SOFTWARE APPLICATION ASSIGNMENT

Daphne Tan Li Wen 0329055


Foo Van Jean 0330017
Karen Lim Shi Chee 0329431
Lau Wan Yee 0328947
Lim Yin Ru 0329931
Loh Wei Ting 0328314

Lecturer : Sr. Yeap Soon Kiat


An Australian company that develops and markets computer software
for the building and construction industry.

It’s specialised in estimating softwares designed to help ;-

Builders Estimators Contractor and subcontractors Tradespeople


Among the variety of products developed by Buildsoft:

Cubit MudShark Global Bartender


-Estimate smarter and take off -Let Mudshark do the heavy -Shaping the way you estimate. -Subcontractor Comparison
faster lifting.

All of the products are designed for the construction industry.

These products are generally used for residential, commercial and the infrastructure purposes.
Function

Smooth integration 3D perspective

This software can display both the quantities from User can see elements of takeoff from any angle in 3D,
drawing and data in estimates to check without and use this as a cross-referencing tool to make sure
needing to switch window. you don’t miss taking off any items, or to check all
your openings.
Users can achieve greater control and accuracy as well
as save time. Cubit allows the user to trace directly over the
imported plans which can be in PDF, CAD (DWG, DXF),
BIM (DWFx) or image file form
Function

flexibility and control over your estimates 3D Modeling

The estimate sheet is very flexible and easy to adjust. Templates are also useful to compile the company’s
common trades required in a project to save time in
Users are able to link information from any cell, range future estimates.
of cells or rows into the estimate.
Price list templates can be created to suit the needs of
User can even reference another job or price list. the user by sorting the list either by state, region or
There's so many ways you can use referencing to your trades.
advantage.
The software is able to automatically update the
existing estimate in accordance to the most recent
template price lists.
Function

Ease of modification

Variations can be easily handled with Cubit as any new drawings can be overlaid onto the
existing plan with the quantities.

The difference between both the drawings will be highlighted by a different colour allowing all
revisions made to the previous drawing to be easily viewed.

Quantities can be edited directly on the plan.

Any updates will be automatically linked to the estimate.


Limitation
Difficult to recover deleted data from Typing errors
history

Buildsoft does not offer the feature to recover Typing errors Cubit does not identify typing
previous data after amendments have been made. errors for figures which have been input
manually.
Hence, although the variation process is simple, it is
difficult to pull up previous versions for reference. These errors can only be picked up manually

This is important when preparing variation orders or


final accounts as we would also require old
information include in the reports.
Limitation

Virus Attack

The software can detect the virus attack and quarantined or killed the virus and also protect
the computer and system.

The problem is when no anti-virus was installed, the virus can attack the computer system
and also all the content of the computer.

If this happen, the data may be lost and may be cannot be covered by any means.
Function
Key in data of materials & labour, load drawings.

Live link enabled for Rates Library.

Generally it allows building product and cost database, bid management.

Taking off quantities from the drawing plan.

Drag and drop measurement / rates into workbook to create Bill of Quantities.
Function (Workbook)
Customized report & generating bill of quantities

• High quality of presentation of documents.


• Unlike Excel, Cost X does not hide large
numbers-text when printing.
• Filtering I & O automatically.
• Save time in keying in the item code.

Phraseologies in library

• Maintain standard phrase / model description in


hierarchical library.
• Assembled predefined phrases, codes and units.
Function (Workbook)

Working simultaneously Colour coded features

• Allows multiple users to work on • a streamlined review process


the same estimate / BQ at once. • green = quote, blue = estimate,
purple = plug, and orange = other.
Function
FEATURES OF 2D & 3D
• Ability to work with BIM, automatically extract quantities from the 3D model.

• User friendliness of interface as compared to other BIM compatible features.

• Good visibility for other users to review work.

Markups can be shared with construction team Easy overlay drawings and highlight changes.
Function

Revision capabilities Ease of visualization

• Walk through of building


• Automatically detect quantifying revision and • Clearer section and part details
model changes.

