Organization Chart
Project Background

 Thetask of photogrammetry had been given


around Seri Manjung, Perak to produce
Orthophoto, DEM map and topographic map.
 Thetask include surveying works, aerial photo
captured and process the data taken.
 Theduration to complete this task is at about
10 days.
Study Area
Aim and Objectives
Aim
The aim of this project is to obtain reliable information about physical
objects and the environment of area Taman Samudera Fasa 2A, Seri Manjung,
Perak by using UAV technology for photogrammetry survey.

Objectives
 To carry out horizontal control survey around the study area.
 To locate Ground Control Point (GCP) and Verification Point (VP) on the
aerial image.
 To process and calculate RMSE Error for GCP and VP.
 To generate Orthophoto, DEM and topographic map, from aerial image
RESULT AND ANALYSIS
Traverse

Angular Misclosure Linear Misclosure


11’’ 1: 182292
GCP
Error for GCP

The tolerance for the GCP error should follow the ground resolution
which is 0.046m which are the total error for all GCP are below the
tolerance required. This model can be used to generate DEM and
Orthophoto but before that the image should be prove by using the
Verification Point.
RMS Error for Verification Points
Residual (Errors)
E(m) N(m) H(m)
Number of check points 30 30 30
Mean Error (m) -0.016 0.027 -0.260
Standard Deviation (m) 0.115 0.082 0.401
RMSE (m) 0.114 0.085 0.472
RMSEr (m) 0.142
NSSDA Horizontal Accuracyr (ACCr) at 95% Confidence Level 0.246
NSSDA Vertical Accuracyz (ACCz) at 95% Confidence Level 0.926

The tolerance of X < Y and Z should follow the guidance from the ASPRS article produce in 2015. In
ASPRS the tolerance X, Y should be 0.75 m and for Z the tolerance should be 0.5 m. Since the
error for X and Y is 0.114 m and 0.085 this error is in tolerance 0.75 m and for Z the error is 0.472
m is below than 0.5 m and all of the error for X, Y and Z can be accepted. This project can be
used to perform for others analyses since the error were within tolerance. X and Y is known as
planimetric position and z is known as vertical position. The RMSE for both position were
calculated by using formula.
FINAL PRODUCT
Orthophoto
DEM
Topographic Map
Conclusion

All the task is done by followed the objectives of this


project which include carry out horizontal control
survey, to locate the GCP and VP on the aerial images,
to calculate RMS Error for GCP and VP and lastly to
generate Orthophoto, DEM and Topography Map.
Photogrammetry is not just to capture the images but it
also include fieldwork to establish GCP and VP then
being located on aerial images captured, to process
RMSE error and lastly Orthophoto, DEM and Topography
can be produced.