• Increased profitability
Six Sigma
Design for Six Sigma: for designing new processes and products
A problem solving method that is a roadmap which can be used for any
projects or quality improvements that needs to be made.
Because:
The Define Phase is the first phase of the Six Sigma improvement
process. In this phase, the leaders of the project create a Project
Charter, create a high-level view of the process, and begin to
understand the needs of the customers of the process.
In the Control Phase, the team begins to document exactly how they
want to sustain improvements by passing process improvement
infrastructure on to the employees who work within the process.
PROJECT CHARTER
TITLE Managing and Enhancing Quality of our Product Simobo by reducing the number
of support issues and non-conformities.
BUSINESS CASE The IT industries have a lot of work in their domain but the satisfied customers
are achieved only by High Quality
Products This can only be achieved by
o Increased Quality Service Time
o Reducing Cost (Development and
Maintenance)
PROBLEM STATEMENT Confiz Solutions is committed to provide cost effective and efficient solutions to
their customers. This can be achieved by Enhancing Quality of Simobo by
reducing the number of support issues and non-conformities
Experience
Bugs
LOC
Domain Ramp up Missing features Poor quality app 10 Wrong time estimates 1 Increased no of resources 0 0 Add cushion time in estimates, Usman
Start domain ramp up at requirement elicitation
phase
Requirement Missing requirements Design is not according to 6 Negligence, 1 Increased no of resources 0 0 Involve QA at this stage Aymen
Analysis requirements No Requirement Document requirements properly
documentation
Insight to Design No traceability of Cosmetic defects in App 9 PSD’s not 1 Requirements mapped manually 0 0 Make sure to provide PSD’s in domain ramp up Aymen
Specificatio ns requirements provided/overlooked
UI Testing Incomplete elements Poor user interface with low 8 Negligence 2 Reviews by mentors 1 16 Trainings Aymen
exploration usability Test scenarios missing
Functional Incomplete Requirement Non confirming products 10 Time bounds 1 Increased resources 2 20 Prepare Requirement traceability matrix Aymen
Testing Analysis Neglecting Reviews by mentors
Requirements/featur
e
Integration Incomplete product Customer dis-satisfaction 10 Incomplete domain ramp 2 Increased resources 3 60 Prepare Sanity checklist Aymen
Testing up/feature exploration
Defect logging Defects not logged/ Incomplete fixation 5 Lack of 1 Unit testing 0 0 Comm. Skills Training Aymen
Ambiguous Description training/communication Increase resources
issues
Defect Ripple effect/ regression Bugs in App 8 Negligence 1 Cross check by other resource 0 0 Correct estimates for testing of a sprint/build Aymen
Verification testing missing No time for Halo testing Increased resources
Defect closing Closed without verification defective product 9 Time bounds 1 Verification by Pm 0 0 Review after build or sprint Aymen
Negligence
Defect Reopening Reopened without verification Development overhead 6 Incomplete testing 1 Verification by Pm and Unit testing 0 0 Review after build Aymen
resource wastage Misunderstanding by Dev.
Arooj Un Nisa Process
Engg.
Arooj Un Nisa Process
Engg.
Little Cast-Sigma Level
Defects Opportunities Total Units DPU DPO DPMO Yeild Sigma Level