Commissioning
www.huawei.com
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 2
References
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 3
Objectives
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 4
Contents
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 5
Contents
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 6
Determining Commissioning Items
1. NE Commissioning Items
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 7
Determining Commissioning Items (cont.)
Checking the receive and It applies to the station where the SDH
transmit power of the Optional optical interface service is accessed.
optical interface
Testing the RF transmit Use the Web LCT to query the RF transmit
Required
power power.
Testing the active/standby It only applies to the equipment configured
cross-connect board Required with the active and standby cross-connect
switching boards.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 8
Determining Commissioning Items (cont.)
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 9
Determining Commissioning Items (cont.)
Testing the clock Check and ensure that the clock source
Required
tracing can be traced normally.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 10
Preparing Related Documents
The documents that are required include the engineering des
ign documents and commissioning guide documents.
Engineering design documents like :
OptiX RTN 600 Radio Transmission System Network Planning Document
OptiX RTN 600 Radio Transmission System Engineering Design Document
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 11
Preparing Tools
The tools that are required include the common tools, special tools and instruments. The recommended list is as
follows:
Type Description
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 12
Checking Commissioning Conditions
The NE commissioning conditions to be checked include the status of
the equipment as well as that of the laptop computer used in the
commissioning. The NE commissioning conditions are listed as follows:
The hardware installation of the equipment must be complete, and it should
pass the installation check.
The power supply of the equipment must be available.
The service signal cables connected to other equipment must be routed well.
The laptop computer must be installed with the Web LCT, and applications
should work normally.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 13
Checking Commissioning Conditions (cont.)
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 14
Summary
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 15
Contents
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 16
Contents
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 17
Powering On the Equipment
Prerequisites
The hardware installation of the equipment must be complete, and it should
pass the installation check.
The input power must be available.
The power switch of the input power (such as the power box of the cabinet)
must be turned off.
Tools and Instruments
Multi-meter
Procedure
Set the SYS-PWR switch on the PXC board to O.
Set the ODU-PWR switch on the IF board to O.
Turn on the input power switch of the cabinet.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 18
Powering On the Equipment (cont.)
testing the voltage and polarization of the input power at the access point (such
as the output terminal of the power box on the cabinet) by multi-meter. The
voltage should range from -38.4 V to -72 V.
Set the SYS_PWR switch on the PXC board to “I”.
If the fan is available, first check it is working normally after power on.
Wait for about 20 seconds, and then observe indicators of each board installed
in the IDU.
The PROG indicator on the SCC board should be first on. After it blinks
and is lit green for some time, it should be off.
For details on the board indicators, refer to the OptiX RTN 600 Radio
Transmission System Product Description.
Set the ODU-PWR switch on the IF board to “I”.
Note: The SYS-PWR and ODU-PWR switches on PXC and IF boards have the
locking device. They need to be slightly pull out before switch them.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 19
Testing Indicators
Prerequisites
The equipment must be powered on for more
than five minutes.
LAMP
Tools and Instruments TEST
button
None.
Procedure
Press the LAMP TEST button on the SCC
board, and indicators of all boards should be
on.
Release the LAMP TEST button, and indicators
of all boards should recover to the status before
the LAMP TEST button is pressed.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 20
Accessing the Web LCT
Prerequisites
The equipment must be powered on. NM interface
Tools and Instruments
Laptop computer installed with the Web LCT
Network cable
Procedure
Start the laptop computer, and log in to the
operating system. Run the Web LCT program.
Connect the network port on the laptop computer
to the ETH interface on the SCC board through
the network cable. The green indicators of the
ETH interface and network port should be on.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 21
Accessing the Web LCT (Cont.)
Set the IP address information of the computer, and log in to the NE. The
IP address should comply with the following conditions:
IP address: The IP address should be in the 129.9.0.0 network section and should
be different from the default IP address of the NE (129.9.191.240).
Subnet mask: 255.255.0.0.
