CLUSTER PREPARATION

FLOW CHART
Processing/Verificat Drive Test
Pre-check Initial Drive Test Collection of Logs ion Of Logs Analysis

No
Post Drive Verify Patch All KPI
Change Optimization
Analysis
Test Drive Log ok?
Implementation

Yes

Yes
If Any
Issue
persist

No
Preparation of
Report

Submit
Report
Pre check

SCFT should be completed for all sites

All sites in the cluster should be On air

Alarm free while doing the cluster drive.


Collecting logs(DTE)

Collecting the logs from field

Check all possible routes are driven are not


Verification of logs(PPE)

DT scenarios according to the customer proposal, like Short call, Long call, Data
etc..

Routes

Cluster Boundary
Drive test Analysis

Swap And Coverage

Quality and Throughput

Events and Bad network patch area

If any above issues found ,patch area logs will send to DT engineer for drive again after
Optimization
Optimization

Physical optimization Parameter optimization

Azimuth
Neighbors relation & Neighbor
Audit, for DCR & HOSR ,Tuning
the Timers & counter
Electrical/Mechanical tilt
values(differ from each
operator)

Antenna Height

According to the patch area we will first prefer to suggest physical optimization to DT
ENGINEERS.
It is not improved then we will go for parameter optimization
Done by DT engineer(Proper approval need to taken from the site
Change Technician) .
Implementation After reaching the site ,DT engineer will do optimization as
suggested by the RNO’S based on the patch area

Verification Drive test Need to analyze the patch route improvement

If any KPI not met the threshold need to give the proper justification
Post Drive
with Snaps or again go for further optimization
Prepare the report
Preparation of as per the
Submit the Report
Report customer report
format.