What is Hazard?
- Protection of personnel
- Layout Review;
- Hazard Identification (HAZID) Study;
- Hazard and Operability Review (HAZOP);
- SIL Study;
- Quantitative Risk Assessment (QRA) ;
- Flare Radiation and Dispersion.
HAZARD
GUIDE WORD IS IT POSSIBLE
IS IT LIKELY ?
NO YES
BRAINSTORM
THREATS & CAUSES
ASSESS
CONTROLS
WHAT BARRIERS OR CONTROLS
ARE REQUIRED TO PREVENT OR
CONTROL THE EFFECT?
The HAZID
Process
Sl.
HAZARD CAUSES CONSEQUENCES MITIGATION METHODS / SAFEGUARDS ACTIONS ACTION BY
No.
Typical Layout Vulnerability –Vehicle Potential for equipment Bollard protection for road side 15 To be reviewed and verified during 3-D model review. Piping
Hazards Impacts damage and consequential Hydrants/monitors
hazard arising from impacts 16 Vehicle access movements to be reviewed and verified for Construction/Civil
during maintenance work etc. Vehicle access movements reviewed adequacy
during layout review and verified for
adequacy
Typical Layout Effects of flare radiation Impact on personnel and Flare radiation study 17 Flare radiation study to be developed HSE
Hazards equipment.
PPE
HPC Procedures
Fire & Explosion Fire protection and Potential for leading Fire an gas Alarm system 25 Ensure minimum 2 diverse escape paths from each location in HSE
Hazards response personnel into fire or the process area.
flammable cloud Escape routes
Environmental Waste disposal options Liquid and solid wastes during 40 Emission and waste inventory to be reported HSE /HPC
operations within the Syrian regulatory
limits. 41 HPC to develop waste management plan HPC
1)SIL ASSESSMENT:
Identify the adequacy of protection of Safety Instrumented Functions (SIF).
In Jihar project LOPA (Level of Protection Analysis) was used.
2)SIL Verification
The risk reduction performance of any given SIF depends on the equipment chosen and the
redundancy levels. and requires reliability analysis of the equipment with a view toward a
particular failure mode.
OVERALL RISK to
• People (PLL, IRPA)
• Assets (potential cost)
• Environment (potential impact)
ASSESS RISKS
INPUT
• Risk reduction
• Option selection
Re-assess based
• Change decision on any changes
• Emergency response
• HSE Case, etc.
The IP-15 has been used for hazardous area classification in Jihar stage-3
project.
\\fil012aaashjuae\
\\fil012aaashjuae\ \\fil012aaashjuae\ JI-191\HSE\HAZARDOUS A
JI-191\HSE\HAZARDOUS A JI-191\HSE\HAZARDOUS A
- Aim of the fire proofing is to limit the extent of fire related property loss
because steel loses its strength and load bearing capability rapidly when
at about 500°C.
- Determining fire proofing needs based on the potential impact of the fire.
\\fil012aaashjuae\ \\fil012aaashjuae\
JI-191\HSE\FIRE PROOFI JI-191\HSE\FIRE PROOFI
- Visual Alarm - installed all around the plant in noisy open or closed areas
to warn the personnel from a hazardous situation