November 1, 2012
Ronald LaPlante, S.E.
Division of State Architect – State of California
New SEAOC PV Committee Reports
Parking Garages
Flat Roofs
Sloped Roofs
What about
other
installations?
ICC AC 428
Open Buildings (ASCE 7-05 Figure 6-18,19)
SEAOC Solar Photovoltaic Systems Committee
Which Wind Loading Provisions Apply?
Parking Garages
Flat Roofs – not flush mounted
What’s an
appropriate wind
tunnel study?
Interpolate
Performance objectives
Building SFRS
Attached arrays
Unattached arrays
Seismic displacement
Prescriptive
displacement
Friction testing
NLRH analysis or
shake-table testing
SEAOC Solar Photovoltaic Systems Committee
Performance Objective
60
relative to roof
50
0.67m
40
≤ 6 inches
30
20 m
10
0
0.25 0.5 0.75 1 1.25 1.5
SDS (g)
Option A
Spectrally matched roof
motions
Per ICC AC 156 with
additional requirements;
include motions with T >
0.77 seconds, taken
proportional to 1/T.
Option B
Apply ground motions to a
building model and extract roof
motions
Recommended to bracket the
assumed properties of the
building model.
Vertical motion to be
included
Minimum filtering of
motions
If motions are high-pass
filtered, supplemental
analysis required.
2D tests require 3D
supplemental analysis.
Next Slide
THANK YOU
ron.laplante@dgs.ca.gov