PERMITTING REQUIREMENTS

OF PD 1586

“Philippine Environmental Impact


Statement (EIS) System”

(Automated Processing of ECC


Applications)
• Project Thresholds for
Coverage Screening and
Categorization
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)

Agriculture, Foodand
related Industries
Animal products
processing (fish/meat
processing, canning, >200 MT
≥ 2,500 Annual production
slaughterhouses, etc) None but < ≤ 200 MT
MT rate
including other marine 2,500 MT
products, crabmeat
etc.)
Food preservation
For canning, refer to
(e.g., drying, freezing) Regardless of
None None None other (applicable)
and similar methods capacity
categories
aside from canning
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
EIS EIS PD (Part I only)
Checklist

Agriculture, Foodand
related Industries

Regardless of
Ice plant/processing None None None
capacity

> 100 L but


≥ 10,000 L
< 10,000 L ≤ 100 L
(liquid) (liquid) (liquid)
Processing of dairy Monthly
None or or or
products ≥ 100 MT production rate
> 1 MT but ≤ 1 MT
(solid)
< 100 MT (solid)
(solid)
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D
A:ECP Remarks
IEE PD (Part I
EIS EIS
Checklist only)
Agriculture, Food and related Industries
Agricultural processing
> 5,000 MT
including rice, corn, ≥ 50,000
None but < ≤ 5,000 MT Annual production rate
vegetables, fruits and other MT
50,000 MT
agricultural products.
Other types of food (and >200 MT
other food by-products, ≥ 50,000 but Annual production
None ≤ 200 MT
additives, etc.) MT < 50,000 rate
processing industries MT
>200 MT
≥ 50,000 but Annual (rated)
Sugar Mills None ≤ 200 MT
MT < 50,000 production rate
MT
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D
A:ECP Remarks
IEE PD (Part I
EIS EIS
Checklist only)
Agriculture, Food and related Industries
> 1 ton/hr
or mill with
polishing
(regardless Hourly production
Rice/corn mill None None ≤ 1 ton/hr
of rate
production
rate if with
polishing)
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Livestock Animal
Industries
a) Livestock/piggery > 100 but <
≥ 5,000
Projects – (eg. None 5,000 ≤100 heads Stocking population
heads
pigs/goats) heads
≥ 1,000
< 1,000 ≤100 heads
b) Ostrich Farming None heads OR
heads AND ≤ 1 ha
≥ 1 ha
> 10,000
c)Livestock/poultry Projects ≥ 100,000 but ≤ 10,000
None Stocking population
– (eg.-birds) heads < 100,000 heads
heads
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Livestock Animal
Industries

≥ 50 Animal > 10 AU but


Other Livestock projects None ≤10 AU Stocking population
Unit (AU) <50 AU

AGRICULTURE INDUSTRY

>50
Agricultural plantation Aggregated by
≥ 500 hectares
(e.g. orchards, including None ≤50 hectares municipality – based
hectares but < 500
rubber plantation) on contracting party
hectares
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
AGRICULTURE
INDUSTRY
>200 MT
Animal feed mill None ≥ 2,500 MT but < 2,500 ≤ 200 MT Annual production rate
MT
Fishery Projects – Dikes for/and Fishpond Development Projects shall refer to natural or
Dikes For/And artificial water impoundment involving dike construction and harvesting
FishpondDevt Projects the same as marketable size and quantities.
Fishery/Aquaculture Projects
≥ 5 hectares > 1 hectare
using fresh or brackish water ≤ 1 ha OR Based on project area
≥25 hectares but <25 but < 5
including pearl farm and similar seaweed farming (e.g., title, lease contract)
hectares hectares
activities
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D
A:ECP Remarks
IEE PD (Part I
EIS EIS
Checklist only)
Commercial, [Business
centers with residential
units (mixed use), malls,
supermarkets, public > 1 hectare Total/gross floor area
markets] ≥ 5.0 but including parking,
None ≤ 1 hectare
• Fast food/Restaurant hectare <5.0 open space and other
Projects hectares areas
• Commercial
Establishments (i.e.
Showrooms
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)

Non-Ferrous
Metal Industries > 200 MT
>10,000
but Annual production
> 30,000 MT MT but < < 200 MT
<10,000 rate
30,000 MT
Iron & Steel Mills MT