• When the drawing changes, it links back to the


CAD and BIM data.

• As it ties data into workbooks.

• The quantities in workbook will be updated


instantly.
Function

Subcontractor comparison

• The trades are compared through generating a


workbook with data of subcontractor details
stored.

• Whenever comparison is required, the details


are easily accessible.
Limitation

Lack of detailing in models

• Not everything is modelled, architraves, glazing beads, gaskets, etc.

• For roof, the software still uses 2D details, there is no flashing shown.

• Largely depends on the source of model, either from a designer version without details or detailed
model from the fabricator or manufacturer (structural steel modeler contains number of bolts).
Limitation

Difficult in terms used Less efficient in batch drawing

• Different way of defining or interpretation -


length, base length, etc. For instance, gross • Unable to handle drawings n batches
area includes or excludes void.
• Requires loading one by one when editing
• Required to understand the term used in drawing properties.
different application.
Cubicost Takeoff for Cubicost Takeoff
Architecture and for Rebar (TRB)
Structure (TAS)

Cubicost Takeoff for


Mechanical and
Electrical (TME) Cubicost TBQ
Functions
Rapid modelling

1. editing of BIM models


2. supports the import and
exports of file formats to build
3D models efficiently.
3. operates to calculate the
quantities of architectural and
structural elements
4. It has various elements and
comprehensive features
embedded in the software.
Functions
Automatic calculation

1. built-in localized calculation rules such


as SMM series
2. automatically deduct quantities among
elements to ensure accuracy of
calculation.
3. 3D models can be combined, identified,
resolved and generated automatically in
TAS.
Functions
Automatic calculation

1. built-in localized calculation rules such


as SMM series
2. automatically deduct quantities among
elements to ensure accuracy of
calculation.
3. 3D models can be combined, identified,
resolved and generated automatically in
TAS.
Functions
Automatic calculation

1. built-in localized calculation rules such


as SMM series
2. automatically deduct quantities among
elements to ensure accuracy of
calculation.
3. 3D models can be combined, identified,
resolved and generated automatically in
TAS.
Functions
Automatic calculation

Calculation of finishes can be


easily done by attaching the
finishes elements to the room
elements and then placing the
room to the corresponding model.
Functions
Convenient model sharing and transfer

1. Users are able to share data


between TAS, TRB and TBQ in
terms of models, quantities,
prices, etc to efficiently generate
tender documents.
2. Cubicost TBQ can be linked with
TAS and TRB file to enable
automatic updates in quantities
measured.

This encourages team collaboration in a


project especially in cases where members
are measuring different elements on the
same project.
Functions
Error checking

1. allows quantities to be viewed


in total or by element, floor.
2. allows a specific quantity in
the report to be located to the
corresponding element in 3D
model via the Reversely Check
feature.

This allows for quick checks to


determine if there are any
outstanding items to takeoff.
Functions
Ease of modification

1. provides a variation
order module specially
developed to handle the
management of variation
orders.
2. allows direct
modification of specific
elements to
accommodate variations
throu model information
and re-performing
calculations for certain
elements.
Functions
Ease of modification

1. provides a variation
order module specially
developed to handle the
management of variation
orders.
2. allows direct
modification of specific
elements to
accommodate variations
- by only adjusting model
information and re-
performing calculations
for certain elements.
Limitations
Performance issues Cubicost requires a computer hardware with high
performance as it uses a lot of the computer’s RAM (Random
Access Memory) to run the software especially if it is required
to open a large file.

Without it, the performance of the software would ultimately


slow down which causes inefficiency in taking off quantities.

Hence, users with old computer hardwares are obliged to


upgrade their computers with additional RAM to work with
the amount of information in the file.
Limitations
Learning curve

Cubicost softwares are embedded with numerous functions


which, unfortunately, demands users to devote time and
money to familiarise themselves as well as to master these
functions.

