Lesson 2A
Drilling Systems
Drilling Rigs
Drilling a Well
Homework
Read ADE to p. 21
CHAPTER 1 (ADE)
Drilling Team
Drilling Rigs
Rig Power System
Hoisting System
2A. Rigs, Circulating System . . .
Drilling a PETE 411 Well
Well Drilling Slide 3 of 53
Rotary Drilling - cont’d
2A. Rigs,
Examples
Drilling a PETE 411 Well
Well Drilling Slide 4 of 53
The Rig Count
2A. Rigs,
From the Houston Chronicle, August 2001, 2002 and 2003
Drilling a PETE 411 Well
Well Drilling Slide 5 of 53
From
2A. Rigs,the Houston Chronicle, Sunday, September 1, 2002
Drilling a PETE 411 Well
Well Drilling Slide 6 of 53
2A.From
Rigs, the Houston Chronicle, Sunday, August 31, 2003
Drilling a PETE 411 Well
Well Drilling Slide 7 of 53
Noble
Drilling’s
Cecil
Forbes
A Jack-
Up Rig
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 8 of 53
Sonat’s A Semi-
George Submersible
Washington Rig
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 9 of 53
Zapata’s
Trader
A
Drillship
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 10 of 53
Deep Water Development Options
SUBSEA FIXED
COMPLETIONS PLATFORMS
COMPLIANT
TOWERS
FLOATING TENSION
PRODUCTION LEG
2A. Rigs, SYSTEMS PLATFORMS
Tension
Leg
Platform
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 14 of 53
Shell’s
Bullwinkle
World’s tallest
offshore
structure
1,353’ water
depth
Production
began in 1989
45,000 b/d
80MM
2A. Rigs,scf/d
Drilling a PETE 411 Well
Well Drilling Slide 15 of 53
To TENSIONERS
SLIP JOINT
MARINE
RISER
GUIDE LINES
BOP STACK
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 18 of 53
Fig. 1.5
P=F.V
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 20 of 53
TABLE 1.1 - HEATING VALUE
OF VARIOUS FUELS
wf = 3.78 lbm/min.
Qi = w f H
3.78 lbm/min 19,000Btu/lbm 779 ft - lbf/Btu
Qi
33,000 ft - lbf/min/hp
Thus, the overall efficiency of the engine at 1,200
rpm given by Eq. 1.3 is
P 397.5
2A.E t
Rigs, 0.234 or 23.4%
Drilling a
Qi 1695.4
PETE 411 Well
Well Drilling Slide 24 of 53
Drilling a Well
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 28 of 53
Steps to Drill a Well - cont’d
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 29 of 53
Drilling Operations
Field Engineers, Drilling Foremen
A. Well planning prior to SPUD
B. Monitor drilling operations
C. After drilling, review drilling results and
recommend future improvements
- prepare report.
D. General duties.
What are the well requirements?
Objectives, safety, cost
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 30 of 53
Making Making
a a
Connection Trip
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 31 of 53
2A. Rigs,
Drilling a Making aPETE
mouse411hole
Wellconnection
Well Drilling Slide 32 of 53
Moving Kelly
to Single in
Mousehole Single
Added.
Stabbing Ready to
the Pipe Drill
2A. Rigs,
Making
Drilling a a mouse
PETE hole
411connection
Well - cont’d
Well Drilling Slide 33 of 53
Making a trip
Why
trip?
Use
Elevators
Put Kelly in
for
Rathole
tripping
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 34 of 53
Tripping
one stand
at a time
60-90 ft
2A. Rigs,
Drilling a PETE 411 Well
Well Making a trip - cont’d
Drilling Slide 35 of 53
Criteria for determining
depth limitation
Derrick
Drawworks
Mud Pumps
Drillstring
Mud System
Blowout Preventer
2A. Rigs, Power Plant
Drilling a PETE 411 Well
Well Drilling Slide 36 of 53
T W
T W
W W
2W
• FIG 1-1 Simple Pulley System
T=W
2A. Rigs, LD = 2W (no friction in sheave)
Drilling a PETE 411 Well
Well Drilling Slide 37 of 53
n = number
of lines
W = weight
(hook load)
LD = load
on derrick
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 40 of 53
Solution, cont.
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 42 of 53
Projection of
Drilling Lines
on Rig Floor
2A. Rigs,
Drilling a PETE 411 Well TOTAL
Well Drilling Slide 43 of 53
Load on Derrick
(considering friction in sheaves)
Derrick Load = Hook Load
+ Fast Line Load
+ Dead Line Load
Fd = W + Ff + Fs
W W 1 E En
Fd W = W
En n En
2A. Rigs,
Drilling a E = overall efficiency,
PETE 411 Well
e.g., E = en = 0.98n
Well Drilling Slide 44 of 53
Example 1.2
W 300,000
F 44,590 lb
E n 0.841* 8
2A. Rigs,
Drilling a ( 0.98
PETE 4118 =Well
0.851 )
Well Drilling Slide 47 of 53
Solution
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 48 of 53
Solution
Ph
vb
W
33,000 ft - lbf / min
420.5 hp
hp
300,000 lbf
2A. Rigs,
Drilling a = 46.3 ft /411
PETE minWell
Well Drilling Slide 49 of 53
Solution to 3., cont.
90 ft
t 1.9 min.
46.3 ft / min
2A. Rigs,
Drilling a PETE 411 Well
Well Drilling Slide 50 of 53
Solution
1 E En
Fd W
En
1 + 0.841 + 0.841(8)
= (300,000)
0.841(8)
2A. Rigs, = 382,090 lbf.
Drilling a PETE 411 Well
Well Drilling Slide 51 of 53
Solution
n4 8 4
Fde W * 300,000
n 8
W W
FDLL
4 n
F
2A. Rigs, de 450, 000 lbf n 4
FDLL W
4n
Drilling a PETE 411 Well
Well Drilling Slide 52 of 53
Solution
Fd 382,090
Ed
Fde 450,000