≥ 10,000 MT
> 200 MT but <
Smelting Plant ≥ 15,000 MT but < 15,000 ≤ 200 MT annually Annual production rate
10,000 MT
MT
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)
Petroleum and Petrochemical Industries (This category includes hydrocarbon products
such as LNG/CNG, etc.)
Petrochemical or ≥ 10,000 > 200 MT
≤ 200 MT
petroleum-based ≥ 30,000 MT MT but < but <
annually
Annual production rate
projects 30,000 MT 10,000 MT
Recycling of oil and
≥ 5 MT but > 1 MT but
other petroleum-based ≥ 10 MT ≤ 1 MT Daily production rate
< 10 MT <5 MT
chemicals

LPG/LNG/CNG/similar
None ≥ 10 MT < 10 MT None Total storage capacity
product storage and refilling
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)
Petroleum and Petrochemical Industries (This category includes hydrocarbon products
such as LNG/CNG, etc.)

Storage of petroleum,
>20 kL but
petrochemical or related ≥ 20,000 Total storage
None < 20,000 ≤20 kL
products (including kL capacity
kL
blending)
Refilling station >20 kL but
≥ 20,000 Total storage
projects/gasoline station None < 20,000 ≤20 kL
kL capacity
projects kL
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)

Mining and Quarrying Projects


>20,000 MT
≤ 20,000
Coal mining ≥ 70,000 MT but <70,000 None Annual extraction rate
MT
MT
>20,000 MT
Annual extraction rate
≥ 100,000 MT but
≤20,000 MT or/and project area
OR <100,000
Extraction of metallic AND (material recovery
Area ≥ 25 ha MT None
ores/minerals (on shore) Area is <25 from TSF and similar
(regardless of AND
hectares facility are included in
capacity) Area is <25
this category)
hectares
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE PD (Part I
EIS EIS
Checklist only)

Mining and Quarrying Projects


Extraction of Non-metallic
Minerals such as
Dredging only
-Limestone
≥ 75,000 OR >20,000 MT (of river, bay &
/shale/silica/clay/placer and ≤20,000 MT
Area ≥20 but <75,000 other natural
other non-metal AND Annual extraction rate
hectares(rega MTAND water bodies
minerals/ores Area is <20 or/and project area
rdless of Area is <20 as
-Aggregates (sand, stone, hectares
capacity) hectares environmental
gravel including dredging enhancement)
with/intended for
recovery/use of materials)
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
EIS EIS PD (Part I only)
Checklist

Mineral Processing Projects

≥ 10,000 MT
Metallic Mineral or ore > 200 MT but ≤ 200 MT Annual processing rate
≥ 70,000 MT but
processing < 10,000 MT annually (based on inputs)
< 70,000 MT

Regardless of Regardless of
production production
capacity if capacity if
involving the involving the
Precious/Noble Metal Refining Does not use
None use of ≥ 1.0 use of < 1.0
(including jewelry-making) chemicals
MT per year of MT per year of
substances substances
included in the included in the
PCL and CCO PCL and CCO
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP

IEE
EIS EIS PD (Part I only)
Checklist

Mineral Processing Projects

Non-metallic mineral
processing plants like
cement, other cement
products, clinker, limestone, ≥ 10,000 > 200 MT
≤ 200 MT
ceramic industries, ≥ 50,000 MT MT but < but < Annual production rate
annually
manufacture of glass and 50,000 MT 10,000 MT
Glass products,
Manufacture and
processing of calcium
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size parameters
Projects/Description Category /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
EIS EIS PD (Part I only)
Checklist

Mineral Processing Projects

Natural stone (e.g., Annual production


None None >10,000 MT ≤10,000 MT
marble) processing plant rate

Those that
are mobile or
Batching and crushing Regardless
to be
plant; sand & gravel None None of size or
operated for
washing capacity
less than 1
year
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC) Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D
A:ECP Remarks
IEE
EIS EIS PD (Part I only)
Checklist
Annual volume of trees to
Community Based Forest
be cut for equal to or
Resources Utilization
more than 5,000 m3 -
(CBFRU); Integrated Forest
processing shall be done
Management Agreement
≥ 5,000 m3 at the EMB Regional
(IFMA) projects; Timber >100 m3 but
≥ 10,000 m3 but ≤ 100 m3 Office , however,
License Agreement (TLA); <5,000 m3
<10,000 m3 approval will be at EMB
Private land timber utilization
Central Office as per
(PLTU); Other Forestry
Memorandum from the
Projects; Forestry project co-
Secretary dated
managed with DENR;
December 13, 2006
Equivalent products per year
for more than 4,000 m3 -
> 4,000 m3 processing shall be done at the
>100 m3 but EMB Regional Office , however,
Wood Processing Projects ≥ 10,000 m3 but ≤ 100 m3 approval will be at EMB Central
≤ 4,000 m3
<10,000 m3 Office as per Memorandum from
the Secretary dated December
13, 2006
Project Thresholds for Coverage Screening and Categorization
Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size parameters
Projects/Description Category /
Category B: Non-ECP Category D Remarks
A:ECP
IEE
EIS EIS PD (Part I only)
Checklist