Default gateway: Null.
Enter in the Address bar of the IE the address of the server to be logged in.
If the server is installed in the local computer, enter
http://127.0.0.1:8080/nglct/, and click the Turn to button.
In the login interface of the Web LCT, enter the user name and
corresponding password. Click Login. The default user name is admin,
and the default password is T2000. If the user name and password are
correct, the NE List page is displayed in the IE.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 22
Configuring the Data
Prerequisites
The documents that are required by data configuration must be available.
Tools and Instruments
Web LCT
Procedure
Before configuring the NE data, create the NE, log in and modify the ID
settings of the NE according to the requirements in the Network Planning
Document.
The OptiX RTN 600 can be configured in two modes, General Mode and
Wizard Mode. Users can choose the proper configuration mode depending on
the specific configuration scenarios. For details, refer to the OptiX RTN 600
Radio Transmission System Configuration Guide.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 23
Testing Transmit and Receive Optical Power
Prerequisites
The service data must be configured.
The 15-minute performance monitoring of the NE must be started.
The fiber connections must be normal.
Tools and Instruments
Web LCT
Fixed optical attenuator or variable optical attenuator
Procedure
Disable the automatic laser shutdown (ALS) function of the laser, and ensure
that transmission of the laser is enabled.
Query the 15-minute performance by using the Web LCT to obtain the values
of the transmit and receive optical power.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 24
Testing the Transmit and Receive Optical
Power (cont.)
Based on the queried values along with the specifications of optical
modules, judge whether they are within the normal value range. The receive
optical power should be 3 dB more than the minimum sensitivity and 5 dB
less than the minimum overload provided in the specifications.
If the values are beyond the normal range, adjust the optical power by
increasing or decreasing the number of attenuators to ensure that the receive
and transmit optical power is within the normal value range.
Perform the loopback test for the services upon the completion of the
optical power test. Ensure that no bit errors occur in five minutes.
Note: The attenuator should be connected to the receive end other than
the transmit end.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 25
Performing the Service Loopback Test
Prerequisites
The Web LCT must be logged in to successfully and its connection to the NE
must be normal.
The board must work normally.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 26
Performing the Service Loopback Test (cont.)
Procedure
Connect the board to be tested to the test instrument.
Issue the loopback command and observe the instrument for five minutes.
The services should be normal.
Repeat the above two steps to test each board.
The service loopback for the IF board can only be implemented by testing
the services of other service boards.
Adopt different loopback mode depending on the actually used instrument.
If the SDH analyzer is used to test the optical interface board, first use the
optical power meter to test the optical power before the test and use the
attenuator to ensure that the optical power is within the normal range. This
can protect the instrument and the board.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 27
Testing E1 Cable Connections
Prerequisites
The E1 port must be transferred through the DDF.
The service data must be configured.
Tools and Instruments
Web LCT
BER tester
Procedure
Connect the BER tester to the first E1 port of the OptiX RTN 600 at t
he DDF.
Set the corresponding E1 port to outloop by using the Web LCT.
Observe the BER tester. The AIS alarm displayed on the BER tester sho
uld be cleared.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 28
Testing E1 Cable Connections (cont.)
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 29
Testing the RF Transmit Power
Prerequisites
The service data must be configured and the performance monitoring of the NE
must be started.
The ATPC function must be disabled.
Tools and Instruments
Web LCT
Procedure
In the NE Explorer, select the ODU that requires querying the RF transmit
power and query RF Transmit Power in the performance events.
Browse the performance events in the window. The difference between the
queried value of the RF transmit power and the preset value should be less than
0.1 dB.
If the tested value is abnormal, contact Huawei for solutions.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 30
Testing Active/Standby Cross-connect Board
Switching
Prerequisites
The service data must be configured.
The 15-minute performance monitoring of the NE must be started.
The equipment must be configured with the active and standby cross-connect
boards.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 31
Testing Active/Standby Cross-connect Board
Switching (Cont.)