It has a relatively complicated user interface which makes it


time-consuming to pick up and become proficient especially
without professional advise and training.
Examples
Function

Material Takeoff Customisable schedules

Revit allows users to find out the quantities and cost Users can determine exactly which information is
of the materials. required to be in the schedule.

The material takeoff function performs the taking off The schedule generated can be sorted by material,
process by generating the quantity of each thereby, creating a total for the cost which can then
component made with different materials. be exported to Microsoft Excel.

Schedule Of Material Elements And Material Cost For Material


Takeoff
Function

Create calculated fields from the model 3D Modeling

Revit allows users to calculate quantities required for Enables designers and drafters to easily identify the
the preparation of the bills of quantities. clashes and areas of congestion, and resolve them
For example: if the number of stiffeners is required early in the process.

The software would generate and include calculated It results in error-free and high quality construction
value into the schedule. documentations.
Function

Collaborative functions Multi-Talented

Unlike AutoCAD, Revit allows all project data to be The program can be used to facilitate
stored in a single project file, permitting -design
multiple users to work on the same project file and -construction
merge their changes with every save. -procurement
-pricing
-life safety
All changes in Revit are coordinated across the entire -ongoing maintenance
project, so a change in one place is a simultaneous -facility management
change in all views.
Limitation

Difficulty in doing variations Large memory required

As this software is essentially a design software The software requires a large memory to fully install
developed for architects and engineers, it does not it into computer.
provide auto-revisioning functions.

In the event the design is changed, the user would The software is about 5GB which is quite large for a
have to re-generate all the quantities from design software.
scratch.
Comparative analysis of Manual
Measurement, CAD
Measurement and BIM
Preparation/Briefing Stage
Benefits
Manual Measurement CAD Measurement BIM

No yearly subscriptions Data storing and accessibility Ultimate collaboration

• No software costs or operator training • No large cabinets needed to store rolls • BIM’s cloud functionality ensures a
are required of drafting papers and blueprint as smoother start off when working
• It is the cheapest way to take everything including the measurements collaboratively
measurement (printing cost) can be created and saved in soft copy • During briefing, all parties share the
formats. (USB drive, server or cloud) same design, cost and scheduling
• can be accessed from anywhere with information at the same time, which will
No training required internet connection. be updated regularly.

• Firms that operate with manual Template and database creation Communication
measurement do not require expensive/
special training for staff to operate the • Users can create various CAD templates • Increase communication and
software. with basic details that can be reused understanding with potential
anytime. stakeholders as it allows sharing and
• Help to save time by providing basic updating information in real time.
information • Digital mock-ups can be created to give
• Drawings and measurement that potential stakeholders a clear picture of
created manually can only be stored a building’s appearance
locally
Preparation/Briefing Stage
Benefits

BIM

Faster decision making process

• Easier and faster to make decision as


team members are able to visualize the
project with most updated information
Preparation/Briefing Stage
Constraints
Manual Measurement CAD Measurement BIM

Lack of security Higher start-up cost Training and software cost

• Paper document for manual • More expenses required to invest in • A large initial investment is required for
measurement can be less secured than computer hardware for maximum updating software, hardware and the
electronic system performance training of staff.
• This is because misplaced documents • If a company wants to invest in CAD • Need time to adapt implementation of
can easily be placed in the wrong hands software throughout the company, it new technologies in term of changing in
• Meaning there is risk of exposing private could end up with high cost in computer workflow and work process
and confidential material. upgrades.

