Vous êtes sur la page 1sur 19

Proposal for 2 ndSource

connectivity to Grid Sub-stations


INDEX
1. Action taken to meet N-I compliance/ constraint.
2. Approved in 12th plan to provide second source connectivity to
GSS.
3. Approved in 13th plan to provide second source connectivity to
GSS.
4. List of GSS for 2nd ckt. stinging having single source power on
double ckt. Tower.(new proposal) Rs.96 Cr
5. Proposal for 2nd source connectivity to 132/33 KV GSS.(new
proposal) Rs.262 Cr
6. List of GSS for 2nd ckt. LILO.(new proposal)
Rs.9.61 Cr
7. Proposal of reconductoring of 132/33 KV S/c SKMCH-
Sitamarhi(old) Tr. Line with HTLS equvalent to panther
conductor.(new proposal) Rs.41.85 Cr
8. Total tentative cost of new proposal-410 Cr.
Requirement of 50 MVA Transformer & 132/33 KV 50/20 MVA
Transformer bay to meet N-1 compliance/constraint
Sl. Name of GSS Capacity Total Remarks Addition/ Require Circle 50 Bay
No. (MVA) Capacity Replacement ment of MVA
(MVA) Transfor
mer
Mushrakh 2x20 40 Space not available Replacement 1x50 MUZ 1
1 MVA
Kochas 2x20 40 Space not available Replacement 1x50 DoS 1
2 MVA
Dhaka 2x20 40 Problem in one 1x20 Replacement 1x50 MUZ 1
3 MVA Transformer MVA
Phoolparas 2x20 40 Space not available Replacement 1x50 MUZ 1
4 MVA
Harnaut 2x20 40 Space not available Replacement 1x50 BSF 1
5 MVA
Udakishanganj 2x20 40 Space available Addition 1x20 PRN 1
6 MVA
Jagdishpur 1x50+1x 70 Space not available Replacement 1x50 DoS 1
7 20 MVA
Kudra 2x20 40 Space available Addition 1x20 DoS 1 1
8 MVA
Tarapur 2x20 40 Space not available Replacement 1x50 BGP 1
9 MVA
Bettia 2x20+1x 90 Require 20 MVA Replacement 1x50 MUZ 1
10 50 replacement MVA
Cont.
Sl. No. Name of GSS Capacity Total Remarks Addition/ Requireme Circle 50 Bay
(MVA) Capacity Replacement nt of MVA
(MVA) Transform
er
Jandaha 2x20+1x50 90 Require 20 MVA replacement Replacement 1x50 MVA MUZ

