APPLICATION OF VIRTUAL DESIGN AND CONSTRUCTION

IN OPTIMIZATION OF CONSTRUCTION PROJECTS

Abstract • Improper planning and not evaluating the • Electrical- Ceiling Light and switch
Virtual Design and Construction (VDC) have alternate solutions results in following: fittings
the potential to advance the quality of - Delay in the construction activities
construction project management. It is an - Inflated cost of the project
established fact that Building Information
Modelling (BIM) facilitates various Objective Figure No. 7
components of construction project, To present the application of the VDC for the
especially in the communication and the optimization of the construction project
management. Figure No. 4 Conclusions
coordination of the resources. Adopting such • Even though the concept of VDC and BIM
technique helps in identifying the problems • Plumbing – Sanitary Line fittings is known but then too the use of such
prior to actual construction and thus avoids Methodology techniques especially in India is not well
costly re-work. VDC describes a utilised in fact such technology is being
methodology that encompasses the outsourced from the other countries – thus to
authoring, analysis and management of establish and to understand the efficacy of
multi-disciplinary as well as multi- such useful technique in the construction
dimensional, data-based models, and is a management process is one of the major
step ahead of various existing methods. In concern.
this research, we mainly focus on the role of Figure No. 5 • The VDC and lean method for MEP
VDC concepts and methodologies including coordination addresses the challenges i.e.
integrated project delivery forms in the Analyzing lack of a consistent, well grounded and
architecture, engineering, and construction To analyse the different paths of construction repeatable method for MEP coordination
industry. It covers various phases such as and to choose the best optimum way for each results in wasted effort of project team
project design, cost estimation, project activity which requires minimum work members and thus provides a repeatable
scheduling and project monitoring. The 5D power, resources and ensures low cost and method that project teams can adopt to
models generated by VDC provide the Figure No. 1 time. produce consistent results for MEP
decision-makers and construction coordination.
professionals with an estimation of the time, Results • To enhance the interoperability and
cost and human resources and thus helps in  Development of 3D models productivity of the project we have generated
the optimization of the resources as per the the 5D model i.e. the cost and time
requirement. estimation which aims at the better
functioning and the proper coordination of
Introduction construction project activities.
Virtual Design and Construction (VDC) is an
integrated approach that combines Building Figure No. 6
Information Modelling (BIM) and advanced
References
management methods to improve the Figure No. 2 •Experiences using Building Information
Model for a Construction Project by
productivity, reliability and efficiency of the  Scheduling
project.  MEP Elements M.H.Tsai, C.H.Wu,A. Matin Md, S.L.Fan,
According to the sequence, building
• Mechanical – Duct Fitting S.S.Kang, S.H.Heish - National Taiwan
components are orderly listed with
Need for Study University, Taiwan.
component ID and the quantity of each
• Construction Projects suffer from two • Study of the Implementation process of
required work item. With the inputted
major drawbacks: BIM in construction projects by Hannes
parameters, planners may formulate an
- Lack of coordination among different Lindblad - stockholm 2013 , thesis no. -263
optimal crew assignment. The scheduled
construction activities • “Refabricating Architecture,” Timberlake
amount of each item will be provided in this
- Lack of resource sharing. Figure No. 3 • “2009 BIM Smart Market Report,”McGraw
section.
Hill Foundation
.