Weekly Progress Report Presentation

Development of nano material enforced gel systems for water and gas shut off in carbonate
reservoirs
Presented By:
Subhrajyoti Bhattacharyya
Designation: Research Fellow
Department of Petroleum Engineering
IIT(ISM) Dhanbad
Jharkhand,India
Date of Presentation : 14/07/2019
Under the supervision & guidance of:

Dr. Vikas Mahto


Professor
Department of Petroleum Engineering
IIT(ISM) Dhanbad
Jharkhand,India
ACKNOWLEDGEMENT

 Dr. Vikas Mahto,Professor,Department of Petroleum Engineering,IIT(ISM)


Dhanbad,Jharkhand,India
OUTLINE

 Water Shut Off


 Water Cut
 Causes
 Problems
 Methodology
 Identification of Problem
 Remedial Measures
 Literature Survey
 Planning for next week
 Water Shut off : Shutting or reducing water
production in oil or gas wells than cause reduction or
hindrance or block hydrocarbon production.
 Water cut : It is the ratio of water produced
compared to the volume of total liquids produced.
CAUSES

 Channels behind casing.


 Barrier breakdowns.
 Completions into or near water.
 Coning and cresting.
 Channelling through higher permeability zones or
fractures.
 Fracturing out of zone.
PROBLEMS

 Decline in potential oil production.


 Corrosion.
 Scale/salts deposition.
 Gas hydrate formation.
 Hydrocarbon solids deposition (asphaltenes and
waxes).
 Disposal of the water itself.
METHODOLOGY
 Initial study on the oilfield, its geology and production performance to
understand the condition of the field.
 Location of the target well and analyse its production performances,
derivative plots to identify the cause of high water production.

 Analysis of the production performance and derivative plots to correlate the


conditions of the well.

 Analysis of the formation evaluation logs to identify the problem zone.

 Study on the history of the well to understand the present condition.

 Water shut-off job done on the target well and its current condition and
recommendations for further analysis.

 Laboratory analysis on the polymers alongwith cross linkers used in the


field to examine its gelation time and gel consistency.

 Recommendations for prevention of high water cut problems and revival of


the target well.
IDENTIFICATION OF PROBLEM

 Conventional Plots
 Diagonostic Plots
REMEDIAL MEASURES

 Water shut off jobs.


 Chemical Methods Water shut off jobs.
 Mechanical Methods Water shut off jobs.
 Mechanical isolation.
 Isoflow Placement.
 Dual Injection.
LITERATURE SURVEY

 A Successful water shut off treatment in Gas Well of


Bassein Field by Polymeric Gel System.
 Investigation of gel polymer as the water shut off in
oil reservoirs by Milad Jadidoleslami*,Ali Rahimi ,
Farshad Farahbod.
 Successful Chemical Water Shut-Off Treatment in
an Omani Field Heavy-Oil Well.
 Dissertation reports from M.Tech in ongc fields.
PLANNING FOR NEXT WEEK

 My next week planning is to do literature survey on


laboratory analysis of water shut off techniques and
on nano material reinforced particle gel systems.