Project Proposal

For the Building


of School
Auditorium
INTRODUCTION
Funding Agencies
1. Department of Public Works and Highways (DPWH)
-executive department of the Philippine government
-mandate to be the “State's engineering and construction arm”
-it is “tasked to carry out the policy” of the State to “maintain an
engineering and construction arm and continuously develop its technology, for
the purposes of ensuring the safety of all infrastructure facilities and securing for
all public works and highways the highest efficiency and the most appropriate
quality in construction”

3
-responsible for “the planning, designing,
construction and maintenance of infrastructure
facilities, especially national highways, flood
control and water resources development
systems, and other public works in accordance
with national development objectives,” provided
that, the exercise of which “shall be
decentralized to the fullest extent feasible.”
4
2. Local Government Units (LGU)

- provide supplementary funding support to public basic


education because they have access to a sustainable source of financial
resources that are earmarked for the basic education subsector, the
Special Education Fund (SEF).

- considered major partners of the national government in the


delivery of basic education services

- Their participation particularly in providing funding support


is critical in achieving the Education for All (EFA) targets.

5
3. The Philippine Amusement and Gaming Corporation (PAGCOR)
- have assisted in building schools and supplies for students of
all ages across the Philippines

6
Rationale
or
Background
PROBLEMS

8
 The holding capacity of LNHS Gymnasium is
not enough to accommodate the recent
population of enrolled students.
 Students don’t want to sit on the ground
during a program or an activity and they don’t
feel comfortable being exposed to the sun
especially if some activities are held during
daytime.
9
 because of the limited space of the gymnasium
instead of listening students go to the canteen
or even stay in their classrooms.
 time activities are cancelled due to bad
weather conditions.

10
SIGNIFICANCE
11
 The project could be a bridge to connect social
relationship among students.
 The school will be able to successfully
perform activities without any existence of
different barriers
 Other school functions such as musical, drama
plays, PTA Meetings, forums and orientation
will be managed auspiciously
12
 With an auditorium, we will have a secure
place to host events without the hassle of
weather disturbances because it is fully
covered.
 With an auditorium, electrical shortages are
not a problem because it has an energy
reserve.

13
Project
Description
GOALS AND OBJECTIVE
For the Benefits of the Students
Enhance School Capability
to Hold Events
Etc.

15
Project timeline: As soon as the project is
approved by various heads and the
principal, and has been given specific fund
by the funding agencies, it will be due
around eleven months.

16
During the project’s construction, the construction area
will be enclosed by blue tarpaulins to indicate that the
place is under construction to ensure the safety of
students and workers. It has to be placed 2-meters
away from the main construction area. Specific
warning signs will also set to notify the public about
the danger the construction could bring. Construction
workers that will work should age from 18 years and
above to secure legality among them.
17
Time Plan
ACTIVITY TIME ALLOWANCE

Clearing the construction area 1 week

Setting of structural footing and 2 weeks


foundation

Base structure 7 months

18
Bleachers 1 month

Stage 1 month

Roof 2 weeks

Decoration and 3 weeks


Electrical installations
19
Project Needs and Cost
Budget Materials Quantity Size Purpose
(PHP)
1,076,400 Steel 30 tons Standard They provide structural
Beams support to buildings.
936,000 Angle Bars 30 tons Q195-Q420 Angle bars are utilized
Series to support beams.
134,640 Concrete 8,976 Retaining walls are
Blocks one of its uses, provide
strength and stability.

20
520,000 Deformed 20 tons 20mm Are used as a tension
Bars device in reinforced
concrete.

798,000 Cement 3,000 1 Bag Used to make things


Bags stick together and to
make concretes

3,405,000 Sand and 30 tons Substances added to


Gravel cement.

300,700 Arched 1,002 3mm Provide more flexible


Metal Roof pieces roofing.

21
686,000 Tripled 250 Per meter Are soundproof
Glazed pieces window glasses
Windows

3,000,000 Others To sustain and


(Electrical supply electricity.
System)

200,000 Water Cubic To sustain and


System meters supply water.
12,846,740 Total

22
Personnel: Construction Manager, Estimator,
Architect, Supervisor, Construction Expeditor,
Construction Worker, Engineer, Construction
Foreman, Electrician

Equipment: Hand Tools, Power Tools, Electrical


Tools, Pneumatic Tools

Labor: 1,790,000
24
Architectural
Design

“Education is one of the
most powerful weapons in
fighting poverty.”

26
GROUP 1

John Christdel Causing


Jericho Francesco Jandongan
Niel John Gutierrez
Earl John Sepaya
Kristyl Joy Anas
Kristine Joy Bidar