2- Test
2.1- Equipment Power ON/ OFF and Setting
2.2 Antenna Orientation
1- INSTALLATION
1.1 PREPARATION
1- INSTALLATION
1.2 INDOOR INSTALLATION
120 Ohm
75 Ohm
NESIC CAIRO
(2) IDU Mounting
IDU Type Samples
4x2MB (75 & 120 Ohm Interface)
NESIC CAIRO
Fix each side of
the IDU to the
rack with the two
screws.
NESIC CAIRO
To mount the IDU in a 19-
inch rack, allow space more
than 200mm to the rear
section and space for one
unit to the top and bottom
NESIC CAIRO
(3) Cable Connection and Wiring
-Fix the DDF Frame and 2M termination Block (terminal Block, 75 Ohm
DDF or any other …)
-Proceed the 2M wiring
-Connect the other cables as shown in next Page
NESIC CAIRO
4-
Connect
(3)Wiring
the IF 6-Put 5-Connect
Cable the the Power
Label Cable
s
2-Connect the
frame Earthing 3-Connect
the 2M Cable 1-Fix the 4
screw (2 for
each side)
NESIC CAIRO
NEC Pasolink Radio Training course
1- INSTALLATION
1.3 OUTDOOR INSTALLATION
NESIC CAIRO
1-OUTDOOR
Unpacking of Unpacking Unpacking of
INSTALLATION Accessories of ODU Antenna
FLOW CHART
Follow The
termination Procedure ODU
Mounting Refer to the Antenna
assembling guide
Refer to the IDU fixing IF Cable
Procedure Photos Connection
NESIC CAIRO
NESIC Cairo Training Center
Frequency
Band
ODU Check Points
Serial No
Also you have to check :-
Frequency
Type High
Sub Band
OR Low
NESIC CAIRO
Antenna Check Points
Type
Diameter
Frequency
Serial No
NESIC CAIRO
3.(V-H) Polarization Setting
H to top
Note the
Position
Groundi
ng Cable
IF Cable Connection
Connecti
ng point
NESIC CAIRO
6-Cables connections and laying
3- Carefully lay the IF cable going
to the IDU
4- Be sure there is no sharp
pending in the IF cable rout.
NESIC CAIRO
NEC Pasolink Radio Training course
1- INSTALLATION
1.4 Cable Termination
1.4.1 IF Cable Termination
NESIC CAIRO
Luck Nut
Washer
Gasket
Clamp A
Clamp B
Insulation
Center Conductor
Connector Shell
NESIC CAIRO
IF Cable Termination
1-First, Fit the Lock Nut, Washer
and Gasket on the Cable as
shown
Gasket
washer
Lock Nut
NESIC CAIRO
2-Strip Back the cable
sheath,
taking care not to
damage the braided
shield.
Fit Clamp A
NESIC CAIRO
3-Fold back the Braided
shield,
Separating the strands of
the braid. Cut the
extra length,
to fit to
Clamp A
NESIC CAIRO
4-Cut away the insulation
from the center
conductor and fit the
clamp B.
NESIC CAIRO
5- Cut the center conductor to fit
the connector center contact
(~1.2cm). Taper the end of the center
conductor using a file
6- Mount the center contact onto
the center conductor
Insulation
7- Mount the Insulation onto the
center contact.
NESIC CAIRO
8-Insert the cable into the
connector shell
NESIC CAIRO
10- Check the connector-cable
continuity suing multemeter.
1- INSTALLATION
1.4 Cable Termination
1.4.2 Power Cable Termination
Socket Contact
Power
Cable
NESIC CAIRO
5-Squeeze the
handle of the hand
crimping tool until
ratchet Is released
NESIC CAIRO
Power Connector
The Connector is ready to use
NESIC CAIRO
NEC Pasolink Radio Training course
2-TEST
Refer to Start Up
Procedure 3-IDU Start Up
NESIC CAIRO
Visual Inspection
Visual Inspection purpose is to insure all installation
and wiring work were done in proper way
1-Check the appearance and label
2-Check the ODU &Antenna frequency based on
frequency plan
3-Check the fixing way of rack and equipment
4-Check the cable connection and power Polarity
NESIC CAIRO
2-DC input Voltage value & Polarity
1-Check the DC input voltage in IDU is connected correctly
and in the accepted range
Power requirement: +/- 20 to +/- 60
Or (+/-20 to +/- 72)
Please refer to your equipment Instruction manual
Confirm the
Polarity before
insert the power
Cable
-+
NESIC CAIRO
3- IDU Start up
1-Be sure the power cable and IF cable are connected in
Proper way
2- Carefully Poll out the Power On / Off toggle switch and put
in ON position.
2- To shutdown the IDU switch the toggle switch to Off
Position
NESIC CAIRO
HyperTerminal setting
1- Double click HyperTerminal icon and follow the instructions
Type your
Connection
Name
PTT
2-Data Bits
8
3-Parity
None
4-Stop bits
2
5-Flow Control
6- Press OK
Hardware
NESIC CAIRO
HyperTerminal setting
From File menu select “ Properties”
1-Select
“windows
4-Select “Send line keys”
ends with line feed”
2-Select
“VT100”
VT100
500
3-Press
“ASC II setup
5-Select
“Append line …” 7- OK 8- OK
NESIC CAIRO
then OK
IDU Setting
Connect your PC to the IDU using supplied RS232 cable.
Start up your HyperTerminal connection
Follow the Commands as
– Press Ctrl+D
– You will be requested to enter password, Press enter directly
– You will be asked to change password, you can change or keep it
none
– From main menu you can select any of:
1-Setting 2-Maintenance 3-Monitoring 4-Exit
Password
1-Setting
2-Maintenance
4- Exit Double
3-Monitoring
Click
NESIC CAIRO
IDU Setting
This setting is just for test purpose
For more details, please refer to instruction manual
From Setting menu you have to set the following.
1-Bit Rate
4- TX/RX
Frequency CH
5- TX Attenuation
9- Frame ID
NESIC CAIRO
IDU Setting
From Main menu select Monitoring menu (No.3)
Select No.3 “Inventory” to insure the equipment type,
inventory,..
Start your antenna orientation and link test.
2- Alarm/Status
3- Inventory
4-Main Menu
NESIC CAIRO
NEC Pasolink Radio Training course
Pasolink
Pasolink Monitor Monitor
connecting point
NESIC CAIRO
NEC PAOLINK TRAINING MANUAL
ANTENNA ORIANTATION
THANK YOU