VoLTE Readiness Cincinnati Market

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 1
SINR improvement – Plan of action
• Divide market based on Localization Clusters. Overlayed on bad SINR agoop data.

• Cluster Prioritization:

 Identify bad SINR sectors along with SINR< 0 and # of sector less than 0
 Identify clusters with low CQI and high 1900 drop rate.
 Identify clusters with higher low CQI sector along with Over shooters.

• Optimization actions include:

 Hardware issue resolution, parameters changes and tilts, deployments.


 Perform market audits (X2, S1, Power , TM parameters) in the cluster/market level
 Identify the over shooters using TA (Timing advance) and perform the tilts accordingly.

• Keep track of PSO changes, New sites upgrades in the cluster and monitor the impact.

• High offenders analysis based on high CDR, over shooters, low CIQ based sectors.

• Volte parameters pre-check along with CSON

• Monitor for targeted improvement

• Expedite deployments for further improvement

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 2
CINCINNATI Clusters and Site Details
Cincinnati is distributed in 11 localization clusters as per bad SINR data.

90 days- Avg. SINR by sector 90 days- Avg. Low SINR Cluster Site Details

Clusters Count of Cascades


Cluster 1_Greenville 28
Cluster 2_Springfield 34
1 Cluster 3_DaytonDowntown 76
Cluster 4_Richmond 28
Cluster 5_ Hebron 42
Cluster 6_Sharonville 105
Cluster 7_Hamilton 57
2 Cluster 8_Cincinnati Downtown 89
4 Cluster 9_Florence 50
3 Cluster 10_Alexandria 16
Cluster 11_Hillsboro 21
7 Total 546

5 6
11
8 Market On-air status

Technology On Air Status


9 10 Category 1900 LTE 800 LTE 2500 LTE D1-Nokia MM
# Sites 431 415 190 115 46

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 3
Criteria To Select Cluster : Dayton Downtown
Selected Dayton Cluster

Technology On Air Status

Category 1900 LTE 800 LTE 2500 LTE D1-Nokia MM


# Sites 76 76 39 42 15

CIQ and CDR Avg Data: Used to prioritize the clusters

Average CQI Connection Drop%

Cluster Priority 800 1900 2500 800 1900 2500


Criteria for Cluster Selection Dayton Downtown 1 6.27 8.01 8.83 0.50 0.11 0.14
Sharonville 2 6.61 8.08 8.55 0.43 0.12 0.25
 Cluster has lowest CQI value in 1900 is at acceptable levels in this cluster Cincinnati Downtown 3 6.66 8.15 8.34 0.56 0.16 0.43

 CDR, SINR bad bin also taken into consideration for prioritization of clusters Hamilton 4 6.50 8.38 8.52 0.52 0.12 0.38
Hebron 5 7.50 8.82 9.33 0.42 0.14 0.15
 Top offenders identified based on Bad CQI, Carrier imbalance, CDR,RSSI, and HOSR .
Richmond 6 7.15 8.86 8.90 0.42 0.11 0.46
Florence 7 7.52 9.02 8.61 0.45 0.12 0.18
Alexandria 8 7.94 9.07 9.41 0.41 0.12 0.07
Hillsboro 9 7.69 9.29 9.81 0.42 0.11 0.11
SpringField 10 7.03 9.30 8.84 0.47 0.11 0.11
Greenville 11 7.75 9.54 10.11 0.51 0.12 0.16

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 4
Volte Pre-launch Check List : Market and Cluster Progress
OSS readiness GAP Analysis
Step 3 Ready to Launch (
Step 1 : Step 2: LTE Vs CDMA Coverage LTE vs CDMA Drop VoLTE Pre Check
Market Priority VoLTE GPL by date listed)
VoLTE Activation VoLTE Feature Gap Analysis % Analysis % ( completed Y/N)
Implementation Y/N
Activation
Cincinnati 3 Complete Complete Complete 81.68% 22.2% 10/1/2018 Nov-16

PDCCH LTE Drop


RF Baseline work GPL Compliance HO and RLF cSON feature Validation Tools
Utilization call

Inter
Priority One time Vendor Radio Link LTE traffic Top Offender Automatic Dynamic PCI Voice Fall-Back VoLTE KPI and Test Equipment
Atoll Database PCI and RSI TAC Key Pso alert GPL parameter
Cluster Low/
validation cleanup cleanup
ACP run
Implementation audit and Fix
Mobility Failure balancing Identification/ Neighbor Optimization Optimization Tools Availability Ready to Launch
Med/High (Tilt Opto) Optimizatio Optimization (TDD to FDD) Optimization Enhancement (DPO) (VFBO) availability
n