11
Barh 1x50+1x20 70 Require 20 MVA replacement Replacement 1x50 MVA BSF 1

12
Pupri 2x20 40 Space not available Replacement 1x50 MVA MUZ 1
13
Sherghati 2x20 40 Space available Addition 1x20 MVA Gaya 1 1
14
Tekari 2x20 40 Space available Addition 1x20 MVA Gaya 1
15
Siwan 2x50+1x20 120 20 MVA charged on no load Replacement 1x50 MVA MUZ 1
16
Jainagar 3x20 60 Space not available Replacement 1x50 MVA MUZ
17
Supoul 3x20 60 Space not available Replacement 1x50 MVA PRN 1
18
Jamalpur 2x50 100 Space available Addition 1x50 MVA BGP 1
19
Ataula 1x20+1x50 70 Space not available Replacement 1x50 MVA Gaya 1
20
Sl. No. Name of GSS Capacity Total Remarks
Cont.
Additon/ Requireme Circle 50 Bay
(MVA) Capacity Replacement nt of MVA
(MVA) Transform
er
Chapra 2x50+1x20 120 Space not available Replacement 1x50 MVA MUZ 1
21
Hulasganj 2x20 40 Space available Addition 1x20 MVA Gaya 1
22
Maharajganj 2x20 40 Space available Addition 1x20 MVA MUZ 1 1
23
Hathua 2x20 40 Space available Addition 1x20 MVA MUZ 1 1
24
Aurangabad 2x20+1x50 90 Space not available Replacement 1x50 MVA DoS
25
Ekangarsarai 3x20 60 Space available Addition 1x20 MVA BSF 1 1
26
Rafiganj 1x50+1x20 70 Space not available Replacement 1x50 MVA Gaya 1
27
Mohania 1x50+1x20 70 Require 20 MVA replacement Replacement 1x50 MVA DoS
28
Raxaul 1x50+1x20 70 Space not available Replacement 1x50 MVA MUZ
29
Lakhisarai 2x20+1x50 90 Space not available Replacement 1x50 MVA BSF 1
30
Sasaram 1x50+2x20 90 Require 20 MVA replacement Replacement 1x50 MVA DoS 1
31
Runisaidpur 2x20 40 Space not available Replacement 1x50 MVA MUZ 1
32
Sonebarsa 2x20 40 Space not available Replacement 1x50 MVA PRN 1
33
Cont.
Sl. No. Name of GSS Capacity Total Remarks Additon/ Requireme Circle 50 Bay
(MVA) Capacity Replacement nt of MVA
(MVA) Transform
er
Wajirganj 2x20 40 Space available Addition 1x20 MVA Gaya 1 1
34
Imamganj 2x20 40 Space not available Replacement 1x50 MVA Gaya
35
Bikramganj 1x20+2x50 120 Require 20 MVA replacement Replacement 1x50 MVA DoS 1
36
Banjari 3x20 60 Space not available Replacement 1x50 MVA DoS 1
37
Vaishali 2x20+1x50 90 Space not available Replacement 1x50 MVA MUZ 1
38
Tehta 2x20 40 Space not available Replacement 1x50 MVA Gaya 1
39
Goh 2x20 40 Space available Addition 1x20 MVA DoS 1 1
40
Banmanki 2x20 40 Space not available Replacement 1x50 MVA PRN 1
41
Masaudhi 2x20+1x50 90 Require 20 MVA replacement Replacement 1x50 MVA PAT 1
42
Shekhpura 2x20+1x50 90 Space not available Replacement 1x50 MVA BSF 1
43
Jehanabad 2x20+1x50 90 Require 20 MVA replacement Replacement 1x50 MVA Gaya 1
44
Belaganj 2x20 40 Space not available Replacement 1x50 MVA Gaya 1
45
Benipatti 2x20 40 Space not available Replacement 1x50 MVA MUZ 1
46
Rajgir 2x20+1x50 90 Space not available Replacement 1x50 MVA BSF 1
47
Requirement 37 11
The list of GSS already approved in 12thplan for second source
connectivity to meet N-I and constraint
Circle-Purnea
Sl. No. Name of GSS Existing Connectivity 2nd Source Connectivity Plan/Propasal
Proposed
LILO Of 132 KV Purnea- Under scope of Phase-
132 KV Purnea-Katihar (DCSS) tr
1 Katihar Naugachhia (S/C) at Katihar IV, Part-II. BGCL. Work
line.
GSS under process..
Circle-Muzaffarpur
LILO of 132 KV Bettia-
132 KV Bettia-Narkatiyaganj-
1 Ramnagar Dhanha tr line at Ramnagar 12th Plan
Ramnagar (DCSS) tr. line.
(Under Construction).
Circle-Dehri-on-Sone
132 KV Dumraon-Buxar D/C tr. 132 KV Dumraon (New)- By BGCL under 12th
1 Buxar
Line Buxar (D/C) line Plan Phase-IV, Part-I
132 KV Sonenagar (New)-
132 KV Sonnagar (old)- Aurangabad (D/C) tr. Line.
2 Aurangabad 12th Plan
Aurangabad (D/C) tr. Line (Under construction & likely
to be ready very soon)
132 KV Ara-Jagdishpur (D/C)
3 Ara 132 KV Ara(PG)-Ara (s/c) Tr. Line
tr line. 12th Plan
132 KV Ara(PG)-Jagdishpur Tr. 132 KV Dumraon(New)-
4 Jagdishpur By BGCL
Line Jagdishpur (D/C)Tr. Line
The list of GSS already approved in 13thplan for second source connectivity
to meet N-I and constraint .
Circle-Purnea

Sl. 2nd Source Connectivity


No. Name of GSS Existing Connectivity Proposed Plan/Propasal
LILO of 132 KV Purnea- 2nd sourc is approved
1 Dhamdaha Saharsa (S/C) tr. Line at in 13th Plan. But it will
Dhamdaha gss be more benificial if
LILO of 132 KV
LILO of 132 KV Saharsa- Banmankhi-Dhamdaha
Banmankhi (S/C) tr line (S/C) be made at
at Saharsa (New). Saharsa (New). This
LILO of 132 KV Purnea-
(Covered in 13th Plan) will provide direct
2 Banmankhi Saharsa (DCSS) tr. Line at
connectivity of
Banmankhi gss
Dhamdha &
Banmankhi with
Saharsa (New).