Incompatibility with partners


Time and cost of training staff
• BIM has yet to be universally used
• Training for operating the CAD software among construction professionals.
may require several days to weeks • Models can’t be shared across all
• Some courses may require extra fees consultants if some have not adopted
BIM application
Design Stage
Benefits
Manual Measurement CAD Measurement BIM

Avoid deviations between measured Accuracy Better representation and


quantities and actual value visualization of architect’s design
• Different tools and methods available to
• A beginner would not understand how eliminate human errors to obtain exact • BIM provides a 3D virtual model that
quantities are being measured in the dimensions enables clients to visually understand
software. • Highly accurate design and drawings how a building will be constructed
• Exp: deduction of openings for finishes. with precise measurement. • Thus, clients may ‘virtually’ walk around
If small values accumulates during their building to confirm that the project
design stage, tender quantities will be Increase the productivity of the design requirements are met.
inaccurate designers
• So, prices might deviate very far from
the actual value and thus would affect • Designers able to visualize the final
the tender later. product that is to be made.
• Given animation and see how the actual
product will work
• Thus helping the designers to
immediately make the modification if
required
Design Stage
Benefits

CAD Measurement BIM

Improve the quality of design Fewer reworks

• Higher accuracy will lead to better • Can identify potential problems in


designs and measurements design and fix them before the error is
• Helps carrying out manufacturing faster committed in the physical world.
and reducing the wastages that could
have occurred because of faulty designs • Thus, faults and reworking efforts will
and measurements. reduce thus shortening the time spent.
Design Stage
Constraints
Manual Measurement CAD Measurement BIM

Prone to damage and being Experiencing loss of information Lack of experts


misplaced
• Information such as measurement can • Limited numbers of experts working in
• Printed papers bear the risk of being be instantly lost or corrupted if a this field when compared to CAD
damaged, lost, or misplaced computer problems (power cuts or • To overcome this barrier, additional
• It will takes a lot of effort for getting the viruses) occurs as there are no auto investment in training and education
information back. back-up system such as training programs and
• Most common reason for corruption is workshops are being arranged
Difficulty in looking for software crashes while saving data to a
information when needed file.
Size and complexity of BIM
• It is hard to trace for information Inability to prepare Bills of
manually Quantities • The large size of BIM files will require
• if too many drawings are left different means of data sharing.
unorganised, it would waste time in • Unlike BIM software, CAD is just a tool • Real time access to the database from
searching the information from there which helps in measuring the quantity distant firms may require large and high
especially if one is retrieving information only but does not have the function of speed broadband internet access,
from old projects. preparing BQ available at all time.
• Thus, data must be transferred to
another software / manually to continue
preparing the BQ for the project.
Pre-Construction Stage
Benefits
Manual Measurement CAD Measurement BIM

Costing, evaluating,
Allows architect to draw Easier visualisation of the
valuing and varying
accurately upcoming project
building works becomes
easier • Possess features like object snaps • Modelling process allows easier
• Quantities measured are pre- with polar tracking or specifying visualisation and will ease the
determined and are produced in a exact coordinates communication process between
consistent manner which is familiar consultants and client
to the construction industry Flexible To Organize
Drawing Information Detects clashes and
Does not require any constructibility issues
software application to • Drawings can be edited without
do taking off elements erasing and redrawing • BIM 3D Models highlight temporary
work requirements, constructibility
• Users only require basic knowledge • Drafting methods that use rulers, issues and potential clashes
in measurement and only incurred squares and compasses is provided
printing charges • Provides site investigation
• Layers can be displayed, edited, and information in a standards format
printed separately
Pre-Construction Stage
Benefits
BIM
CAD Measurement

Creating database for Common Data


manufacturing Environment
• When creating the data for the • Ensures all development information
documentation of the designing, is linked during pre-award stage and
most of the data for manufacturing is accessible through one common
created respiratory
Produce reliable and
Enable checking tool paths accurate cost estimates
before construction
• Able to verify the complete
starts
machining process in a virtual
environment • Estimators are able to identify the
relationships between quantities,
• CAD simulations are also useful for costs and locations
scheduling, planning, material supply
and delivery • Help to differentiate the areas and
components of the building that
contribute to the total cost of the
project
Pre-Construction Stage
Constraints
Manual Measurement CAD Measurement BIM

