements:
1. Transmittal Letter address to the Regional Director
2. Notarized EIS/EPRMP with accountability Statement
3. Zoning Certification