Nokia Site SW Update &

Commission
Introduction

 This Presentation contains site SW Update Steps & Commission Steps for TE
Nokia Site LTE & how to configure Ret for Site
Table Of Contents

 Configuring Laptop with Needed configuration to be connected to


Enode B
 How to login to site
 SW Update From FDSW1.0 To LN 7
 SW Update from LN 7 to FL16
 Commissioning step with XML file
 RET HW installation
 RET Commissioning
Configuring Laptop with Needed configuration to be
connected to Enode B
1. First of all your laptop ip must be adjusted on node be network>>>Click on start
>>>click on control panel >>>click on network and internet then>>> click on network
and sharing center >>> change adapter settings then click on local area connection
How To log In Site
 Then Run Site Manager
 Use log in info( user name : Nemuadmin & password: nemuuser)
SW Update From FDSW1.0 To LN 7

 After log in choose software dropdown menu>>>>>Then click on Update


SW to BTS site
SW Update From FDSW1.0 To LN 7

 Then click on select then browse


SW Update From FDSW1.0 To LN 7
 Then choose the update file (TargetBD_LN7.0_ENB_1407_581_74.xml)>> Open
SW Update From FDSW1.0 To LN 7
 Then click Update
SW Update From FDSW1.0 To LN 7
 Then Wait till SW Update Load & Complete
SW Update From FDSW1.0 To LN 7
 Sw Update Completed
SW Update from LN 7 to FL16
 After doing same Steps & Choosing SW Update file
(TargetBD_FL16_ENB_0000_001308_000000.xml)
SW Update from LN 7 to FL16
 After SW Update Completed
Commissioning step with XML file
 Select Commission side Menu
Commissioning step with XML file
 Select planned Commission Type
Commissioning step with XML file
 Choose Select >>> Browse
Commissioning step with XML file
 Choose Commission file from your Its Location In Drivers>>>> Open
Commissioning step with XML file
 Send Parameters >>> Site will Send Parameters >>Activating Parameters
>>then Reset & next will appear press next till finish then commission
completed
Site After Commission
RET HW installation
Install Ret Control Cables Between RFM Should Be FXED First RFM RET port to
Sector 1 Input And from out put sector 1 To Input sector 2 & From output Sector
3 to Input sector 3
RET Commission
 After Correct HW connection There is Antenna line device (ALD) appears in
Site Sw
RET Commission

 Rigger On Tower Will Collect RET Devices S/N for Each Sector
 Then write down the S/N for each sector to make sure that in commission
every sector will be in its place
 Click Commission Tape , Choose Reconfiguration Then Next to reach RET
Settings1/2 page 28/36
RET Commission
 Each Sector will have 5 Ret to be commissioned
 Antenna ports Is
 R1 low band connected to FRPA,
 Y1 High band connected to FXED 1.1.1
 Y2 High band Connected to FXED 1.2.1
 Y3 NOT CONNECTED
 Y4 NOT CONNECTED
RET Commission
select 1st Sector Serial number Ret And make its configuration

Y3 IS NOT CONNECTED SO it
selected as other BTS

Sector 1 S/N

Write here Sector number


& its port in antenna
RET Commission
select 1st Sector Serial Number Ret And make its configuration

RFM Port that Connected to


Sector 1 Y1

Y1 Is connected to FXED 1.1.1


So it Selected to be this BTS

Sector 1 S/N

Write Here Sector


Number & antenna
Port & RFM port
RET Commission
select 1st Sector Serial Number Ret And make its configuration

RFM that Connected


To sector 1 R1

Sector 1 S/N

R1 Is connected TO FRPA 1.3.1


So it Is selected to be This BTS

Write here Sector number &


antenna Port & RFM port
RET Commission
select 1st Sector Serial Number Ret And make its configuration

RFM that Connected


To sector 1 Y2

Sector 1 S/N

Y1 Is connected TO FXED 1.2.1


So it Is selected to be This BTS

Write here Sector number &


antenna Port & RFM port
RET Commission
select 1st Sector Serial Number Ret And make its configuration

Y3 IS NOT CONNECTED SO it
selected as other BTS

Sector 1 S/N

Write here Sector number


& its port in antenna
RET Commission
 Select 2nd Sector Serial number Ret & make its Configuration

Sector 2 Y3 not
connected to RFM

Sector 2 S/N

Write Here Sector Number & its


port In antenna
RET Commission
 Repeat the same Procedure for the rest of RET Till Next appears & all ret
Appears On the right >> Send Parameters >>> Finish
RET Commission
Ret Calibration

 Choose Antenna menu >> Ret Setting


Ret Calibration
Mark on Calibrate >>> send