Outline
 GLOBAL COMPANY PROFILE: VOLKSWAGEN
 THE STRATEGIC IMPORTANCE OF THE
SUPPLY-CHAIN
 Global Supply-Chain Issues
 SUPPLY-CHAIN ECONOMICS
 Make-or-Buy Decisions
 Outsourcing

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-2
Management, 7e
Outline - Continued

 SUPPLY-CHAIN STRATEGIES
 Many Suppliers
 Few Suppliers
 Vertical Integration
 Keiretsu Networks
 Virtual Companies

 Managing the Supply Chain


 Issues In an Integrated Supply Chain
 Opportunities in an Integrated Supply Chain
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-3
Management, 7e
Outline - Continued

 INTERNET PURCHASING
 VENDOR SELECTION
 Vendor Evaluation
 Vendor Development
 Negotiations
 MATERIALS MANAGEMENT
 BENCHMARKING SUPPLY-CHAIN
MANAGEMENT

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-4
Management, 7e
Learning Objectives
When you complete this chapter, you should be
able to :
Identify or Define:
 Supply-chain management
 Purchasing
 Outsourcing
 E-procurement
 Materials management
 Keiretsu
 Virtual companies

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-5
Management, 7e
Learning Objectives
When you complete this chapter, you should be
able to :
Describe or Explain:
 Supply-Chain Strategies
 Purchasing strategies
 Approaches to negotiations

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-6
Management, 7e
Volkswagen

 Brazilian plant employs 1000 workers


 200 work for VW
 800 work for other contractors:
 Rockwell International, Cummins Engines, Deluge Automotiva,
MWM, Remon and VDO, etc.

 VW responsible for overall quality, marketing,


research and design
 VW looks to innovative supply-chain to improve
quality and drive down costs

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-7
Management, 7e
Volkswagen

 Unusual elements:
 VW is buying not only materials, but also the labor and
related services
 Suppliers are integrated tightly into VW’s own network,
right down to assembly work in the plant

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-8
Management, 7e
Supply-Chain Management
 Planning, organizing, directing, & controlling flows
of materials
 Begins with raw materials
 Continues through internal operations
 Ends with distribution of finished goods

 Involves everyone in supply-chain


 Example: Your supplier’s supplier
 Objective: Maximize value & lower waste

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-9
Management, 7e
The Supply-Chain
VISA
®

Material Flow Credit Flow

Supplier Manufacturing Retailer Consumer

Supplier Wholesaler Retailer

Schedules Order Cash


Flow Flow
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-10
Management, 7e
The Supply Chain
Market research data
Scheduling information
Engineering and design data
Supplier Order flow and cash flow Customer
Ideas and design to
Inventory satisfy end customer
Material flow
Supplier Credit flow

Manufacturer Customer
Inventory Inventory
Supplier

Distributor Customer
Inventory

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-11
Management, 7e
Material Costs in
Supply-Chain
Wholesale
8% 9%
COGS
Manufacturing
Payroll
31% Material 83%
Other
11% Dir Wages
58% Retail
Other
16% COGS
13%
Payroll
71%
Other
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-12
Management, 7e
Supply-Chain Support for Overall
Strategy
Low Cost Response Differentiation
Supplier’s Supply demand Respond Share market
goal at lowest quickly to research; jointly
possible cost changing develop
requirements products and
and demand to options
minimize
stockouts

Primary Select Select Select primarily


Selection primarily for primarily for for product
Criteria cost capacity, development
speed, and skills
flexibility

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-13
Management, 7e
Supply-Chain Support for Overall
Strategy - continued
Low Cost Response Differentiation
Process Maintain high Invest in Modular
Characteristics average excess processes that
utilization capacity and lend themselves
flexible to mass
processes customization

Inventory Minimize Develop Minimize


Characteristics inventory responsive inventory in the
throughout the system, with chain to avoid
chain to hold buffer stocks obsolescence
down costs positioned to
ensure supply

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-14
Management, 7e
Supply-Chain Support for Overall
Strategy - continued
Low Cost Response Differentiation
Lead-time Shorten lead- Invest Invest
Characteristics time as long as it aggressively to aggressively to
does not reduce reduce
increase costs production development
lead-time lead-time

Product-design Maximize Use product Use modular


Characteristics performance designs that design to
and minimize lead to low set- postpone
cost up time and product
rapid production differentiation for
ramp-up as long as
possible
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-15
Management, 7e
Global Supply-Chain Issues

Supply chains in a global environment must be:


 Flexible enough to react to sudden changes in parts
availability, distribution, or shipping channels, import
duties, and currency rates
 Able to use the latest computer and transmission
technologies to schedule and manage the shipment of
parts in and finished products out
 Staffed with local specialists to handle duties, trade,
freight, customs and political issues

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-16
Management, 7e
Importance of Purchasing
 Major cost center
 Affects quality of final product
 Aids strategy of low cost, response, and
differentiation

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-17
Management, 7e
Supply-Chain Costs as a Percent
of Sales
Industry Percent of Sales
 All industry  52%
 Automobile  67%
 Food  60%
 Lumber  61%
 Paper  55%
 Petroleum  79%
 Transportation  62%

