Académique Documents
Professionnel Documents
Culture Documents
© 2011 HALLIBURTON. ALL RIGHTS RESERVED Document : ATAC-SP2-S1-2012 - Confidential HALLIBURTON use only.
AGENDA
Wellbore fill
Equipment problems due to sand fill
Sand erosion of downhole equipment
Sand accumulation on surface
Erosion of surface equipment
Production Loss
Casing / Liner Collapse
Sand Disposal
– Environmental Concerns
Facility downtime
Software (QuikLook)
Drilling (cores)
Logging
Testing (TCP/DST)
Erosion of Equipment
Acoustic Detectors
Sand Traps
Desanders
Experience in the area
Offset well production
data
Fluenta Acoustic Sand Detector
© 2011 HALLIBURTON. ALL RIGHTS RESERVED. 6
Document : ATAC-SP2-S1-2012 - Confidential HALLIBURTON use only.
Your expectations at the end of the week
– Resin-coated sand
Fluid Flow
Direction
In Situ Clay
Particles
Swelling
Clays
FLUID FLOW
DIRECTION
In Situ Clay
Particles
Migrating Clay
Particles
Filtration
– Cartridge Filters
– Plate and Frame
– Vertical Pressure Leaf
Frac Pack
•For low K zones, improve productions, bypass high/deep skins, sand control.
•High cost due multiple equipments, additives and logistics.
•Generally offshore and deep wells (>2000 mts)
Screen as secondary
sand control
Propped Fracture
Damaged or fluid invaded region
Proppant
Flow
Invaded
Gravel
Pack Sand
Cement
Casing Formation
Cumulative Percentage
needed to retain a formation 70
sand.
60
50
40
30
20
10 2.0 1.0 0.8 0.6 0.4 0.2 0.1 .08 .06 .04 .03
Sieve Opening, mm
Proppant Sampling
Samples Handling, Storage and Retention
Sieve Analysis of Proppant Samples
Average Particle Sphericity
Roundness
Proppant Crush Resistance
Density of Proppant Materials
WWS / Prepack /
PoroMax® / PetroGuard™
< 10 <3 <2
Mesh / PetroGuard™
Wrap
PoroMax / PetroGuard
< 10 <5 <5
Mesh
Cased/Open hole
Vertical/deviated/horizontal
Place Proppant to fill perforations tunnel and annular
with Screen
Use filtered brine compatible with reservoir and heavy oil
– Clay stabilizer
– Anti emulsion additives
– Additives for parafins/asphaltenes depositions
Use Filtered brine/RPM fluid as proppant carrier
– RPM (Relative Permeability Modifier), good viscosity, functions
as fluid loss additive during gravel packing NO damage (liquid
gel!!!!).
– HEC gum, minimum residual solid when broke
Natural Sand
– Shallow wells, low BHST/BHST
– Relative Sphericity And Roundness
– High Percent Fines
Man Made
– Ceramics
• Low density
• Excellent Sphericity And Roundness
• More expensive than others
– Sintered
• High BHST/BHSP
• Too heavy and expensive for gravel Pack
Open Hole