Excavation investigati
on
undergrou Diaphrag
Landscapi nd m walls &
Dredging
ng constructi anchorage
on s
INCLUD EXCLUDE
E
Foundatio
Disposal Filling n – traffic Utility
sign
Compactio
Piles
n
Earthwor
ks
First Division Second Third Division
Division
• First Division
Excavation - Dredging
Excavation - Cuttings
General Excavation
Excavation - Ancillaries
• Second Division
1. Topsoil
Excavation -
2. ≥ Topsoil, rock, or hard material
Dredging
Excavation -
3. Rock
Support Cuttings
4. Hard material exposed at Commencing Surface Excavation -
for
5. Hard material not exposed at Commencing Surface Fondations
General
Excavation
• Third Division
1. Max depth:
≤ 0,25 m
0,25 – 0,5 m
0,5 – 1 m Excavation -
1–2m Fondations
2–5m Support
5 – 10 m for
10 – 15 m General
≥ 15 m Excavation
Measurement Rules Bulking