Background of the Study
TYPE COLORS
EMPERADOR TRANSPARENT
Pulverized Glass
Bottles 0% 10% 20% 30%
In each set-up, the proportions will be
mixed separately, and the mixing is done
manually. After mixing the aggregates, it is
then placed in the hollow block molder,
pounded to make the aggregates compressed,
then remove the molded aggregates from the
molder.
Table 4. Curing Time of Concrete Hollow Blocks
Set-up 1 2 CHB
Set-up 2 2 CHB
Set-up 3 2 CHB
Set-up 4 2 CHB
The concrete hollow blocks will be
laid under the sun by set-up for the
curing time. Furthermore, there will
be a total of 8 concrete hollow blocks
that will be dried for 14 days.
Data Analysis