LILO of 132 KV
Kishanganj(old) – 132 KV D/C Thakurganj
3 Araria 13th Ext Plan.
Farbisganj S/C Tr. Line at GSS-Araria GSS
Araria
Cont.
Circle-Muzaffarpur
Sl. 2nd Source Connectivity
No. Name of GSS Existing Connectivity Proposed Plan/Proposal
Cimm

Circle-Muzaffarpur

LILO of 132 KV Benipatti-


132 KV Benipatti-Sursand (S/C) tr. Sursand (S/C) line at
1 Sursand (Pupri) 13th Plan
Line. 400/220/132 KV Sitamadhi
(New) station

LILO of 132 KV Vaishali-


132 KV MTPS-Motipur-Muzaffarpur
2 Muzaffarpur Muzaffarpur (D/C) at (220/132 13th Plan
(D/C) tr.line.
KV) Goraul GSS

132 KV Jandaha-Manhar DCSS tr. 132 KV Goraul-Mahnar D/C tr.


3 Mahnar 13th Plan Extn.
Line. Line
Circle-Chhapra

T-Connection between Chapra-Siwan 132 KV Chapra New (Amnour)-


1 Ekma 13th Plan Extn.
S/C tr. Line Ekma D/C tr. line

220 KV Hajipur-Chapra New (D/C) tr. 220 KV Muzaffarpur (PG)-


2 Chapra New(BGCL) 13th Plan
Line Chapra (New) (D/C) tr. Line
Cont.
Sl. No. Name of GSS Existing Connectivity 2nd Source Connectivity Proposed Plan/Proposal
Circle-Darbhanga
132 KV Samastipur (New)-
Shahpurpator 132 KV Tajpur-Shahpurpatori
1 Shahpurpatori tr. (DCSS) 13th Plan Extn.
i (D/C) tr. Line
Line
Circle – Patna
132 KV Khagaul-Digha(D/C) 132 KV (220/132KV) Digha
1 Digha(old) 13th Plan Extn.
tr. Line. (NEW)-Digha (Old) (D/C) tr line.
Circle- Biharsharif
LILO of 132kV Biharsharif – 132kV S/C Nalanda GSS –
1 Nalanda 13th Plan Extn.
Barhi S/C transmission line Asthawan GSS
LILO of 132kV Biharsharif –
Barhi S/C transmission line
132kV S/C Rajgir GSS –
2 Rajgir along with T-connection from 13th Plan Extn.
Asthawan GSS
132kV Nalanda – Barhi
transmission line
LILO of 132kV Biharsharif- 132kV S/C Barh GSS –
3 Barh 13th Plan Extn.
Hathidah S/C transmission line Asthawan GSS
Patna Circle
1 400/220/132/33 KV Naubatpur-Paligang 13th Plan
2 Naubatpur- Masaurhi 13th Plan
3 Bakhtiyarpur(new)- Harnaut 13th Plan
4 Bakhtiyarpur(new)- Baripahari 13th Plan
5 LILO of both Ckt of Jakanpur- Sipra at Jakanpur(new) 13th Plan
6 LILO of 132 KV S/C Jakkanpur/ Mithapur- Fatuha line at Jakkanpur(new) 13th Plan
Second circuit stringing(new proposal)