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-18
Management, 7e
Dollars of Additional Sales Needed to
Equal 1$ Saved Through Purchasing
Percent of Sales Spent in the Supply-Chain
Percent 30% 40% 50% 60% 70% 80% 90%
Net
Profit of
Firm
2 $2.78 $3.23 $3.85 $4.76 $6.25 $9.09 $16.67
4 $2.70 $3.13 $3.70 $4.55 $5.88 $8.33 $14.29
6 $2.63 $3.03 $3.57 $4.35 $5.56 $7.69 $12.50
8 $2.56 $2.94 $3.45 $4.17 $5.26 $7.14 $11.11
10 $2.50 $2.86 $3.33 $4.00 $5.00 $6.67 $10.00

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-19
Management, 7e
Objectives of the Purchasing
Function
 Help identify the products and services that can
be best obtained externally; and
 Develop, evaluate, and determine the best
supplier, price, and delivery for those products
and services

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-20
Management, 7e
The Purchasing Focus
Materials Management Supply Management
-High transportation cost -High costs
-High inventory costs -Scarcity: national or
international
Purchasing
Management
-Commodity items
-Standard products

Source Management
-Unique items
-Custom-made items
-High technology items
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-21
Management, 7e
Traditional Purchasing Process
Customer Supplier
Purchase Mail Order
Order Processing
Receiving
Receivables Dock
Report Packing
List

Accounts Mail Invoice


Payable

Check Mail Accounts


Reconcile
Receivable

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-22
Management, 7e
Purchasing Techniques
 Drop shipping and special packaging
 Blanket orders
 Invoiceless purchasing
 Electronic ordering and funds transfer
 Electronic data interchange (EDI)
 Stockless purchasing
 Standardization
 Outsourcing

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-23
Management, 7e
Make/Buy Considerations
Reasons for Making Reasons for Buying
1. Maintain core competencies 1. Frees management to deal
and protect personnel from with its primary business
layoff 2. Lower acquisition cost
2. Lower production cost 3. Preserve supplier
3. Unsuitable suppliers commitment
4. Assure adequate supply 4. Obtain technical or
5. Utilize surplus labor and management ability
make a marginal 5. Inadequate capacity
contribution
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-24
Management, 7e
Make/Buy Considerations -
Continued
Reasons for Making Reasons for Buying
6. Obtain desired quantity 6. Reduce inventory costs
7. Remove supplier collusion 7. Ensure flexibility and
8. Obtain a unique item that alternate source of supply
would entail a prohibitive 8. Inadequate managerial or
commitment from the
supplier technical resources
9. Protect proprietary design or 9. Reciprocity
quality 10. Item is protected by patent
10. Increase or maintain size of or trade secret
company
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-25
Management, 7e
Supply-Chain Strategies
 Plans to help achieve company mission
 Affect long-term competitive position
 Strategic options
 Many suppliers
 Few suppliers
 Keiretsu network
 Vertical integration
 Virtual company Plan

© 1995 Corel Corp.


Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-26
Management, 7e
Supply-Chain Strategies
 Negotiate with many suppliers; play one supplier against another
 Develop long-term “partnering” arrangements with a few suppliers
who will work with you to satisfy the end customer
 Vertically integrate; buy the actual supplier
 Keiretsu - have your suppliers become part of a company coalition
 Create a virtual company that uses suppliers on an as-needed
basis.

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-27
Management, 7e
Many Suppliers Strategy
 Many sources per item
 Adversarial relationship
 Short-term
 Little openness
 Negotiated, sporadic PO’s
 High prices
 Infrequent, large lots
 Delivery to receiving dock © 1995 Corel Corp.

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-28
Management, 7e
Few Suppliers Strategy
 1 or few sources per item
 Partnership (JIT)
 Long-term, stable
 On-site audits & visits
 Exclusive contracts
 Low prices (large orders) © 1995
Corel

 Frequent, small lots


Corp.

 Delivery to point of use

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-29
Management, 7e
Daimler Chrysler’s Supplier Cost
Reduction Effort
Supplier Suggestion Model Savings
Rockwell Use passenger car door Dodge $280,000
locks on trucks trucks
Rockwell Simplify design/substitute Various $300,000
materials on manual
window system
3M Change tooling for wood- Caravan, $1,500,000
grain panels to allow three Voyager
from one die instead of two
Trico Change wiper-blade Various $140,000
formulation
Leslie Metal Exterior lighting suggestions Various $1,500,000
Arts

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-30
Management, 7e
Tactics for Close Supplier
Relationships
Tactic Results
 Reduce total number of  Average 20% reduction in 5 years
suppliers
 Certify suppliers  Almost 40% of all companies
surveyed were themselves
currently certified
 Ask for JIT delivery from key  About 60% ask for this
suppliers
 Involve key suppliers in new  About 54% do this
product design
 Develop software linkages to  Almost 80% claim to do this
suppliers About 50% claim this

