Académique Documents
Professionnel Documents
Culture Documents
LIU-PSB Scope
T. Birtwistle (EN-ACE-CL)
2018-05-22
LIU-PSB LS2 ECRs
Multiple Groups
Description Group Responsible ECR Reference ECR Status
TE-ABT
Upgrade of the PS Booster extraction lines
(input from Wolfgang Bartmann Needed
BT, BTM and BTP
others)
SRR’s approved:
Magnet modifications in BT, BTM and BTP
TE-MSC Antony Newborough PSB-LJ-EC-0010
(including BT.BHZ10 and BTM.BHZ10) PSB-LJ-EC-0011
Beam instrumentation modifications in BTP
line (LIU related BTV changes in BT line BE-BI Lars Soby
already covered by a separate ECR)
Installation of new BLMs on the PS Booster
BE-BI Christos Zamantzas
extraction lines
Edouard Grenier-
EN-STI beam stopper in BTP EN-STI
Boley
2018-05-22
LIU-PSB LS2 ECRs
Multiple Groups
Description Group Responsible ECR Reference ECR Status
Add a new BPM on the BI line (upstream of TE-ABT, Christoph Hessler SRR approved
PSB-LJ-EC-0013 Needed
BI.SMV10) BE-BI Lars Soby
Multiple Groups
Description Group Responsible ECR Reference ECR Status
Modifications to the Booster extraction main TE-MSC,
Antony Newborough
unit and BT1/4.BVT10, BT2/3.DVT10 (upto TE-VSC, Needed
Jose Somoza
the BPMs) BE-BI
2018-05-22
LIU-PSB LS2 ECRs
TE-ABT
Description Group Responsible ECR Reference ECR Status
2018-05-22
LIU-PSB LS2 ECRs
TE-MSC
Description Group Responsible ECR Reference ECR Status
Upgrade of the BHZ Main unit bending
Antony In work
magnets (including injection bending TE-MSC
Newborough (integration needed)
magnet and reference magnet)
Damping Resistors on PSB Bending and Quad Antony 1817987 Under Approval
TE-MSC
Magnets Newborough PSB-M-EC-0001 (studies ongoing)
2018-05-22
LIU-PSB LS2 ECRs
TE-EPC
Description Group Responsible ECR Reference ECR Status
Booster extraction septa transformers Jean-Marc S. Pittet confirmed no
TE-EPC
modifications (in tunnel) Cravero change to volume
1643409
New MPS for LIU Booster (POPS-B) TE-EPC Fulvio Boattini Released
PSB-LJ-EC-0008
Consolidation and upgrade of the power 1851780
TE-EPC David Nisbet Released
converters of the LT and LTB lines PSB-R-EC-0006
2018-05-22
LIU-PSB LS2 ECRs
BE-BI
Description Group Responsible ECR Reference ECR Status
New BLMs Installation in the LT, LTB and
BE-BI Christos Zamantzas Needed
BI Lines for H- exchange monitoring
1962159 In work
8 Wire Scanners in the PSB 4L1 and 11L1 BE-BI Raymond Veness
PSB-BWSRA-EC-0001 (integration ongoing)
1572803
Relocation of BI.BTV30 BE-BI Stephane Burger Released
PSB-LJ-EC-0006
Relocation of BT2.BTV10 and BT3.BTV10 1494819
BE-BI Stephane Burger Released
in the PS Booster PSB-LJ-EC-0002
Plus contribution of information for the BT, BTP Line, the new BPM in the BI Line, and extraction line BLMs
BE-RF
Description Group Responsible ECR Reference ECR Status
Approved, but
The New PS Booster RF System (Finemet 1733551
BE-RF Mauro Paoluzzi integration model to
Cavities) PSB-ACWFB-EC-0001
be updated
2018-05-22
LIU-PSB LS2 ECRs
EN-STI
Description Group Responsible ECR Reference ECR Status
In work
Consolidation of the Booster cooling plant EN-CV Gabor Petrika Draft only so far
(integration needed)
2018-05-22
LIU-PSB LS2 ECRs
EN-ACE
Description Group Responsible ECR Reference ECR Status
Under Approval
(final verification of
1688400
Partial dismantling of Linac2 EN-ACE Aurelio Berjillos equipment
CPS-LJ-EC-0003
responsibilities
ongoing)
Ready, but to be
1688387 approved at the same
Connection of Linac4 to BHZ20 EN-ACE Aurelio Berjillos
CPS-LJ-EC-0002 time as:
CPS-LJ-EC-0003
2018-05-22
Thanks for your attention