Time consuming Lost of work due to Model content may not be


computer breakdown totally correct
• Requesting unclear information from
consultant and manual taking off • Information and work done can be • BIM modelling content may contain
quantities by using scale ruler and instantly lost or be corrupted by error as information obtained from
calculator may be time consuming viruses if a computer problem occurs different resources resulting lots of
and there are no back ups problem occur
Lack of sufficient
• Works are also in the risk of being
knowledge and stolen or ‘hacked’
understanding of
construction technology
by younger generation
• Some students might rely more on
computers and expect to engage
with their studies using computer
systems
Construction Stage
Benefits
Manual Measurement CAD Measurement BIM

Facilitate the approval of Established drafting


progress payment by the Site Coordination
standards
client
• Conformity to company standards • 3D or 4D of site coordination models
• Any progress payment can be can be ensured by creating styles for are useful for the contractors in
supported by picture in hard copy text, dimensions, and line types that planning for the site logistics,
can apply consistently develop traffic layouts and identify
potential hazards at the site
• Using drawing templates will help in
quickly start the new drawings that
conform to standards Serves as a coordination
tool to optimise the
Code reuse collaboration among
project team
• BIM model can be used to deliver
• Removes problems of duplication of updates from the project team to the
labour as the architects can copy contractor
different parts of code and design (E.g. refinements to the site levels for site
which can then be reused multiple drainage and plant species substitutions)
times
Construction Stage
Benefits
CAD Measurement BIM

Provides contractors with


Better Communication full control of material
quantities in a project
• Better and standardised drawings
can be made easily resulting in better • Contractors are able to instantly
documentation of the design, fewer generate precise quantity take-offs
drawing errors, and greater legibility from a completed model for building
materials that tend to encounter
greater deviations from quantity
estimates or can potentially have
greater impacts on the budget
(E.g. concrete or reinforcing bars)
Construction Stage
Constraints
Manual Measurement CAD Measurement BIM

Limitations of Incompatibility with


Human error partners
measurements
• For instance, it is possible that the
• QS could only measure 2D outlines subcontractors did not use BIM and
• Chance of errors is high due to high like lengths or areas only based on do not know how to access and
workload of manual taking off 2D drawings, but could measure the extract the information from the
workload volume out on 3D drawings model

• Missing element may be unavoidable Requires understanding


upon vast quantities of Much larger file sizes
as too much elements needed to
take into account by a measurer • Design,data
engineering, manufacturing,
than traditional CAD
and maintenance processes have systems
routinely existed in virtual isolation • More larger and complex files which
from one another require higher performing computer
hardware to operate
• Part of the scope challenge relates to
data, especially as products become
complex.
Post-Construction Stage
Benefits
Manual Measurement CAD Measurement BIM

Easy saving and Ensures the seamless


Easy reference transportation of data
sharing
to facility owners

• A well signposted set of dimensions • All the designs and drawings created • Managers can have access to
saves time and money in the event can be easily saved and preserved for essential data about each nook and
that the take-off has to be referred future use and reference. cranny of a facility with the space
to, (E.g. where the final account has information available in a high level
to be adjusted as a result of • Saved drawings can be edited and of detail (LOD) BIM model
variations) printed whenever required. Some
components from the drawing can • Eliminates the potential for any
also be standardized for future uses. discrepancies resulting from a
change of plans while the facility was
• Unlike the manual drafting, the CAD being built
drawings require less space and can
be stored in hard drive, USB pen
drive or cloud and can be shared
easily
Post-Construction Stage
Constraints
Manual Measurement CAD Measurement BIM

Large amount of Requires yearly Contractual changes


disorganised files to deal subscriptions or on economic
with training incentives and
ownership of
information
• All the documents need to be • CAD systems may involve software • The correct way of dividing the
organised and categorised for ease update costs or operator training economic benefits gained by BIM
of future reference as there might be implementation should be
waste of calculations or unclear • Yearly subscriptions for the CAD determined between project
drawings software, operating systems and participants to avoid any financial
other supporting software disputes
applications are required