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-31
Management, 7e
Vertical Integration Strategy
 Ability to produce goods Raw Material
previously purchased (Suppliers)
 Setup operations
Backward
 Buy supplier
Integration
 Make-buy issue
Current
 Major financial Transformation
commitment Forward
 Hard to do all things well Integration
Finished Goods
(Customers)
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-32
Management, 7e
Forms of Vertical Integration

Iron Ore Silicon Farming Raw Material


(Suppliers)

Steel Flour Milling Backward


Integration

Integrated Current
Automobiles
Circuits Transformation

Distribution Forward
Circuit Boards
System Integration

Computers
Finished Goods
Dealers Watches Baked Goods
(Customers)
Calculators

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-33
Management, 7e
Vertical Integration Can be
Forward or Backward
Vertical Integration Examples of Vertical Integration
Raw material (suppliers) Iron ore Silicon Farming
Backward Integration Steel
Current Transformation Automobiles Integrated Circuits Flour
Milling
Forward Integration Distribution Circuit boards
System
Finished goods (customers) Dealers Computers, watches, Baked
calculators Goods

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-34
Management, 7e
Keiretsu Network Strategy

 Japanese word for ‘affiliated chain’


 System of mutual alliances and
cross-ownership
 Company stock is held by allied firms
 Lowers need for short-term profits
 Links manufacturers, suppliers, distributors, &
lenders
 ‘Partnerships’ extend across entire supply chain

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-35
Management, 7e
Virtual Companies

 Companies that rely on a variety of supplier


relationships to provide services on demand.
 Also known as hollow corporations, or network
corporations

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-36
Management, 7e
Virtual Company Strategy
 Network of independent companies
 Linked by technology
 PC’s, faxes, Internet etc.
 Each contributes core competencies
 Typically provide services
 Payroll, editing, designing
 May be long or short-term
 Usually, only until opportunity is met

© 1995 Corel Corp.

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-37
Management, 7e
Managing the Supply-Chain
 Options:
 Postponement
 Channel assembly
 Drop shipping
 Blanket orders
 Invoiceless purchasing
 Electronic ordering and funds transfer
 Stockless purchasing
 Standardization
 Internet purchasing (e-procurement)

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-38
Management, 7e
Managing the Supply-Chain -
Other Options

 Establishing lines of credit for suppliers


 Reducing bank “float”
 Coordinating production and shipping schedules
with suppliers and distributors
 Sharing market research
 Making optimal use of warehouse space

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-39
Management, 7e
Successful Supply-Chain
Management Requires:

 A mutual agreement on goals


 Trust
 Compatible organizational cultures

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-40
Management, 7e
Issues in an Integrated Supply-
Chain

 Local optimization
 Incentives
 Large lots

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-41
Management, 7e
Opportunities in an Integrated
Supply-Chain

 Generation of accurate “pull” data


 Reduction of lot size
 Single stage control of replenishment

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-42
Management, 7e
Vendor Managed Inventory (VMI)
 Postponement – keeps product generic as long as possible
 Channel Assembly – sends to distributor individual components
and modules rather than finished goods
 Drop Shipping and Special Packaging – supplier will ship to end
consumer rather than to seller
 Blanket Orders – a long-term purchase commitment to a
supplier for items that are to be delivered against short-term
releases to ship
 Standardization – reducing the number of variations in materials
and components
 Electronic Ordering and Funds Transfer – “paperless” ordering
and 100% material acceptance, payment by “wire”
Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-43
Management, 7e
Vendor Selection Steps

 Vendor evaluation
 Identifying & selecting potential vendors
 Vendor development
 Integrating buyer & supplier
 Example: Electronic data exchange
 Negotiations
 Results in contract
 Specifies period of agreement, price, delivery terms etc.

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-44
Management, 7e
Supplier Selection Criteria

 Company  Service
 Financial stability  Delivery on time
 Management  Condition on arrival
 Location  Technical support
 Product  Training
 Quality
 Price

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-45
Management, 7e
Vendor Selection Rating Form

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-46
Management, 7e
Negotiation Strategies

 Three types:
 cost-based price model - supplier opens its books to
purchaser; price based upon fixed cost plus escalation
clause for materials and labor
 market-based price model - published price or index
 competitive bidding - potential suppliers bid for contract

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-47
Management, 7e
Logistics Management

Integrates all materials functions


 Purchasing
 Inventory management
 Production control
 Inbound traffic
 Warehousing and stores
 Incoming quality control
Objective: Efficient, low cost operations

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-48
Management, 7e
Goods Movement Options

 Trucking
 Railways
 Airfreight
 Waterways
 Pipelines

Transparency Masters to accompany Heizer/Render – © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J. 07458
Principles of Operations Management, 5e, and Operations 11-49
Management, 7e
Supply-Chain Performance
Compared
Benchmark
Typical Firms Firms
Administrative costs as 3.3% 0.8%
percent of purchases
Lead time (weeks) 15 8
Time spent in placing order 42 minutes 15 minutes
Percentage of late deliveries 33% 2%
Percentage of rejected material 1.5% .0001%
Number of shortages per year 400 4