Sl. GSS to provide Existing Tentative Line Length


Proposed 2nd Circuit stringing
No. 2nd Source Tower (CKm)
1 Bhabhua DCSS 132 kV S/c Bhabhua – Mohania 22
2 Piro DCSS 132 kV S/c Piro – Bikramganj 19
3 Mahrajganj DCSS 132 kV S/c Mahrajganj – Mashrakh 14
4 Mahnar DCSS 132 kV S/c Mahnar – Jandaha 08
5 Pupri DCSS 132 kV S/c Pupri - Benipatti 17
6 Benipur DCSS 132 kV S/c Benipur - Kusheshwarsthan 31
7 Chakia DCSS 132 kV S/c Chakia – Motipur 08
8 Sahpur Patori DCSS 132 kV S/c Sahpur Patori – Samastipur (New) 30
9 Pakridayal DCSS 132 kV S/c Pakridayal – Dhaka 14
10 Teghra DCSS 132 kV S/c Teghra – Begusarai 29
Simri
11 DCSS 132 kV S/c Sonbarsa – Simri Bakhtiyarpur 14
Bakhtiyarpur
12 Barsoi DCSS 132 kV S/c Kishanganj (New) – Barsoi 59
TOTAL 265
New Proposal for 2nd Source Connectivity
Circle-Purnea
Sl. No. Name of GSS Existing Connectivity 2nd Source Connectivity Plan/Propos Tentative
Proposed al Line length
(Ckm)
132KV Kishanganj (New)- 25
1 Barsoi
Barsoi(DCSS) tr. lines 132 KV Manihari-Barsoi New
LILO of 132 KV Purnea-Katihar (D/C) tr. Line. Proposal
2 Manihari
tr. Line at Manihari
Circle-Madhepura
132 KV Khagaria(New)- 30
Shimri 132 KV Sonbarsa-Shimri New
1 Shimri Bakhtiyarpur (D/C)
Bakhtiyarpur Bakhtiyarpur (DCSS) tr. Line Proposal
tr. Line
132 KV Phulparas-Nirmali & 132 KV Laukhi-Nirmali 25
New
2 Nirmali 132 KV Supaul-Nirmali (S/C) tr. (D/C) tr. Line. (No kosi river
Proposal
Line. crossing)
132 KV Purnea-Triveniganj & 19
132 KV Raghopur- New
3 Triveniganj 132 KV Farbesganj-Triveniganj
Triveniganj(D/C) tr. Line Proposal
(DCSS) tr. Line
Circle-Muzaffarpur
132 KV Motipur-Chakia (DCSS) 30
1
Chakia tr. line. 132 KV Pakridyal- New
132 KV Dhaka-Pakridyal (DCSS) Chakia(D/C) tr. Line. Proposal
2
Pakridyal tr. line.
LILO of 132 KV Bettiah- 35
132KV Raxaul (New)- New
3 Narkatiyaganj Ramnagar (S/C) tr. line at
Narkatiyaganj(D/C) tr. Line Proposal
Sl. Name of GSS Existing Connectivity 2nd Source Connectivity Plan/Proposal Tentative Line
No. Proposed length (Ckm)

Circle-Chhapra
Maharajga 132 KV Masrakh-Maharajganj(DCSS)Tr. Line 132 kv Chhapra New (BGCL)- 20
1 New Proposal
nj Maharajganj (D/C) tr line.
Circle-Darbhanga
Benipur 132 KV Kusheshwarasthan-Benipur (DCSS) tr. 132 KV Jhanjharpur-Benipur New Proposal 20
1
Line (D/C) tr. Line
Rosera LILO of S/C 132 KV Dalsinghsarai- 132 kV D/c Samastipur (220kV New Proposal
2 35
Kusheshwarsthan New) - Rosera Tr. line
Circle-Dehri-on-Sone
Karamnasha (New)- 21
1 Ramgarh NA New Proposal
Ramgarh(SCDC line)
132 KV Karmnasha (New)- 30
2 Bhabhua 132 KV Nadhokhar-Bhabhua (DCSS) tr. line New Proposal
Bhabhua (D/C) tr. Line
132 KV Dumraon (New)-Piro New Proposal 35
3 Piro 132 KV Bikramganj-Piro tr. DCSS Line
(D/C) tr. Line given by BGCL
Circle-Bhagalpur
Nathnagar 132 KV Goradih (GIS)- 20
1 LILO in 132 KV Sabour-Sultanganj ckt-1 New Proposal
(new) Nathnagar (D/C) tr. line
LILO of one circuit of 132 KV Begusarai-
2 Balia
Bakhri (D/C) tr line at Balia.
132 KV Khagaria (New)-Bakhri
LILO of one circuit of 132 KV Begusarai- New Proposal 30
3 Manjhaul (D/C) tr. line.
Bakhri (D/C) tr line at Manjhaul.
4 Bakhri 132 KV Begusarai-Bakhri (D/C) tr line.
Second circuit LILO

Sl. GSS to provide Tentative Line Length


Proposed 2nd Circuit stringing
No. 2nd Source (CKm)
1 Ekangarsarai 2nd circuit LILO of Biharshariff – Hulasganj 10
TOTAL 10

Proposal for reconductoring of 132 kV S/c SKMCH-Sitamarhi (old) Tr. line with
HTLS eq. Panther conductor.

Sl Name of line Route length(in KM)


no.
1 SKMCH - Belsand 41

2 Belsand - Runnisaidpur 16.5

3 Runnisaidpur - Sitamarhi (old) 20

Total 77.5
JUSTIFICATION
1. Earlier policy decision was taken to construct Grid Sub-stations in each revenue sub-division of Bihar in 12th plan under State
Plan scheme.

2. Out of 30 Revenue Sub-divisions GSS, 18 nos. of GSS are having LILO arrangement and remaining 12 nos. of GSS are single
circuit stringing on double circuit tower (DCSS).

3. The GSS having LILO arrangement are having two source of power from two different GSS. In case of breakdown/ maintenance
of one transmission line the second source is readily available.