Procedure
Confirm the current working status of active and standby PXC boards and
no abnormal alarms by using the Web LCT.
Perform active/standby PXC board switching by Web LCT.
Query the working status of the active and standby PXC boards to check
whether the switching is performed normally.
Query the current and history alarms to check whether any alarm is
generated during the switching process.
After the test, restore the PXC board in slot 1 to the active board. Query
the alarms and ensure that the cross-connect board works normally.
If you use the BER tester to monitor the services, few bit errors may occur
during the switching process. The services, however, can recover
immediately after the switching is complete.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 32
Questions
What is the procedure to access Web LCT?
How should the E1 port be set and connected for testing the connections of E1 cables?
How to adopt the testing it quickly?
Why shall we disable the ATPC function when test RF transmit power?
What are the two modes in data configuration? What are the differences between them?
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 33
Summary
This chapter describes the prerequisites, tools and instruments, and
procedure for the NE commissioning items:
Powering on the equipment
Testing indicators
Accessing the Web LCT
Configuring the data
Testing the transmit and receive optical power
Performing the service loopback test
Testing the connections of E1 cables
Testing the RF transmit power
Testing the active/standby cross-connect board switching
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 34
Contents
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 35
Table of Contents
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 36
Aligning the Antenna
Prerequisites
The NE commissioning of the radio equipment at both ends of the same radio
link must be complete.
During the commissioning, the weather should be suitable and there should be
no rain/fog between stations.
The on-site conditions and personnel in charge of the antenna commissioning
must meet the requirements of operation at a high altitude.
Tools and Instruments
Wrench, multi-meter and intercom.
Note: If there are 2 antennas at each site, it needs to align the main
antennas and diversity antennas at both ends respectively. First align the
main antennas and then the diversity antennas. Both antennas at local site
should be aligned with the main antenna at opposite end.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 37
Aligning the Antenna (cont.)
Procedure
1. According to the designed received signal level (RSL) along with the
relationship curve between the VBNC and RSL described in the user documents
(shipped with the equipment) of the ODU, read the designed value of the VBNC.
2. Align the antennas at both ends approximately by using the specific tool
(telescope) or instrument (COMPASS or GPS). If the antennas at both ends are
not aligned approximately, the VBNC cannot be adjusted to the designed value.
3. Fix the antenna at the opposite end, and adjust the azimuth (elevation) of the
antenna at the local end in a wide range. Use the multi-meter to observe the
VBNC value of the ODU at the local end. At least three peak signals should be
detected and the voltage of the peak signal in the middle should be maximum.
When the VBNC reaches the maximum value, tighten the antenna. When the
antenna is being tightened, keep that the VBNC is always the maximum.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 38
Aligning the Antenna (cont.)
4. As step 3, adjust the elevation (azimuth) of the antenna. And tighten
it.
5. Tighten the antennas at the local end. Repeat steps 3 and 4 to adjust
the antennas at the opposite end and tighten them.
6. Repeat steps 3 to 5 for two to four times. When the RSL of the antenna
s at the local end and the remote end reach the maximum value, tighten
the antennas at both ends.
7. Test VBNC of ODUs at both ends by multi-meter. Read the actual receive p
ower level (RSL) by referring to the relationship curve between the VBNC
and RSL for the ODUs at both ends. The difference between actual RSL v
alue and it’s designed value should be ranged from -3 dB to +3 dB.
8. If the VBNC does not meet the above requirements, check whether the ante
nnas at both ends are approximately aligned by referring to the step2.
Also you can refer to the OptiX RTN 600 Radio Transmission System Main
tenance Guide for solutions.
9. After antennas aligning is complete, tighten all screws of the antenna
s.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 39
Testing the ECC
Prerequisites
Antenna alignment must be complete.
The NE must have access to the Web LCT.
Tools and Instruments
Web LCT
Precautions
Test the ECC at one end of the radio link.