Complete
Cluster 1_Greenville Low Complete Complete 06/30 Complete 10/1 10/1 10/1 10/1 10/1 Complete Complete Complete 7/31 Complete Nov-16

Complete
Cluster 2_Springfield Low Complete Complete 06/30 Complete 10/1 10/1 10/1 10/1 10/1 Complete Complete Complete 7/31 Complete Nov-16

Cluster 3_DaytonDowntown High Complete Complete Complete 06/30 Complete 10/1 06/10 06/10 6/15 06/15 Complete Complete Complete 7/31 Complete Nov-16

Complete
Cluster 4_Richmond Medium Complete Complete 06/30 Complete 10/1 09/15 09/15 09/15 09/15 Complete Complete Complete 7/31 Complete Nov-16

Complete
Cluster 5_ Hebron Medium Complete Complete 06/30 Complete 10/1 08/30 08/30 08/30 08/30 Complete Complete Complete 7/31 Complete Nov-16

Cluster 6_Sharonville High Complete Complete Complete 06/30 Complete 10/1 06/30 06/30 06/30 06/30 Complete Complete Complete 7/31 Complete Nov-16

Cluster 7_Hamilton Medium Complete Complete Complete 06/30 Complete 10/1 08/20 08/20 08/20 08/20 Complete Complete Complete 7/31 Complete Nov-16

Cluster 8_Cincinnati Downtown High Complete Complete Complete 06/30 Complete 10/1 07/30 07/30 07/30 07/30 Complete Complete Complete 7/31 Complete Nov-16

Complete 06/30
Cluster 9_Florence Medium Complete Complete Complete 10/1 09/30 09/30 09/30 09/30 Complete Complete Complete 7/31 Complete Nov-16

Complete 06/30
Cluster 10_Alexandria Low Complete Complete Complete 10/1 10/1 10/1 10/1 10/1 Complete Complete Complete 7/31 Complete Nov-16

Complete 06/30
Cluster 11_Hillsboro Low Complete Complete Complete 10/1 10/1 10/1 10/1 10/1 Complete Complete Complete 7/31 Complete Nov-16

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 5
Volte Cluster Progress : Dayton Downtown
Cincinnati RF Baseline work GPL Compliance HO and RLF PDCCH Utilization LTE Drop call cSON feature Validation Tools
Priority Key Pso alert Inter Vendor LTE traffic Top Offender Automatic Dynamic PCI Voice Fall-Back Test Equipment
Atoll Database PCI and RSI TAC One time ACP GPL parameter Radio Link Failure VoLTE KPI and
Cluster Low/ Implementatio Mobility balancing Identification/ Neighbor Optimization Optimization Availability Ready to Launch
validation cleanup cleanup run (Tilt Opto) audit and Fix Optimization Tools availability
Med/High n Optimization (TDD to FDD) Optimization Enhancement (DPO) (VFBO)

Dayton Downtown 1 Complete Complete Complete 06/30 Complete Complete In Progress In Progress In Progress Done Done Done 7/31 Completed Nov 18

Accomplishments: Last Week Updates: Challenges:


 S1/X2 Ratio completed on cluster level (76 sites)
 Total 20 Cases analyzed- 8 carrier imbalance,7 low CQI,  Limitation on D1 Nokia RET changes(CI60XC709_A)
 RSSI audit.
2 RSSI, 2 1900 over shooters,1CDR issue.  Abnormal RET’s for 1900/800 (CI23XC232_Beta)
 TAC audit completed market level.
 New Audit for RSSI for all the band done, Identified 3 New Cells.  Long ticket resolution time for Airspan MM.
 Volte Releated PSO alart completed
(Ticket raised-1, Reset-2)  RSSI issues tickets closed with FSO visit
 Site upgrades for 16 sites, 3 New MM onair since Mar. 2018
 DPO issue due to Airspan Neighbors creates PCI confusion
 Total 54 Sector analyzed, Implementation done on 33 sectors

Sector Analyzed-Total 54 Action Summary


No Change-Rural area site 1
9, 1900 Overshoots
No Change-Good KPI's 14
No Change- New site planned 6
2, 1900 Too short MM Reset 5
Additional carrier Added 2
2.5 Reset 1
20, Low CQI 2, 2.5 Too Short
All Band RET 2
2.5 RET 11
1900/800 RET 5
1900/2500 RET 3
12, Carrier
5, HOSR imbalance 1900 RET 4
0 5 10 15
2, HIGH RSSI 3, CDR Additional carrier Added MM Reset No Action Required Reset RET Changes

