Basic Piping Design Class (PI&II)


This class focuses on the detail
design required to produce piping
plans and isometrics while
conforming to project
requirements.
The graduate of this class will be
ready to advance on to phase II
which will require optimeyes
training and then Intergraph
PDS design. 2
Training Outline Overview
I. Introduction V. Isometrics
A. Process Piping Design A. Iso Callouts & Dimensioning
B. Orthographic Review B. Pipe Support Details
C. Pipe C. Sketches (Mat’l/Stress)
II. Piping Components D. Stress Considerations
A. Buttweld Fittings VI. Sources of Information
B. Screwed & SW Fittings VII. Introduction to Piping Plans
C. Flanges A. Piping Plans
D. Bolts & Gaskets B. Plot Plans & Transpositions
E. Valves C. Indexes, Schedule, ICR
F. Review D. Support Group Dwg’s.
III. Job Information E. Pipeway Drawings
A. Piping Specifications VII. Equipment Studies
B. Intro to Equipment A. Horizontal Vessel
C. Flow Diagrams, Line List B. Pumps
IV. Instruments: C. Vertical Vessel
Flow, Level, Pressure, Temp. D. Exchangers
XI. Review
3
XII. Final
What is Piping Design?
Piping Design is the physical
arrangement of equipment,
piping and instruments that
provides for process
requirements, operations,
maintenance, safety, and
construction, accessibility and
feasibility. It must be consistent
with state and local codes, the
budget and schedule.

4
5
PROCESS PLANT DESIGN

6
PIPERACK DESIGN

7
8
PIPING PLANS

9
PLOT PLANS

10
11
12
FABRICATION ISO’S
(REF: PRACTICE 670.250.2086)

13
FABRICATION ISO’S
(REF: PRACTICE 670.250.2093)

14
FABRICATION ISO’S
PDS GENERATED

15
ISO ISSUE CURVE
Large Bore
300
ISO’S ARE
DRAWN &
250 ISSUED BY
A SET
200
SCHEDULE

150

100

Large Bore Plan ISO


50
Large Bore Actual ISO

0
16
PDS MODELING

17
18
DESIGN CONSIDERATION
FOR ROUTING OF PIPE
• Materials of Construction (Metallurgy
Review)
• Specification
– Flange Rating, Pipe Wall Thickness,
Gasket Types, Types of Valves.
• Stress Considerations
– Temperature, Adequate Supports,
(Attachments) What Forces Are Imposed
on Attached Equipment?
• Fabrication Considerations
• Shop Fabrication
Continue...
19
… Continuation

DESIGN CONSIDERATION
FOR ROUTING OF PIPE
• Field Fabrication
• Constructability
• Process Objectives
– Pressure Drop Problems Caused by
Elbows, Valves, Vertical Runs, Etc.
• Operation and Maintenance
• Instrumentation/electrical
• Schedule and Budget
• Safety Requirements (OSHA)
• Environmental
20
PIPING ARRANGEMENT

21
SECTION VIEW
RESPONSIBILITES OF THE
PIPING DESIGNER
THE PIPING DESIGNER
INITIATES WORK FOR:
1. STRUCTURAL
2. VESSELS
3. ELECTRICAL
4. STRESS
5. PIPE MATERIAL

FINAL ERECTION
•DETAIL DRAWING
(PLACEMENT)
•ISOMETRIC DRAWING
(CONFIGURATION &
ERECTION NOTES)
START •FABRICATED PIPE ISOS. 22
23
PIPING ENGINEERING/DESIGN WORKSHARE ORGANIZATION
HOUSTON MANILA
PIPING DIRECTOR
DON GRISER

LEAD PIPING CO-ORDINATOR


ENGINEER
MIKE MURPHY

LEAD LEAD
MATERIA MATERIAL LEAD DESIGN LEADS PIPING
L CONTROL ENGINEER STRESS LEAD
Engineer

Lead Lead stress Design Lead


DAS DAS Material ENGINEER supervisor Checker
Control

Area Lead Area Lead AREA LEAD AREA LEAD AREA LEAD Area Lead Area Area Area Lead
WBS WBS WBS Area Lead WBS Lead Lead WBS
WBS WBS
WBS WBS WBS

24
Designers are assigned to work with an Area Lead
25
PREREQUISITES

26
FRONT END ACTIVITIES

27
PLOT PLAN DEVELOPMENT

28
ESTIMATING & PURCHASING ACTIVITIES

29
ENGINEERING ACTIVITIES

30
LAYOUT & DEVELOPMENT

31
DETAILED ENGINEERING

32
33
PIPING ORG CHART

Project Support Thermal and Piping Material Material Training Plant Design
Seismic Load Specs Takeoff
Analysis
Wall Thk and
Project Lead Piping Code Compliance Components Bid Estimating Plans /
Engineers Design Documents Resources Isometrics
Calculations and
Insulation Procurement
Proposal and Estimate Piping Loads on Coatings, and Requisitions Design
Coordination Structures and Refractories Status Training
Liaison Between Equipment Welding and Monitoring
Department and Training NDE and Control Staffing
Project Management Estimating
Code Compliance
Engineering Metallurgy and Process
Design and Corrosion Training Graphics
Procurement of Line List Liaison - P&ID
Engineered Engineered Items Home Office / Drafting
Supports Snubbers (Specialty Items) Field Computer
Spring Hangers Training Staffing Applications
Staffing Coordinators
Estimating 34
Staffing

Vous aimerez peut-être aussi