Académique Documents
Professionnel Documents
Culture Documents
TOTAL
LGU
PROJECT DA Allocation
Counterpart
ALLOCATION
85% 15%
100%
ALL PROJECTS
BY
SHALL BE
CONTRACT
IMPLEMENTED
THROUGH THE FOLLOWING SCHEME:
• Centralized procurement shall be conducted at DA Regional Field
Unit/Office upon submission of project documents and uploading of
LGU cash counterpart.
• Procurement at LGU level may be conducted for projects costing
below PhP 5Million.
DA 85% project allocation shall be release/downloaded in
tranches (50%-40%-10%) to the concerned LGUs upon complying
with the requirements stipulated in the approved Implementing
Mechanism.
SOCSKSARGEN FOOD SECURITY
PROGRAM
PROJECT IMPLEMENTATION GUIDELINES
(Under the approved Implementation Mechanism of the SOCSKSARGEN Food Security Program)
PROJECT IDENTIFICATION/PRIORITIZATION
PROJECT PREPARATION
PROJECT REVIEW
PROJECT APPROVAL
PROCUREMENT
PROJECT IMPLEMENTATION
PROJECT COMPLETION
PROJECT TURN-OVER AND ACCEPTANCE
SOCSKSARGEN FOOD SECURITY
PROGRAM
STRUCTURAL FLOW/SCHEDULE FOR PROJECT IMPLEMENTATION AND MONITORING
POST PROJECT
PRE- CONSTRUCTION BIDDING IMPLEMENTATION IMPLEMENTATION/
PHASE PROCESS PHASE OPERATIONALIZATIO
N
6 Months (July – December) 28 – 113 Calendar Variable – (As per project Upon project
Days (1st Semester of a duration stipulated in the completion and turn-
CY) as stipulated in approved Project Program over
RA 9184 & its IRR of Works)
DA
DA
SOCSKSARGEN
SOCSKSARGEN IMPLEMENTING
IMPLEMENTING LGU/
LGU/
IMPLEMENTING
IMPLEMENTING Regional
Regional
TECHNICAL
TECHNICAL AGENCY/
AGENCY/ RECIPIENT
RECIPIENT OF
OF
LGU/
LGU/ AGENCY
AGENCY Field
Field Unit
Unit
TEAM
TEAM (TT)
(TT) CONTRACTORS
CONTRACTORS PROJECT
PROJECT
Office
Office
Design and
Specifications
Preparation
SOCSKSARGEN FOOD SECURITY
PROGRAM
PROJECT IMPLEMENTATION PROCESS FLOW
P r e – Construction P r o c e s s
T
E Procurement (BIDDING)
C Process to be conducted by
H DA RFU XI BAC
N Technical Review
I
by
C
A
SOCSKSARGEN
L Technical Team Uploading of LGU As provided by RA
Cash Counterpart 9184 and it Implementing
Fund revised IRR ADP-LGU conducts Agency
R
pre Construction /Contractor
E
V Conference implement the
I Projects to be implemented by Contract* at LGU project
E
Approval by
W
LGU / DA RFU
(POW/Plans /MOA / Procurement (BIDDING) Mobilization Fund
L Process to be conducted by (released upon
Other Pertinent
T recommendation of ADP
Documents) PLGU/CLGU
T PMU and Implementing
LGU)
-
L
G Downloading of DA
U Allocation in
tranches as
provided in the
approved
implementing
mechanism
*Under the approved Implementation Mechanism of the SOCSKSARGEN Food Security Program ALL projects under the program will be undertaken by contract
SOCSKSARGEN FOOD SECURITY
PROGRAM
PROJECT IMPLEMENTATION PROCESS FLOW
P R O J E C T C O N S T R U C T I O N/C O M P L E T I O N
Downloading of DA
Allocation in tranches as
provided in the approved
implementing mechanism
PROJECT
OPERATIONALIZATION TURN-OVER/ACCEPTANCE OF THE PROJECT
THANK YOU