INTENDED TO DETERMINE THE ACTUAL CONDITION OF THE GAS TURBINE, TOGETHER WITH THE MEASURES REQUIRED TO PRESERVE / RESTORE THE SPECIFIED CONDITION” IMPACT ON QUALITY OF MAINTENANCE
• ADOPTING MANUFACTURER’S RECOMMENDATION
• PROPER PLANNING OF INSPECTIONS • AVAILABILITY OF DOCUMENTS AND INSTRUCTIONS • AVAILABILTY OF TOOLS • STOCKING AND PROCUREMENT OF SPARES • REPLACEMENT OF WORNOUT SPARES INSTEAD OF REPAIR • WORKING CONDITIONS AND SKILLED WORK CREW • ACCESSIBILITY OF OEM’S TECHNICAL SUPPORT HOT GAS PATH INSPECTION
•GT #11 06-12-2002 to 15-02-2003
•GT #12 02-05-2003 to 27-05-2003
ROTOR UPENDING TIE ROD COLLAR CONSTRUCTION • Gas Turbine: SIEMENS make V94.2 • Rating: 137.7 MW at ISO Conditions • Turbine: 4 Stages • Compressor: 16 Stages • Combustion Chamber: 2 SILO type with eight Burners in each HOT GAS PATH INSPECTION ORIGINAL INTERVAL : 25,000 EOH TO ENSURE BASE MATERIAL WAS NOT DAMAGED AND SUBSEQUENT REFURBISHMENT ALLOWED
REVISED INTERVAL: 33,000 EOH . MOVING ROW
1 AND 2 NO LONGER REFURBISHED HGPI INVOLVES DISASSEMBLY COMBUSTION CHAMBERS DISASSEMBLY OUTER CASING REMOVAL OF TURBINE STATIONARYBLADE CARRIERS REMOVAL OF TURBINE ROTATING BLADES STAGE 1 AND 2 Activities to be carried out HGPI Components Measure HGPI Major inspection 1. Turbine blades Moving blade row 1 & 2 Replacement Yes Yes Moving blade row 3, stationary Refurbishment Yes Yes blade rows 1 & 2
Moving blade row 4, stationary NDE Yes Yes
rows 3 & 4 Activities to be carried out HGPI Components Measure HGPI Major inspection 2. Compressor blades Coated rows Refurbishment No Yes
Uncoated rows NDE, Visual No Yes
inspection Components Measure HGPI Major inspection 3. Stationary blade carriers Turbine NDE, Visual Yes Yes inspection Compressor NDE, Visual No Yes inspection Activities to be carried out HGPI Components Measure HGPI Major inspection 4. Casing hot gas path boundary items Inner casing Regenerative heat treatment No yes Mixing casing Regenerative heat treatment No yes Combustion chamber tiles Replace in the event of negative Yes Yes (flame tube) findings
7. Control Function test, pressure/ leak test, Yes Yes
condition based repair or equipment, piping replacement Magnetic Particle Inspection Hirth Coupling of Turbine as well as compressor disc Compressor vanes and blades Tie Rod Matching grooves of Damping rings Transition of aerofoil to bearing of IGV Ultrasonic Testing Gas Distribution Pipings and Spider Arms Transition of aerofoil to hook of compressor vanes Inner casing & Mixing Chamber walls Dye Penetrant Test Bearings / Thrust Pads K-Ring All weld seams Tile Holders in combustion chambers Stationary & Rotating blades of Turbine Stage #3 & #4 Grooves of Turbine Rotor Disc Stage #1 & #2 Major Observations Cracks in turbine stationary vanes stage 3 and stage 4 lower half Coating abrasion in compressor blades Cracks in right side of inner casing Dent marks in inner casing seal ring Wear in cooling ring of mixing chamber Gap in compressor stationary vane transition hook has increased. Observations contd… Maximum replacement was required in A row tiles of combustion chamber. VIEW OF DAMAGED TILES AND TILE HOLDERS BOROSCOPIC INSPECTION OF FUEL OIL BURNER