CDM Presentation
24 May 2016
Agenda
1. Project Description
• 45km Expressway
• 4 Interchanges
• Connects with East-West Corridor in the north and Qatar Economic Zone
(QEZ) in the South intersecting Wukair Road and Mesaieed Road
• Pedestrian/Cycle Underpass
• 9 cycleway/pedestrian underpasses
KBR AECOM
Ashghal
(PMC) (Supervisory Consultant)
WSP
(Designer)
Algosystems (ITS)
J&P
(Design & Build
Contractor)
Makeover (Artscape)
KBR
AECOM
J&P
• Client – PWA
Management of the Project
Provision of Information
Appointment of competent organisations
• Engineer – KBR
Advise the Client
Provision of Information
Ensure cooperation between the parties
Ensure the parties carry out their duties
Prepare the Health & Safety File
QCS 2010 Responsibilities
• Contractor – J&P
Operate a safe site
Liaise with the other Duty Holders
Ensure adequate welfare facilities
Ensure relevant risks are communicated to construction
teams
Provision of information to others to carry out their Duties
Project Health, Safety & Environmental (HS&E) Procedures and reporting structures
Design Outcomes
Construction Outcomes
Shop Drawings and Specifications, H&S Registers, SHE Boxes, Method Statements
PLANS
Design Integrity Plan
• Submitted in March 2014
• Used by all the design disciplines
and Sub-consultants
• Section 12 – Project Health, Safety
& Environmental
Health & Safety Plan
Stage Held on
Preliminary Design Weekly Meetings between
WSP & J&P to go through
design issues
Detailed Design Weekly Site Meetings
between WSP &J&P to go
through design issues. WSP
Site Support team also
involved
PD and DD Stages
• MoMs
• Updated Risk Register
Description
Type of Risk (i.e. Approvals)
Probability
Cost Impact
Mitigation Measure
Risk Mitigation Owner
Post Mitigation Risk Factor (Score *
Impact)
Resolution Date
Status (i.e. Open/Closed)
PD and DD Stages
RSA process
• Independent and Approved Third
Party Road Safety Auditors
• Carried out at
• Stage 1 – Concept / Pre Tender
• Stage 2 – Detailed Design (In
Process)
• Stage 3 – During Construction
• Stage 4 – Construction Opening
Permit (To be carried out)
Design Reports
• Design Reports for each section
of the design
Highways
Structures
Utilities, etc
• Report includes
Specific Chapter on Health
& Safety
H&S Registers residual risks
action and Mitigation measures
Where risks are managed
Contractor, Operator, Owner
Notes on Drawings
• Managed by the Discipline Leaders
• Specifications
Construction Outcomes
SHE Boxes
Construction Outcomes
Method Statement
• Safe Work Procedure
for Lifting
Construction Outcomes
Method Statement
• Lifting Activities
Construction Outcomes
Issue
Measures
• Change in the design speed from
120kph to 80kph at the approach to • Apply speed management strategy.
QEZ3 . • Departure 7 Raised
Example – Horizontal Radius
Issue Measures
• Sharp horizontal curvature on ramps • Provide safety barriers at identified
from the expressway preceded by locations
long straight alignment may cause
drivers to lose control of the vehicles
which may lead to vehicle overturn.
AFTER
BEFORE
Measures
• To avoid any safety issues associated with the disconnection and removal of these cables it was
imperative that early detailed communication relating to shut down periods happened with
Kahramma Electric. This allowed an early definition in the programme as to when the safest
periods would be to avoid pedestrians and the measures that needed to be in place to ensure the
safety of the workforce
Structures
Example – QP Culverts
Example – Lifting
Issue Measures
• Unsafe lifting devices for • Precast element weights noted
precast elements i.e. QP on drawings
Culverts
• Lifting requirements noted on
drawings
• Referenced in SHE BOX
Example - Lifting
Example - Lifting
Example - Lifting
Example - Lifting
Example - Lifting
Example - Lifting
Example – Use Of Chemicals /
Environmental Impact
Risk Assessment: Prime Coat Application
Example – Scaffold Erection / Working
at Height
Questions