Procedure
In the NE List page, click Add NE.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 40
Testing the ECC (cont.)
In the Add NE page, set the following attributes of the opposite NE
:
ID: ID of the opposite NE
Name: name of the opposite NE
Extended ID: extended ID of the opposite NE
Gateway Type: IP gateway
Gateway IP Address: IP address of the local NE
User Name: root (default)
Password: password (default for the user root)
Click OK. In this case, a row of data for the newly added NE is add
ed in the NE List page.
Observe Login Status of the newly added NE. Login Status should be
displayed as Logged In.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 41
Testing the E1 Service
Prerequisites
The E1 service must be available between stations and the service conf
iguration at each station must be correctly delivered.
Antenna alignment must be complete.
Tools and Instruments
BER tester and Web LCT
Procedure
At local site, connect the BER tester to the first E1 port.
At remote site, loopback the first E1 port by cable. If cable loopback
is unfeasible, set the software inloop for the first E1 port by Web LC
T.
Test the BER for 5 to 10 minutes by BER tester. No bit error should oc
cur.
Release all loopbacks.
Repeat the above four steps to test other E1 ports one by one.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 42
Testing the WS Service
Prerequisites
The WS service must be configured.
Antenna alignment must be complete.
Tools and Instruments
BER tester
Procedure
At local site, connect the BER tester to the WS port.
At remote site, perform the hardware inloop for the WS port.
Test the BER for 5 to 10 minutes by BER tester. No bit errors should
occur.
Release the loopback.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 43
Testing the order wire
Prerequisites
The order wire phone must be correctly installed at the station.
The data of the order wire must be configured.
Antenna alignment must be complete.
Tools and Instruments
None.
Procedure
Check the status of the order wire at the local equipment side. The status of
the order wire should meet the following requirements:
The ringing switch must be set to ON.
The dialing mode switch must be set to T, that is, the dual-tone dialing mode is
selected.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 44
Testing the Order wire (cont.)
Dial the order wire of the opposite equipment as follows:
Pick up the order wire, and press the TALK key on the front panel of the phone. The red
indicator on the upper right side of the front panel is on, accompanied by the dial tone.
Dial the order wire number of the opposite equipment. Normally, the voice quality is
good and the voice is clear.
Answer the order wire.
The maintenance personnel at the opposite equipment side dials the order wire of the
local equipment. Normally, the order wire rings and at the same time the red indicator
on the upper right side of the front panel is on.
Pick up the phone, and press the TALK key to talk. The red indicator on the upper right
side of the phone is on. Normally, the voice quality is good and the voice is clear.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 45
Testing the Clock Tracing
Prerequisites
The clock tracing priority list must be configured.
Tools and Instruments
Web LCT
Procedure
Query the current clock priority table by using the Web LCT.
According to the clock priority table, query whether the current clock tracing
source is traced normally.
If the active and standby PXC boards are configured, perform the
active/standby switching. This operation can check whether the current clock
source can be traced normally after the switching. After the test is complete,
restore the PXC boards in slot1 as active board.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 46
Testing the IF 1+1 Switching
Prerequisites
The equipment must be configured with the IF 1+1 protection.
Antenna alignment must be complete.
Tools and Instruments
BER tester and Web LCT
Note: The following procedure considers the E1 service between stations
as an example. If no E1 service is configured between stations, perform
the test through the configured WS service (only applicable in the SDH
radio).
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 47
Testing the IF 1+1 Switching (cont.)
Procedure
At local site, connect the BER tester to one E1 port.
At remote site, loopback an E1 port by cable. Or set the software i
nloop on an E1 port by web LCT when cable loopback is unfeasible.
Test the BER by BER tester. Confirm E1 service is normal.
View the working status of the protection group by using the Web LC
T. The Active Board of Device and Active Board of Channel should be
the active IF board.
Set the transmission status of the main ODU to mute by using the We
b LCT or power off the main ODU. This can trigger the IF 1+1 switch
ing.
