REQUIREMENTS LIFE CYCLE MANAGEMENT

UNIQUE REQUIREMENTS REQUIREMENT DESCRIPTION


ID
B1 Charging station Includes all of the hardware and software that ensures energy is transferred
infrastructure from the electric grid to the vehicle. It can be categorized by location, power
level and charging time strategy.
B2 Smart grid Smart grids introduce a two way dialogue where electricity and information
can be exchanged between the utility and its customers. Its developing network
of communication, controls new automation technologies and tools working
together to make the grid more efficient, reliable, secure and greener.

B3 Load management Smart chargers: Mass charging stations at workplace controls how much each
vehicle gets charged based on current load and the presence of other vehicles
in the station.
Swapping system of batteries can also be thought of.
B4 Service stations Exclusive centers for repair and maintenance.

B5 Solar power Integrated on the vehicles

B6 E vehicle application Navigates to the nearest station indicating the battery condition (For how long
it will run)
MoSCoW PRIORITIZATION
S. REQUIREMENTS MoSCoW
NO PRIORITIZATION
1 Charging station infrastructure Must have
2 Smart grid Must have
3 Load management Should have
4 Service stations Should have
5 Solar power Could have
6 E vehicle application Could have
7 Many skilled labours at the station Won’t have
IMPACT ANALYSIS
S.NO POSSIBLE RISKS CONSEQUENCES IMPACT MITIGATION
1 Lack of infrastructure Poor/inefficient High
infrastructure might cause
chaos such as high waiting Partnering with
time at the station established chains
2 High Capital Infrastructure and High like Shell and ABB
operational efficiency will be
affected
3 Switching cost To convert existing
gasoline cars to EVs
to reduce switching
costs.
People might stick to the gas
vehicles thus creating a loss
4 Ambiguity in acceptance Medium Market Research
for the E-vehicles and
charging stations companies pointed out that
51% of the people
are ready to switch.
The rest can be
given awareness.
5 Threat of foreign entrants Domestic companies will Medium The government
CHANGE READINESS
90

80

70

60

50

40
78%
30
51% 54% 50%
20
48%

10

0
PEOPLE PHYSICAL RESOURCES ORGANIZATIONAL WORK PROCESS TECHNOLOGY/SUPPORT
SYSTEMS RESOURCES