Dams, Water Supply and Flood Control Project

>5
hectares
DAMS (including those but <
for irrigation, flood ≥ 25 25hectar
≤5 Reservoir
control, water hectares es OR
hectares flooded/inundated area
source and OR >5 None
AND ≤ 5 or/and water storage
hydropower ≥ 20 million million
million m3 capacity
projects)including m3 m3 but
run-of-river type < 20
million
m3
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC)
(may secure CNC)

Project size parameters /


Projects/Description
Category A:ECP Category B: Non-ECP Category D Remarks

EIS EIS IEE Checklist PD (Part I only)

Dams, Water Supply and Flood Control Project

≥ 1,000
Irrigation projects > 300 but <
None hectares ≤ 300 hectares Service area
(distribution system only) 1,000 hectares
(service area)

With water
source (e.g.
infiltration
gallery, etc.)
and water Levels III Level II / Level I
Water supply projects (without
dam)
None treatment (Distribution Water refilling
facilities system only) station
including
desalination,
reverse
osmosis (RO
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)
Total power generating
capacity
≥ 10 MW but > 1 MW but For projects with
< 50 MW OR <10 MW weir/dam/other
≤ 1 MW
Hydropower facilities ≥ 50 MW with tunneling AND impounding facility, refer
without tunneling
(regardless without to dam as additional
of capacity) tunneling criteria for multi-
component project
screening

Other Thermal Power Plants ≥ 10 MW but > 1 MW but Total power generating
≥ 30 MW ≤ 1 MW
(eg. coal, diesel, bunker, etc.) <30 MW <10 MW capacity
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)

≥ 10 MW
> 1 MW but Total power generating
Power Barges ≥ 50 MW but <50 ≤ 1 MW
<10 MW capacity
MW

Waste-to-energy – power > 1 MW but Total power generating


None ≥ 50 MW ≤ 1 MW
projects < 50 MW capacity

Total power generating


Power transmission lines None None > 138 KV ≤ 138 KV
capacity
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)

Renewable energy projects


such as ocean, solar, wind,
> 5 but < Total power generating
tidal power except waste- None ≥ 100 MW ≤ 5 MW
100 MW capacity
to-energy and biogas
projects

Total power generating


Substation/switchyard None None > 220 KV ≤220 KV
capacity
Project Thresholds for Coverage Screening and Categorization
Not
covered
Covered (Required to secure
(may
ECC)
secure
Project size
CNC)
Projects/Description parameters /
Category Category B: Non- Remarks
Category D
A:ECP ECP
IEE PD (Part I
EIS EIS
Checklist only)
≥5
RECLAMATION and other hectares
<5 Area
land restoration ≥ 25 hectares but None
hectares reclaimed/restored
PROJECTS < 25
hectares
Roads – Regardless
flyover/cloverleaf/interchan None None of length None
ges and width
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)