View the working status of the protection group after the switching
by using the Web LCT. The Active Board of Device and Active Board o
f Channel should be the standby IF board. The HSB_INDI or HSM_INDI
alarm should be reported.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 48
Testing the IF 1+1 Switching (cont.)
View the BER by Web LCT.
In the 1+1 HSB protection or 1+1 SD protection, service should recover after
a transient interruption.
In the 1+1 FD protection, service just has some bit errors without interrupt
ion.
After switching is complete, test the BER for 5 to 10 minutes. No bit
errors should occur.
Set the transmission status of the main ODU to unmute by using the Web
LCT or powering on the main ODU.
If the protection mode is set to Revertive mode, test the BER again by
using the BER tester. When the restore time arrives, the result should
indicate that the service has recovered after a transient interruption
. WTR Time is set to 600s by default. Test the BER according to the r
equirements of the actual configuration.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 49
Testing the SNCP Switching
Prerequisites
The equipment must be configured with the SNCP protection.
Antenna alignment must be complete.
Tools and Instruments
BER tester and Web LCT
Procedure
At local site, connect the BER tester to one E1 port.
At remote site, loopback the corresponding E1 port by cable. O
r set inloop on the E1 port by web LCT when cable loopback is
unfeasible.
Test the BER by BER tester. Confirm E1 service is normal.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 50
Testing the SNCP Switching (cont.)
Check SNCP status of E1 service by Web LCT. And status should be normal.
Trigger the SNCP switching by disconnecting the fiber connectors or poweri
ng off the ODU in the working channel of the E1 SNCP service.
View the abnormal events of the NE by Web LCT. The abnormal events of SDH
SNCP Switching are displayed in Abnormal Event List.
View the BER test result. The result should indicate that the service has
recovered after a transient interruption.
Reconnect the fiber connector or power on the ODU.
In the Revertive mode, when the restore time arrives, the BER tester resul
t should indicate that the service has restored back. WTR Time is set to 6
00s by default.
Test the BER depending on the requirements of the actual configuration.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 51
Testing the 24-Hour BER
Prerequisites
Antenna alignment must be complete.
Tools and Instruments
BER tester and Web LCT
Precautions
If the 24-hour BER cannot be tested for each hop on the link because of the
restrictions of the actual situation, choose the E1 service of the first node and
terminal node of each link to perform this test. This operation ensures that
the test path covers all the radio links.
The following test procedure considers the E1 service between stations as an
example. If no E1 service is configured between stations, perform the test
through the configured WS service (only applicable in the SDH radio).
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 52
Testing the 24-Hour BER (cont.)
Procedure
At local site, extract several typical
E1 services, and perform the hardware i
nloop for the E1 ports. If the hardware
inloop is unfeasible, perform the softw
are inloop for the E1 ports by using th
e Web LCT.
At remote site, connect the E1 services
in a serial manner at the DDF, and acce
ss them to the BER tester.
Test the 24-hour BER by using the BER t
ester.
Record the test result. The result shou
ld indicate that no bit errors occur.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 53
Testing the 24-Hour BER (cont.)
Postrequisites
If bit errors occur in the first 24-hour BER test, remove the fault. Perform
another 24-hour BER test until the test is passed.
If bit errors occur in the test for a serial connection, locate the fault by using
the dichotomizing search or other methods until each channel passes the 24-
hour BER test independently.
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 54
Questions
What is the procedure to aligning antennas?
How long should it take to test the E1 service and WS service respectively by using the BER tester?
How should we handle bit errors occurring in the 24-hour BER test?
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 55
Summary
The commissioning items in hop commissioning:
Aligning the antenna
Testing the ECC
Testing the E1 service
Testing the WS service
Testing the order wire
Testing the clock tracing
Testing the IF 1+1 switching
Testing the SNCP switching
Testing the 24-hour BER
Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 56
Thank You