4. Remaining 12 GSSs are connected with single circuit transmission line on DCSS (Double Circuit Single Stringing) tower. In Case
of breakdown or maintenance of existing transmission line, Grid Sub-Stations had to shut down which results to total Power
failure in nearby areas. If 2nd circuit stringing is provided then during maintenance and breakdown 2nd source will be available to
the above GSS.

5. Due to single line connection, GSS on DCSS towers may not meet the increased future load demand which will be resolved after
providing 2nd circuit to the above Grids.

6. To avoid ROW issues in future, it is better to provide 2nd circuit stringing at present.

7. By providing the 2nd source of connectivity, reliability and quality of power will improve.

8. Presently, 132 kV S/c Dalsinghsarai – Kushweshwarsthan LILO at 132/33 kV Rosera GSS. There is a proposal for connectivity of
Railway feeders from 132/33 kV Rosera GSS. For providing reliable power a D/c second source from 220/132/33 kV Samastipur
(New) is proposed
Revenue Sub-divisions GSS
Total Capacity
Voltage Level Capacity of MVA Type of
Sl No. Name of GSS Name of Schemes
(KV) Transformer (MVA) connections
132/33 KV
1 Piro(New) 132/33 2X20 40 DCSS
2 Bhabhua (New) 132/33 2X50 100 DCSS
3 Tarapur(New) 132/33 2X20 40 LILO
4 Araria 132/33 2X50 100 LILO
5 Balia(New) 132/33 2X10 20 LILO
6 Teghra (New) 132/33 2X20 40 DCSS
7 Manjhaul (New) 132/33 2X10 20 LILO
8 Bakhri (New) 132/33 2X20 40 LILO State Plan
9 Benipur (New) 132/33 2X10 20 DCSS
10 Chakia (New) 132/33 2X20 40 DCSS
11 Pakridayal (New) 132/33 2X20 40 DCSS
12 Areraj (New) 132/33 2X20 40 LILO
13 Hathua (New) 132/33 2X20 40 LILO
14 Manihari (New) 132/33 2X20 40 LILO
15 Barsoi New) 132/33 2X20 40 DCSS
Revenue Sub-divisions GSS
Total Capacity
Voltage Level Capacity of MVA Type of
Sl No. Name of GSS Name of Schemes
(KV) Transformer (MVA) connections
132/33 KV
16 Jhanjharpur(New) 132/33 2X10 20 LILO
17 Benipath (New) 132/33 2X20 40 LILO
18 Baisi (New) 132/33 2X20 40 LILO
19 Banmankhi(New) 132/33 2X20 40 LILO
20 Dhamdaha(New) 132/33 2X20 40 LILO
21 Belsand (New) 132/33 2X10 20 LILO
22 Pupri(New) 132/33 2X20 40 DCSS
23 Maharajganj(New) 132/33 2X20 40 DCSS
State Plan
Shahpur Patori
24 132/33 2X20 40 DCSS
(New)
25 Rosera (New) 132/33 2X20 40 LILO
26 Triveniganj (New) 132/33 2X10 20 LILO
27 Nirmali (New) 132/33 2X20 40 LILO
Simri Bakhtipur
28 132/33 2X20 40 DCSS
(New)
29 Mahnar(New) 132/33 2X20 40 DCSS
30 Narkatiyaganj 132/33 2X20 40 LILO
List of 132 kV Grid Sub-stations having Single Source power / LILO
dependency on Single Tower
Sl. Particulars Grid Sub-stations Total
No

Bhabhua Piro Mahrajganj Mahnar Pupri Benipur Chakia


2nd Circuit
1
stringing Simri 12
Sahpur Patori Pakridayal Teghra Barsoi
Bakhtiyarpur

2 LILO of 2nd Circuit Ekangarsarai Araria 2


To be incorporated
under existing/
3 proposed project in Narkatiyaganj Nalanda Triveniganj Barh Jandaha Ramgarh 6
order to provide 2nd
source

Katra Mithapur Jhanjharpur Hathua Rosera Sheohar Manihari


Feasible to provide
4 2nd source Balia Bakhri Nirmali Dhamdaha Nathnagar Siwan New Mashrakh 15
connectivity
Belsand
Space/ Spare bay
5 available but Gaighat Tekari Sherghati Manjhaul Khagaria 5
Corridor issue
Space not available Tehta Belaganj Imamganj Rajgir Areraj Banmankhi Ekma
6 for construction of
Baisi 8
132 kV Bays
7 Space not available Tarapur Karbigahiya 2
& corridor issue

TOTAL 50