PROVINCIA
ALL TYPES
L ROAD and
NATIONAL OF ROADS:
OTHER
ROAD: > 2 km but
TYPES OF
≥ 20.0 km, < 20.0 km,
ROADS:
(length with no (length with
≥ 20.0 km,
Roads, new construction critical slope) no critical ≤2 km
(length with
OR slope) OR
no critical
≥ 10.0 km > 2 km but
slope) OR
(length with < 10.0 km
≥ 10.0 km
critical slope) (length with
(length with
critical slope)
critical slope)
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)
> 50% increase
> 50% increase in capacity (or
in capacity (or in terms of
in terms of length/width)
length/width) AND ≤ 50% increase in
AND > 2 km but capacity (or in
Roads, widening, rehabilitation ≥ 20.0 km, < 20.0 km, terms of
None (length with no (length with no length/width) but ≤
and/or improvement
critical slope) critical slope) 2 km increase in
OR OR length
≥ 10.0 km > 2 km but <
(length with 10.0 km
critical slope) (length with
critical slope)
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)
>50% ≤ 50%
≥ 50% increase in increase in
Bridges and viaducts increase in capacity (or capacity (or in
(including elevated roads), capacity (or in in terms of terms of
None
rehabilitation and/or terms of length/width) length/width)
improvement length/width) but <total but ≤ 2 km
OR ≥ 10 km length of 10 increase in
km length
All
All overpass
Pedestrian passages None None underpass
projects
projects
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)
Primary, Clinics
(out-patient,
Secondary, health centers, dental
Institutional and other
Tertiary clinics) including rural
structures with laboratory None None
hospitals or health units; X-ray
facilities clinic, diagnostic
Medical laboratory, assay
Facilities laboratory

Subdivision and other > 1 hectare Based on project area


housing projects in areas None ≥ 5 hectare but <5 ≤ 1 hectare (e.g., title, lease
with critical slopes hectare contract)
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)

Subdivision and other > 1 hectare Based on project area


≥ 25
housing projects in flat None but <25 ≤ 1 hectare (e.g., title, lease
hectare
areas hectare contract)

Based on project area


Cemetery, memorial park > 5.0
None None ≤ 5.0 hectares (e.g., title, lease
and similar projects hectares
contract)
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description parameters /
Category
Category B: Non-ECP Category D Remarks
A:ECP

IEE PD (Part I
EIS EIS
Checklist only)

(Commercial TSD
Sanitary Landfill for industrial
None Multi-users Single-user None facilities are considered
and other wastes
as “multi-user”)

Categories 2
to 4 Disposal Category 1
wastes handling per day
Sanitary landfill for domestic Facilities OR Disposal
None None (Categories based on
wastes only Category 1 Facility <15
DAO 2006-10)
with capacity tons
≥ 15 tons
Project Thresholds for Coverage Screening and Categorization

Not covered
Covered (Required to secure ECC) (may secure
CNC)
Project size
Projects/Description Category parameters /
Category B: Non-ECP Category D Remarks
A:ECP

IEE
PD (Part I
EIS EIS Checklis
only)
t

Domestic wastewater > 30 m3


Based on system
treatment facility (including None ≥ 5,000 m3 but< ≤ 30 m3
capacity
septage treatment facility) 5,000 m3

≥ 10.0 MT
Annual treatment/processing
Hazardous waste treatment, OR projects with < 10.0 MT
capacity
recycling, and/or disposal facilities radioactive (without
None None (for conversion of volume to
(for recycling of lead, see details in materials radioactive
mass: use 1 kg/L as the
Heavy Industries) (regardless of materials)
factor)
amount/quantity)
Other Projects that are considered Not covered:
• Telecommunication Projects (broadcasting towers,
monopole/guyed towers, three and four-legged self-
supporting towers and other similar structures)

• Energy projects and non-commercial mineral and fossil


mining projects involving seismic survey, gravity survey,
geo-scientific, geophysical surveys, reconnaissance,
exploration, feasibility studies, piloting, core
drilling/sampling research and development activities
• (Must not involve significant earth moving activities or may
not pose significant ecological/vegetative disturbance)
Other Projects that are considered Not covered:
• Cottage Industries - manufacture of stuffed toys, handicraft,
souvenir items, decorative accessories, paper boxes, rope, twines,
throw pillow, etc., that do not generate toxic or hazardous materials
and/or strong/highly, pollutive wastes

• Service Industries - sector of economy that supplies the needs of


consumers but produces no tangible goods
(vehicle emission testing centers, containerized shipping
services, trucking, banks)

• Facilities for Barangay Micro-Business Enterprises (BMBE)


Projects - as defined by R.A. 9178 including similarly-scaled projects
with less than PhP 3.0 million capitalization involving only assembly
of components, molding, sculpturing, cutting, sewing, knitting,
weaving, briquetting and carpentry works
CERTIFICATE OF NON-COVERAGE (CNC)

EMB Memorandum Circular No. 2015-003


Implementation of Online Processing of Certificate
of Non-Coverage (CNC) Application

Permitting Requirements:

1. Site Development Plan and Vicinity Plan


2. Payment (Land Bank) P 1,126.00
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

EMB Memorandum Circular No. 2015-008

Implementation of Online Processing of Environmental


Compliance Certificate (ECC) Applications for
Category B projects requiring Initial Environmental
Examination (IEE) Checklist Report Forms under the
Philippine Environmental Impact Statement System
(PEISS)
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

Permitting Requirements:
1. Geo-tagged photo of proposed project site
2. Maps of impact/affected areas (showing at least 1 km from
the project boundaries
3. Certification from LGU proving the compatibility of
proposed project with existing land use
4. Site Development Plan/Vicinity Map signed by registered
professionals
5. Project /Plan Layout signed by registered professionals
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

Permitting Requirements:
6. Schematic Diagram of WTF (if applicable)
7. Schematic Diagram of APCF (if applicable)
8. Organizational Chart in charge of environmental concern
9. Proof of authority over project site (land title, dead of sale,
lease contract, Memorandum of Agreement, etc.)
10. Duly accomplished Project Environmental Monitoring and
Audit Prioritization Scheme (PEMAPS) questionnaire
11. Payment of P 5,055.00
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

ECC with Amendment and New (EIS) - Manual

Requirements:
1. Transmittal Letter address to the Regional Director
2. Notarized EIS/EPRMP with accountability Statement
3. Zoning Certification

4. Proof of Ownership/Authority over the project (Title, Lease


of Contract, Dead of Sale, SPA, MOA, etc., which ever is
applicable (Authenticated Copy)
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

ECC with Amendment and New (EIS) -Manual


Requirements:
5. Site Development Plan and Location Map/Vicinity Map
6. Original Colored Pictures of Site with Caption
7. Geographical Coordinates of all Lot Corners (preferred in
decimal forms
8. Notarized PEMAPS with accountability statement of the
project proponent
9. TIN of Proponent who signed the Accountability Statement
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

ECC with Amendment and New (EIS) -Manual


Requirements:
11. List of Facilities and Machineries with Production
Capacity, if applicable
12. Additional Specific requirement
13. Others

 Once requirements are complete, please submit one copy of the


application for procedural screening and geo-mapping
 Submit scanned copy in PDF format of the requirements and placed in
labeled CD
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

Additional Specific Requirements


Project Type Additional Specific Requirements

Resort and Other 1. Foreshore Lease Agreement (FLA) or duly


Tourism/Leisure Projects received application
2. Certificate of No Objection from LGU
regarding the establishment of structures
within the City/Municipal Waters

Earthfill Quarry and 1. Drainage Clearance from DPWH or CEO


Similar Projects 2. Sketch Map/Area Clearance from MGB
3. Certification from Dept. of Agriculture
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

Additional Specific Requirements


Project Type Additional Specific Requirements

Sand and Gravel 1. Sketch Map/Area Clearance from MGB


Extraction Project 2. Certification from NIA that no irrigation or
similar projects will be affected in the
proximity (Certified True Copy/Original)
3. Certification from DPWH that no government
infrastructure will be adversely affected
within one (1) kilometer from the project site
(Certified True Copy/Original)

Fishery/Aquaculture 1. LGU Ordinance Resolution declaring the


Projects area as a Mariculture Area
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

Additional Specific Requirements


Project Type Additional Specific Requirements

Mineral Processing Plant 1. Duly notarized and valid Ore Supply


Contract
2. Water Analysis of the surrounding water
body or deep well for baseline data
purposes, if any

Wood Processing Plant 1. Log Supply Contract


2. List of Machineries and its Lay-Out Plan
ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC)

Additional Specific Requirements


Project Type Additional Specific Requirements

Subdivision and Housing 1. Drainage System Lay-out Plan


Projects 2. Topographic Map
3. Geological Assessment / EGGAR Report
duly validated by MGB
4. Drainage Clearance (Certified True Copy)

Sanitary Landfill 1. Preliminary Geological Assessment


2. Leachate Pond (Category 2-4 only)
3. Monitoring Well to be installed at three (3)
sites (Upstream, Midstream and Downstream
4. Submission of Safe Closure and Rehab Plan
119.92.161.5/internal/
casehandler’s account:
christoffer.bawiin
119.92.161.5/internal/
casehandler’s account:
christoffer.bawiin
119.92.161.5/internal/
Supervisor’s account:
alnulfo.alvarez
www.emb.gov.ph/portal/eia/Home.aspx