Pre-Period Post-Period Delta


RRC Connection RRC Connection Connection DL MAC RRC Connection
Connection DL MAC Data Average Average Connection DL MAC Data Average
Element Band Connection Failure Connection Failure Drop Data Connection Failure
Drop Rate(%) Volume(MB) CQI CQI Drop Rate(%) Volume(MB) CQI
Requests Rate(%) Requests Rate(%) Rate(%) Volume(MB) Requests Rate(%)
Dayton_Localizati
1900 28584747.71 0.15 0.10 12720441.21 7.99 28297857.57 0.12 0.12 12800483.89 8.04 -286890.14 -0.03 0.02 80042.68 0.05
on-1900

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 6
Pre-Post : Cluster level KPI’s
Pre-Date Range: (02/24/2018-03/02/2018), Post-date Range: (06/04/2018-06/10/2018)
Dayton_Localization-1900 Dayton_Localization-2500 Dayton_Localization-800
KPI Pre-Period Post-Period Actual Pre-Period Post-Period Actual Pre-Period Post-Period Actual
Avg. Avg. Change Avg. Avg. Change Avg. Avg. Change
Average CQI 8.01 8.02 0.01 8.82 9 0.18 6.27 6.19 -0.08
Cluster Level Pre –Post RRC Connection Requests 29502129 25420326 -4081803 20628432 18949237 -1679195 8311127 9079646 768519
Connection Failure Rate(%) 0.15 0.12 -0.04 0.1 0.05 -0.05 1.09 0.47 -0.62
Connection Drop Rate(%) 0.11 0.12 0.01 0.14 0.14 0 0.5 0.58 0.08

Dayton Cluster CQI


10

Dayton_New_Volte-1900 Dayton_New_Volte-2500 Dayton_New_Volte-800

CIQ Improved for 2.5 and 1900 band, CFR improved for 1900 and 2.5 in cluster

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 7
Pre-Post : TA Improvement Example
Analysis:
 CI54XC091_Beta is overshooting upto 8.2 miles on 3rd tier. Casc_Sec KPI's Catagory BAND Pre Tilt Post Tilt IMP DATE
 Tilt increased on beta 1900 sector by 1 degree .
 Improvement seen in 1900 CDR, CQI however traffic reduced on 1900, increased on 800 CI54XC091_2 1900 Overshoots 1900 3 4 05/30/2018
 Further plan of optimization (800 Downtilt (78), Up tilt 2.5 ( 3-2))

1900 overshooting
is limited after the
CDR
3.5
Downtilt.
3
2.5
2
1.5
1
0.5
8.7 miles 0

800 1900 2500

1900 BAND 1900 2500 800 Delta


Casc_Sec Pre Tilt Post Tilt Implementation date KPI Pre Avg Post Avg Pre Avg Post Avg Pre Avg Post Avg 1900 2500 800
Connection Drop Rate(%) 0.56 0.28 0.22 0.22 2.04 1.58 -0.28 0.01 -0.46
CI54XC091 3 4 05/31/2018 Average CQI 6.41 6.78 8.97 8.74 5.1 5.35 0.37 -0.23 0.25
DL MAC Data Volume(MB) 14268.46 5341.05 29339.48 31259.76 4433.23 7034.54 -8927.41 1920.27 2601.31

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 8
Pre-Post : SINR Improvement on MM
Analysis: Average CQI
 UE relay is very unstable due to low SINR value.
 No dominant sector available on the MM location 10.00
 Identify the best PCI serve on the location and dominance improved by Uptilt. 8.00
6.00
4.00
2.00
0.00

6/2
5/22
5/15
5/16
5/17
5/18
5/19
5/20
5/21

5/23
5/24
5/25
5/26
5/27
5/28
5/29
5/30
5/31
6/1

6/3
6/4
6/5
6/6
Average CQI(CI60XC645-1900) Average CQI(CI60XC645-2500) Average CQI(CI60XC645-800)
No 2.5

Terrain
Challenge

2500 BAND 2500 1900 800


Implementatio
Casc_Sec Pre tilt Post Tilt n date KPI Pre Avg Post Avg Pre Avg Post Avg Pre Avg Post Avg
RRC Connection Requests 620287 662813 322690 297708 182123 184186
SINR improved from approx. 7.5 to15
CI60XC645_3 3 2 05/31/2018 Connection Drop Rate(%) 0.22 0.22 0.30 0.29 0.83 0.82
Average CQI 8.56 8.62 6.55 6.64 5.68 5.61

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 9
©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 10
Dayton Downtown- SINR Comparison
PRE SINR- last 90 days Post SINR- last 7 days

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 11
Site Upgrades and Implementations Details
ALL Upgrades: 9-800 2T4R , 7- 2.5, 3 MM since Mar. 2018

Count Cascade On-Air Date Remarks


1 CI24XC196 02/21/2018 800 2T4R upgrade
2 CI14XC285 03/09/2018 800 2T4R upgrade
3 CI03XC393 03/20/2018 800 2T4R upgrade
4 CI59XC648 03/29/2018 800 2T4R upgrade
5 CI03XC375 04/20/2018 800 2T4R upgrade
6 CI54XC844 04/30/2018 800 2T4R upgrade
7 CI98XC003 04/30/2018 800 2T4R upgrade
8 CI03XC318 05/11/2018 800 2T4R upgrade
9 CI60XC393 06/07/2018 800 2T4R upgrade
10 CI24XC196 03/05/2018 2500 Upgrade
11 CI14XC285 03/06/2018 2500 Upgrade
12 CI03XC393 03/29/2018 2500 Upgrade
13 CI98XC003 04/27/2018 2500 Upgrade
14 CI03XC375 04/30/2018 2500 Upgrade
15 CI54XC844 05/04/2018 2500 Upgrade
16 CI59XC648 05/18/2018 2500 Upgrade
17 CI90XSB16 03/18/2018 MM
18 CI90XS153 03/18/2018 MM
19 CI80XS870 04/18/2018 MM

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 12
Volte Cluster Progress : Dayton Downtown
PDCCH
Cincinnati RF Baseline work GPL Compliance HO and RLF Utilization LTE Drop call cSON feature Validation Tools

Key Pso
Priority Inter Vendor LTE traffic Top Offender Automatic Dynamic PCI Voice Fall-Back Test Equipment
Atoll Database PCI and RSI TAC One time ACP alert GPL parameter Radio Link Failure VoLTE KPI and
Cluster Low/ Mobility balancing Identification/ Neighbor Optimization Optimization Availability Ready to Launch
validation cleanup cleanup run (Tilt Opto) Implement audit and Fix Optimization Tools availability
Med/High Optimization (TDD to FDD) Optimization Enhancement (DPO) (VFBO)
ation

Dayton Work in Work in Work in Work in 5 sector 11 sectors 4 sectors


1 Yes Complete NA Done Done Done No No Nov 18
Downtown progress progress progress progress analyzed analyzed analyzed

Accomplishments Work in progress


 S1/X2 Ratio completed on cluster level (76 sites)  Analysis is in progress for 6 more sectors based on
 RSSI audit completed Reset Done for 1 sectors to fixed RSSI Issue.  Market wide analysis done to identfied high overhooters based on TA (Slide 9)
 TAC audit completed market level.  Volte Pre check audits (PLMN, S1 MME. DSCP, DRX, Volte parameters) (Slide 8)
 Volte Releated PSO alart completed  Site Upgrades (Total 16 upgrades so far in last 3 months) (Refer Slide 6 for more details)
 Connected Mode HO Disbled form Macro to MB to Improve HOSR ans SINR
 Implementation done on total 20 sector after analysis (11 Lte traffic balance, 5 top offenders/ Breakfix, 5
HOSR) (Refer Slide 6 for more details)

Implementations/Tracker Updates Challenges/Issue

• TAC cleanup completed (5/18) • Limitation on D1 Nokia RET changes/ Abnormal RET’s for 1900/800
• PSO alerts for Volte Complete (5/14) • Ground mount sites
• DPO activation completed (5/21) • On going Pending B4 Deployment.
• Implementation done on 10 sectors in last 2 weeks. • Ticket Resolution time for Airspan MM to Fix
• Interference issue on MM and watch TV interference

©2017 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials
intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is prohibited without authorization. 13
Thank You!

©2015 Sprint. This information is subject to Sprint policies regarding use and is the property of Sprint and/or its relevant affiliates and may contain restricted, confidential or privileged materials intended for the sole use of the intended recipient. Any review, use, distribution or disclosure is
prohibited without authorization.